JOB PERTAMINA – MEDCO E&P SIMENGGARIS

PROJECT TITLE: SOUTH SEMBAKUNG DEVELOPMENT

DOCUMENT TITLE: MECHANICAL DATA SHEET - TRANSFER PUMP (UPDATE)

DOCUMENT NO. SMN-M-DS-31-008

BERCA ENGINEERING
INTERNATIONAL

CONTRACTOR JOB P-MEPS


REV DATE DESCRIPTION
PREPARED CHECKED APPROVED APPROVED

0 30-03-2011 ISSUED FOR CONSTRUCTION RMP HA WHY/TRK

0A 15-10-2020 ISSUED FOR REVIEW MS AND WHY/SD AY AZ

0B 02-11-2020 ISSUED FOR APPROVAL MS AND WHY/SD AY AZ

1 20-11-2020 ISSUED FOR BID MS AND WHY/SD AY AZ


Wahyu Digitally signed
by Wahyu Yuliadi
Malvinas Digitally signed by
Malvinas sari ANDRIAN Digitally signed by
ANDRIANTO Yuliadi
Date: 2020.11.20
15:47:21 +07'00'
sari Date: 2020.11.20
07:19:29 +07'00' TO Date: 2020.11.20
07:19:45 +07'00'

UNAUTHORIZED COPYING OF THIS DOCUMENT IS NOT PERMITTED.

WO No: REV.
JOB P-MEPS
002/08/2020/903982 (NON OPL) 1

DISCIPLINE: Page
SIMENGGARIS BLOCK
MECHANICAL 1 of 7
MECHANICAL DATA SHEET PT. BERCA ENGINEERING
FOR TRANSFER PUMP INTERNATIONAL
SMN-PBA-331

Revision : 1
SIMENGGARIS BLOCK
Date : 20-11-2020

COMMENT SHEET
Incorporated
Rev Section Page Comment Description
(Y/N)
Update base on Doc.No. SMN-R-
Operating Update process data for next
0B 3 Y CC-36-007 TRANSFER PUMP
condition revision
SIZING (UPDATE), Rev.2B.
Nozzle
0B 4 Rating of Flange #300 Y Comment incorporated.
Connection
Liquid Update range viscosity base on
1 3 Y Comment incorporated.
Caracteristic process calculation
Update NPSH base on MOM
Operating weekly meeting 8849-MOM-CTR-
1 3 Y Comment incorporated.
condition 70/71-2020-WEM010 05
November 2020

Doc. No: SMN-M-DS-31-008 Page 2 of 7


CLIENT
MECHANICAL DATA SHEET FOR Page : 3 OF 7
Doc. No : SMN-M-DS-31-008
TRANSFER PUMP Rev. : 1
SMN-PBA-331 By : MS
Rev. Cheked : AND
Date Description
No. Appr'd : WHY/SD
CONSULTAN 0 30-03-2011 ISSUED FOR CONSTRUCTION
0A 15-10-2020 ISSUED FOR REVIEW PT BERCA ENGINEERING
0B 02-11-2020 ISSUED FOR APROVAL INTERNATIONAL Date
1 20-11-2020 ISSUED FOR BID

