Professional Documents
Culture Documents
Vendor IR. 01-PRI-PTK-II-2024 Final Inspection. Budi - 23-02-2024.
Vendor IR. 01-PRI-PTK-II-2024 Final Inspection. Budi - 23-02-2024.
Indonesia REPORT
Report No.: 01/PRI-PTK/II/2024 Date : 26 February 2024
Inspector: Budi Setiawan Page : 1 of 14
Equipment/goods inspected:
1. S/N: Single Pipe Tower KSPT/4865/01/02/24
2. S/N: Single Pipe Tower KSPT/4865/02/02/24
Scope of work:
Inspection result:
Satisfactory Partial non-conforming Rejected Aborted
Documentation:
Complete and in order not complete
Deviations found:
None to contract to drawings/Inspection Report to ITP / QCP / PO
(Please see separate nonconformance report)
Conclusion:
1. Random Visual Inspection & Random Dimensional Check. → Result: Primer layer coating,
General visual Welding & coating in good condition. And no found damage material
2. Documents: Review Incoming material, Cutting Marking, Dimensional & Welding. → Result:
1. Contractor Will be Provide Welding Map.
2. Contractor will be Provide certificate Marine Lantern Carmanah on Delivery complete
material
3. Painting Report will be Provide after complete painting
INSPECTION DETAILS
Material / Products / Components inspected:
QTY CHECK
NO. ITEM DESCRIPTION UNIT REMARK
. LIST
INSPECTION ACIVITIES
Activity/ITP/ Description of Activity with Inputs and Outputs Results
QCP No.
2.3 Visual Check Complete
Attachment
1. Berita Acara FAT KM 4865
2. Check List Inspection
3. Inspection Report QC KM 4865
4. Certificate Calibration: Roll Meter, Digital Thickness Coat Gauge & Vernier Calliper
Documentation Control:
Document name Version Approved by client
1. Berita Acara FAT KM 4865
- YES
PICTURES:
Visual & Dimensional - Check DFT Lantern Guard & Top Mark (2 EA)
TÜV Rheinland VENDOR INSPECTION
Indonesia REPORT
Report No.: 01/PRI-PTK/II/2024 Date : 26 February 2024
Inspector: Budi Setiawan Page : 11 of 14