PT. BERCA ENGINEERING INTERNATIONAL


JOB-MEPS Date
Project Title : SOUTH SEMBAKUNG GAS PLANT Item No. : SMN-PBA-331
Location : SOUTH SEMBAKUNG, EAST KALIMANTAN Service : CONDENSATE
Doc. No. : SMN-M-DS-31-008 No. of Reqd : 1 x 100 %
Area : SIMENGGARIS BLOCK Design Code : API 610, LATEST EDITION
1 APPLICABLE TO: PROPOSAL APPLICABLE NTL/INTNTL STANDARD: API 610, LATEST EDITION
2 FOR JOB PERTAMINA - MEDCO E&P SIMENGGARIS UNIT 1 (ONE)
3 SITE SOUTH SEMBAKUNG, EAST KALIMANTAN SERVICE CONDENSATE
4 NO. REQ 1 x 100% PUMP SIZE * TYPE * NO. STAGES *
5 MANUFACTURER * MODEL * SERIAL NO. *
6 PUMP TAG NO. SMN-PBA-331 PUMP MOTOR TAG NO. *
7 LIQUID CHARACTERISTICS
8 Units HP Case HP-LP Case LP Case Data Lemigas SERVICE : INTERMITTENT
9 LIQUID TYPE OR NAME: CONDENSATE * IF INTERMITTENT NO. OF STARTS : −
10 VAPOR PRESSURE: PSIA 14.7 14.70 PUMPS OPERATE IN: −
11 DENSITY: lb/ft3 57.67 60.60 61.01 49.65 (NOTE 16) CORROSION DUE TO : (6.12.1.9) N/A
12 SPECIFIC HEAT: KJ / kg-C EROSION DUE TO : (6.12.1.9) N/A
1
13 VISCOSITY: cP 2.99 6.82 7.59 1.50 H2S CONCENTRATION (ppm) : (6.12.1.9) N/A
14
15 OPERATING CONDITIONS (NOTE 11 & 16) CLORIDE CONCENTRATION (ppm) : N/A
16 Units Minimum Rated Normal Maximum PARTICULATE SIZE (DIA IN MICRONS) N/A
17 NPSHa Datum: C.L. Impeller PARTICULATE SIZE CONCENTRATION N/A
18 PUMPING TEMPERATURE : °F 116.9
19 FLOW : USGPM 140 127.27
20 DISCHARGE PRESSURE : (6.3.2) PSIG 147.69
21 SUCTION PRESSURE : PSIG 2.44 2.95
22 DIFFERENTIAL PRESSURE : PSI 145
23 DIFFERENTIAL HEAD : ft 350.54
24 NPSHA : ft 6.96 1
25 HYDRAULIC POWER : HP 11.83
26
27 SITE AND UTILITY DATA

28 LOCATION: COOLING WEATER :


29 OUTDOOR UNHEATED INLET RETURN DESIGN
30 MOUNTED AT : CONCRETE TROPICALISATION REQD TEMP °F N/A MAX N/A N/A
31 ELECTRIC AREA CLASSIFICATION: 6.1.22 PRESS. PSI N/A MIN N/A N/A
32 ZONE 2 CLASS IA TEMP CLASS T3 SOURCE N/A
33 SITE DATA : COOLING WATER CHLORIDE CONCENTRATION: N/A ppm
34 ELEVATION (MSL) : 4.85 ft BAROMETER : 14.7 psi INSTRUMENT AIR : MAX N/A PSI MIN N/A PSI
35 RANGE OF AMBIENT TEMPS: MIN / MAX 75.59 / 88.01 °F STEAM
36 RELATIVE HUMIDITY: MIN / MAX 70.33 / 94.73 % DRIVERS HEATING
37 UNUSUAL CONDITION: − TEMP °F Max N/A N/A
38 Min N/A N/A
39 UTILITY CONDITIONS : PRESS. PSI Max N/A N/A
40 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min N/A N/A
41 VOLTAGE 400
42 PHASE 3
43 HERTZ 50
44
45 PERFORMANCE DRIVER (7.1.5)

46 PROPOSAL CURVE NO. * RPM * Driver Type ELECTRIC MOTOR (NOTE 12)
47 As Tested Curve No. * * GEAR *
48 IMPELLER DIA.: RATED * MAX. * MIN. * inch VARIABLE SPEED REQUIRED *
49 RATED POWER * HP EFFICIENCY 60 * (%) SOURCE OF VARIABLE SPEED *
50 RATED CURVE BEP FLOW (at rated impeller dia) * USGPM OTHER
51 MIN FLOW : THERMAL * m3/s STABLE * USGPM MANUFACTURER * (NOTE 12 & 19)

52 PREFERED OPERATING REGION (6.1.11) * to * USGPM NAMEPLATE POWER * HP


53 ALLOWABLE OPERATING REGION * to * USGPM Nominal RPM *
54 MAX HEAD @ RATED IMPELLER * ft RATED LOAD RPM *
55 MAX POWER @ RATED IMPELLER (6.8.9) * HP FRAME OR MODEL *
56 NPSH3 AT RATED FLOW : (NOTE 18) ft ORIENTATION *
57 CL PUMP TO U/S BASEPLATE * ft LUBE GREASE
58 NPSH MARGIN AT RATED FLOW * ft BEARING TYPE:
59 SPECIFIC SPEED (6.1.9) USGPM, rpm, ft * RADIAL ANTI FRICTION *
60 SUCTION SPECIFIC SPEED LIMIT 11000 (NOTE 15) THRUST ANTI FRICTION *
61 SUCTION SPECIFIC SPEED USGPM, rpm, ft * STARTING METHOD DOL
62 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) 85 @ 3 ft (dBA) SEE DRIVER DATA SHEET
63 EST MAX SOUND PRESS. LEVEL * (dBA)
64 MAX. SOUND POWER LEVEL REQD (6.1.14) *
66
CLIENT MECHANICAL DATA SHEET FOR Page : 4 OF 7
Doc. No : SMN-M-DS-31-008
TRANSFER PUMP Rev. : 1
SMN-PBA-331 By : MS
Rev. Cheked : AND
Date Description
No. Appr'd : WHY/SD
CONSULTAN 0 30-03-2011 ISSUED FOR CONSTRUCTION
0A 15-10-2020 ISSUED FOR REVIEW PT BERCA ENGINEERING
0B 02-11-2020 ISSUED FOR APPROVAL INTERNATIONAL Date
1 20-11-2020 ISSUED FOR BID

PT. BERCA ENGINEERING INTERNATIONAL


JOB-MEPS Date
Project Title : SOUTH SEMBAKUNG GAS PLANT Item No. : SMN-PBA-331
Location : SOUTH SEMBAKUNG, EAST KALIMANTAN Service : CONDENSATE
Doc. No. : SMN-M-DS-31-008 No. of Reqd : 1 x 100 %
Area : SIMENGGARIS BLOCK Design Code : API 610, LATEST EDITION

1 CONSTRUCTION

2 API PUMP TYPE (NOTE 11) [Based on API 610 definitions] CASING MOUNTING: *
3 CASING TYPE: (6.3.10) *
4 NOZZLE CONNECTION (6.5.5) BACKPULLOUT LITING DEVICE REQD. (9.1.2.6) *
5 Size Facing Rating Position CASE PRESSURE RATING:
6 SUCTION 4" * RF * 300 * * MAWP : (6.3.6) * PSIG @ * °F
7 DISCHARGE 3" * RF * 300 * * HYDROTEST : * PSIG @ * °F
8 PRESSURE CASING AUX. CONNECTION: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST OH PUMP ASSEMBLY
10 BALANCE/LEAK OFF SUCTION PRESS. REGIONS DESIGNED FOR MAWP *
11 DRAIN * * * * * ROTATION: (VIEWED FROM COUPLING END) *
12 VENT • IMPELLERS INDIVIDUALLY SECURED : *
13 PRESSURE GAUGE • BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION : *
14 TEMP GAUGE • PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS *
15 WARM-UP LINE ROTOR:
16 SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3) *
17 Drain Valve Supplied By VENDOR First Critical Speed Wet (Multi stage pumps only) *
18 DRAINS MANIFOLDED − COMPONENT BALANCE TO ISO 1940 G1.0 *
19 VENT Valve Supplied By VENDOR SHRINK FIT - LIMITED MOVEMENT IMPELLERS (9.2.2.3) *
20 VENTS MANIFOLDED −
21 THREADED CONS FOR PIPELINE SERVICE & < 50 °C (6.4.3.2) − COUPLING: (7.2.3) (7.2.13.F)
22 SPECIAL FITTINGS FOR TRANSIONING (6.4.3.8) − MANUFACTURER as per AML
23 CYLINDRICAL THREADS REQUIRED (6.4.3.8) − MODEL *
24 GUSSET SUPPORT REQUIRED − RATING (POWER/100 RPM) * Inch
25 MACHINED AND STUDDED CONNECTIONS (6.4.3.12) * SPACER LENGTH *
26 VS 6 DRAIN − SAFETY FACTOR 1.5
27 DRAIN TO SKID EDGE * RIGID YES
28 COUPLING WITH HYDRAULIC FIT (7.2.10) *
29 MATERIAL (6.12.1.1) (NOTE 4) COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.11) *
30 APPENDIX H CLASS S-6 * MATERIAL GROUP * COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11) *
31 MIN DESIGN METAL TEMP (6.12.4.1) * °F COUPLING IN COMPLIANCE WITH (7.2.4) *
32 REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1) * COUPLING GUARD STANDARD PER (7.2.13.a) *
33 Applicable Hardness Standard (6.12.1.12.3) * Window on Coupling Guard *
34 BARREL : Carbon Steel *
35 CASE : Carbon Steel * BASEPLATE

36 DIFFUSERS 12% CHROMIUM * API BASEPLATE NUMBER : *


37 IMPELLER : 12% CHROMIUM * BASEPLATE CONSTRUCTION (7.3.14) *
38 IMPELLER WEAR RING : 12 % CROMIUM Hardened * BASEPLATE DRAINAGE (7.3.1) *
39 CASE WEAR RING : 12 % CROMIUM Hardened * MOUNTING : BOLTED ON CONCRETE /FOUNDATION
40 SHAFT : 4140 Alloy Steel * NON-GROUT CONSTRUCTION : (7.3.13) *
41 Bowl (if VS-type) − VERTICAL LEVELING SCREWS : *
42 Inspection Class LONGITUDINAL DRIVER POSITIONING SCREWS : *
43 BEARING AND LUBRICATION (6.10.1.1) SUPPLIED WITH : • GROUT AND VENT HOLES *
44 BEARING (TYPE / NUMBER): (6.11.4) Hydrodynamic Typ • DRAIN CONNECTION *
45 RADIAL ANTI FRICTION * / * MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5) *
46 THRUST ANTI FRICTION * / * MOUNTING PADS TO BE MACHINED (7.3.6) YES
47 REVIEW AND APPROVE THRUST BEARING SIZE : (9.2.5.2.4) PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET *
48 * OTHER
49 LUBRICATION : (6.10.2.2) (6.11.3) (9.6.1) (NOTE 1 & 10)
50 PRESSURE LUBE SYSTEM TO ISO 10438-ISO * (9.2.6.5) * REMARKS :
51 ISO 10438 DATA SHEETS ATTACHED 1. VENDOR SHALL PROVIDE DETAIL OF FONDATION BOLT INCLUDING
52 Pressurized Lube Oil system mounted on pump baseplate * ARRANGEMENT DRAWING OF THE BOLT AND SIZING
53 Location of Pressurized Lube Oil System mounted on baseplate :
54

55 INTERCONNECTION PIPING PROVIDED BY PURCHASER


56

57 OIL VISC. ISO GRADE .VG −


58 CONSTANT LEVER OILER : (NOTE 10)
CLIENT Page : 5 OF 7
MECHANICAL DATA SHEET FOR
Doc. No : SMN-M-DS-31-008
TRANSFER PUMP Rev. : 1
SMN-PBA-331 By : MS
Cheked : AND
Rev.No. Date Description
Appr'd : WHY/SD
CONSULTAN 0 30-03-2011 ISSUED FOR CONSTRUCTION
0A 15-10-2020 ISSUED FOR REVIEW PT BERCA ENGINEERING
0B 02-11-2020 ISSUED FOR APPROVAL INTERNATIONAL Date
1 20-11-2020 ISSUED FOR BID

PT. BERCA ENGINEERING INTERNATIONAL


JOB-MEPS Date
Project Title : SOUTH SEMBAKUNG GAS PLANT Item No. : SMN-PBA-331
Location : SOUTH SEMBAKUNG, EAST KALIMANTAN Service : CONDENSATE
Doc. No. : SMN-M-DS-31-008 No. of Reqd : 1 x 100 %
Area : SIMENGGARIS BLOCK Design Code : API 610, LATEST EDITION
1 INSTRUMENTATION SEAL SUPPORT SYSTEM MOUNTING

2 SEE ATTACHED API-670 DATASHEET N/A SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE (7.5.1.4)

3 ACELEROMETER (7.4.2.1) N/A

4 Number of Accelerometers IDENTIFY LOCATION ON BASEPLATE *


5 Mounting Location of Accelerometers

6 INTERCONNECTING PIPING BY SUPPLIER


7 PROVISION FOR MTG ONLY (6.10.2.10) N/A

8 Number of Accelerometers MECHANICAL SEAL (6.8.1) (NOTE 8)

9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET *
10 ADDITIIONAL CENTRAL FLUSH PORT (6.8.9) *
11 FLAT SURFACE REQUIRED (6.10.2.11) N/A HEATING JACKET REQ'D (6.8.11) *
12 Number of Accelerometers

13 Mounting Location of Accelerometers HEATING AND COOLING (6.1.17)

14 COOLING REQ'D *

15 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN *

16 PROVISION FOR VIB. PROBES COOLING WATER PIPING *

17 NUMBER PER RADIAL BEARING FITTINGS *

18 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS (NOTE 1)

19 COOLING WATER REQUIREMENTS:

20 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING * USGPM

21 HEAT EXCHANGER * USGPM

22 TEMPERATURE (7.4.2.3) N/A TOTAL COOLING WATER *

23 PROVISION FOR TEMP. PROBES HEATING MEDIUM *

24 RADIAL BEARING TEMP. OTHER *

25 NUMBER PER RADIAL BEARING HEATING PIPING *

26 THRUST BEARING TEMP.

27 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES

28 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6) *

29 TEMP. GAUGE (WITH THERMOWELLS) (9.1.3.6) VENT *

30 PRESSURE GAUGE TYPE DRAIN *

31 Remarks COOLING WATER *

32 TAG ALL ORIFICES (7.5.2.4) *

33 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8) *

34

35 COOLING WATER *

36 TAG ALL ORIFICES (7.5.2.4) *

37 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8) *

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64
CLIENT Page : 6 OF 7
MECHANICAL DATA SHEET FOR
Doc. No : SMN-M-DS-31-008
TRANSFER PUMP Rev. : 1
SMN-PBA-331 By : MS
Rev. Cheked : AND
Date Description
No. Appr'd : WHY/SD
CONSULTAN 0 30-03-2011 ISSUED FOR CONSTRUCTION
0A 15-10-2020 ISSUED FOR REVIEW PT BERCA ENGINEERING
0B 02-11-2020 ISSUED FOR APPROVAL INTERNATIONAL Date
1 20-11-2020 ISSUED FOR BID

PT. BERCA ENGINEERING INTERNATIONAL


JOB-MEPS Date
Project Title : SOUTH SEMBAKUNG GAS PLANT Item No. : SMN-PBA-331
Location : SOUTH SEMBAKUNG, EAST KALIMANTAN Service : CONDENSATE
Doc. No. : SMN-M-DS-31-008 No. of Reqd : 1 X 100 %
Area : SIMENGGARIS BLOCK Design Code : API 610, LATEST EDITION

1 SURFACE PREPARATION AND PAINT TEST

2 MANUFACTURER'S STANDARD YES SHOP INSPECTION (8.1.1) YES

3 OTHER (SEE BELOW) PERFORMANCE CURVE & DATA APPROVAL PRIOR TO SHIPMENT YES
4 SPECIFICATION NO. (NOTE 17)

5 TEST WITH SUBTITUTES SEAL (8.3.3.2.b) YES

6 PUMP: MATERIAL CERTIFICATION REQUIRED CASING YES

7 PUMP SURFACE PREPARATION (NOTE 17) (6.12.1.8) IMPELLER YES

8 PRIMER (NOTE 17) SHAFT YES


9 FINISH COAT (NOTE 17) OTHER
10 CASTING REPAIR WELD PROCEDURE APPR REQD YES

11 BASEPLATE (6.12.2.5) (6.12.3.1)

12 BASEPLATE SURFACE PREPARATION (NOTE 17) INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)

13 PRIMER (NOTE 17) (6.12.3.4.e) MAG PARTICLE NO

14 FINISH COAT (NOTE 17) RADIOGRAPHY YES

15 DETAILS OF LIFTING DEVICE (NOTE 17) LIQUID PENETRANT YES

16 ULTRASONIC YES (IF REQ.)

17 SHIPMENT: (8.4.1) YES INSPECTION REQUIRED FOR CASTINGS

18 EXPORT BOXING REQUIRED YES MAG PARTICLE NO

19 OUTDOOR STORAGE MORE THAN 6 MONTHS YES RADIOGRAPHY YES

20 LIQUID PENETRANT YES

21 SPARE ROTOR ASSEMBLY PACKAGE FOR: ULTRASONIC YES (IF REQ.)

22 ROTOR STORAGE ORIENTATION (9.2.8.2) N/A HARDNESS TEST REQUIRED (8.2.2.7) −


23 SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3) ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3)

24 N/A FOR

25 N2 PURGE (9.2.8.4) N/A METHOD

26 SPARE PARTS PMI TESTING REQUIRED (8.2.2.8)

27 START-UP YES, LIST OF 2 YEARS OPERATION (SEPARATELY QUOTED) COMPONENTS TO BE TESTED

28 NORMAL MAINTENANCE

29 WEIGHTS kg RESIDUAL UNBALANCE TEST (J.4.1.2)


30
31 ITEM No PUMP DRIVER GEAR BASE TOTAL NOTIFICATION OF SUCCESSFUL SHOP

32 SMN-PBA-331 * * * * * PERFORMANCE TEST (8.1.1.c) (8.3.3.5) YES

33 BASEPLATE TEST (7.3.21)

34 HYDROSTATIC OBSERVE

35 HYDROSTATIC TEST FOR BOWL AND COLUMN (9.3.13.2)

36 OTHER PURCHASER REQUIREMENT PERFORMANCE TEST WITNESS

37 COORDINATION MEETING REQUIRED (10.1.3) YES TEST IN COMPLIANCE WITH (8.3.3.2)

38 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3)

39 MAX RELATIVE DENSITY TEST TOLERANCE TO (8.3.3.4)

40 OPERATION TO TRIP SPEED NPSH (8.3.4.3.1) (8.3.4.3.4) OBSERVE (NOTE 7)

41 MAX DIA. IMPELLERS AND/OR NO OF STAGES NPSH-1ST STG ONLY (8.3.4.3.2) OBSERVE (NOTE 7)

42 CONNECTION DESIGN APPROVAL (9.2.1.4) YES NPSH TESTING TO HI 1.6 OF ISO 9906 (8.3.4.3.3)

43 TORSION ANALYSIS / REPORT (6.9.2.10) TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)

44 PROGRESS REPORTS YES RETEST ON SEAL LEAKAGE (8.3.3.2.d)

45 OUTLINE OF PROC FOR OPTIONAL TEST (10.2.5) RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)

46 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1) WITNESS (NOTE 15)

47 SOUND LEVEL TEST(8.3.4.5) OBSERVE

48 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)

49 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION ON CLEANLINESS INSPECTION

50 DYNAMIC BALANCE ROTOR (6.9.4.4) NOZZLE LOAD TEST

51 INSTALLATION LIST IN PROPOSAL (10.2.3.1) (NOTE 9) CHECK FOR CO-PLANAR MOUNTING PAD SURFACE

52 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE

53 4 HR. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1) WITNESS (NOTE 13)

54 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) 4 HR. MECH RUN TEST (8.3.4.2.2) WITNESS (NOTE 14)

55 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)

56 IGNITION HAZZARD ASSMT TO EN 13463-1 (7.3.13.e) BRG HSG RESONANCE TEST (8.3.4.7)

57 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.4.7)

58 FLANGE RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST

59 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) (9.2.7.5)

60 CONNECTION BOLTING (7.5.1.7) * AUXILIARY EQUIPMENT TEST (8.3.4.6)

61 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO BE INCLUDE IN AUXILIARY TESTS

62 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c)

63 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) YES LOCATION OF AUXILIARY TEST

64 SUBMIT INSPECTION CHECK LIST (8.1.5) YES

65 PER EN 13445

66 PER ASME SECTION VIII

67 REMOVE CASING AFTER TEST


CLIENT Page : 7 OF 7
MECHANICAL DATA SHEET FOR
Doc. No : SMN-M-DS-31-008
TRANSFER PUMP Rev. : 1
SMN-PBA-331 By : MS
Rev. Cheked : AND
Date Description
No. Appr'd : WHY/SD
CONSULTAN 0 30-03-2011 ISSUED FOR CONSTRUCTION
0A 15-10-2020 ISSUED FOR REVIEW PT BERCA ENGINEERING
0B 02-11-2020 ISSUED FOR APPROVAL INTERNATIONAL Date
1 20-11-2020 ISSUED FOR BID

PT. BERCA ENGINEERING INTERNATIONAL


JOB-MEPS Date
Project Title : SOUTH SEMBAKUNG GAS PLANT Item No. : SMN-PBA-331
Location : SOUTH SEMBAKUNG, EAST KALIMANTAN Service : CONDENSATE
Doc. No. : SMN-M-DS-31-008 No. of Reqd : 1 X 100%
Area : SIMENGGARIS BLOCK Design Code : API 610, LATEST EDITION
1 PRESSURE VESSEL DESIGN CODE REFERENCES

2 THESE REFERENCES MUST BE LISTED BY MANUFACTURER

3 CASTING FACTORS USED IN DESIGN *


4 SOURCE OF MATERIAL PROPERTIES *
5

6 WELDING AND REPAIRS

7 THESE REFERENCE MUST BE LISTED BY PURCHASER. WELDING AND REPAIRS

8 ALTERNATE WELDING CODES AND STANDARDS *


9 WELDING REQUIREMENT (APPLICABLE CODE STANDARD) ASME BPVC IX OR ISO 9606

10 WELDER/OPERATOR QUALIFICATION ASME BPVC IX OR ISO 9606

11 WELDING PROCEDURE QUALIFICATION SO 15609 (all parts), ASME BPVC IX or ANSI/ASME B31.3

12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH US BASEPLATE OR SUPPORT SO 10721-2

13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES ASME BPVC VIII, Division 1, UG-93(d)(34)

14 POSTWELD HEAT TREATMENT Applicable material specification, EN 13445-4, ASME BPVC VIII,

15 Division 1, UW 40, or ANSI/ASME B31.3

16 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS Applicable material specification, EN 13445-4,

17 or ASME BPVC VIII, Division 1

18

19 MATERIAL INSPECTION

20 THESE REFERENCE MUST BE LISTED BY THE PURCHASER

21 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA

22 TYPE OF INSPECTION METHOD FOR FABRICATIONS FOR CASTINGS

ASME BPVC, Section VIII, Division 1, UW-51 (for 100 %


23 RADIOGRAPHY ASME BPVC, Section V, Articles 2 and 22 ASME BPVC, Section VIII, Division 1, Appendix 7
radiography) and UW-52 (for spot radiography)

24 ULTRASONIC INSPECTION ASME BPVC, Section V, Articles 5 and 23 ASME BPVC, Section VIII, Division 1, Appendix 12 ASME BPVC, Section VIII, Division 1, Appendix 7

25 MAGNETIC PARTICLE INSPECTION ASME BPVC, Section V, Articles 7 and 25 ASME BPVC, Section VIII, Division 1, Appendix 6 ASME BPVC, Section VIII, Division 1, Appendix 7

26 LIQUID PENETRAN INSPECTION ASME BPVC, Section V, Articles 6 and 24 ASME BPVC, Section VIII, Division 1, Appendix 8 ASME BPVC, Section VIII, Division 1, Appendix 7

In accordance with the material specification and the


27 VISUAL INSPECTION (all surface) ASME BPVC, Section V, Article 9 MSS SP-55
manufacturer's documented procedures

28

29 NOTES :

30 1). (*) VTA, VENDOR to advice/confirm.

31 2). N/A = Not Applicable

32 3). VENDOR to submit details of mechanical seal construction with proposal and seal type & plan recommendation from seal vendor.

33 4). Material of construction shall be suitable for the pumped product as specified in this datasheet and shall be as per Table H.1 of API 610, latest edition.

34 5). VENDOR to provide vent and drain valves with flanged connections.

35 6). Pumps shall be accordance with API 610, latest edition and Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

36 7). NPSHR test shall be performed accordance with Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

37 8). Mechanical seal shall in compliance with API 682 latest edition & Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

38 9). VENDOR to submit completed API 610, latest edition datasheet with proposal.

39 10.) Lubrication refer to Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

40 11.) VENDOR shall advise pump type selection for required process/operating condition as per API 610, latest edition & Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

41 12.) Spesification for motor driver shall refer to Doc. No. SMN-E-ES-41-005, "Specification for LV Induction Motor", latest revision.

42 13.) 4 hour mechanical run test after oil temperature stable shall be performed by VENDOR accordance to Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

43 14.) Performance test, 4-hour mechanical running test and complete unit test can be performed same period or in sequence (if required).

44 15.) Refer to Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)", latest revision.

45 16). See also Doc. No. SMN-R-CC-31-007, "Transfer Pump Sizing".

46 17). Refer to. Doc. No. SMN-M-ES-36-003, "Surface Preparation Painting and Galvanizing Spesification".

47 18). Refer to Doc. No. SMN-M-ES-34-001, "Spesification for Centrifugal Pump (API 610)" page 9, section 6.2 "Pump".

48 19). VENDOR should provide material as per company Prefered Manufacturer List.