EARTHING SYSTEM INSTALLATION

INSPECTION
No: EI-CON-ELE-01 Rev.:0 Date: 07-03-2023 Sheet 1 of 1

PROJECT: CONSTRUCTION CONTRACTOR:


SYSTEM/SUBSYSTEM: DRAWING:
TAG NUMBER: BAR CODE:
INCLUDED IN FOLDER:
REPORT NUMBER:
This certificate does not exempt the Construction Contractor from the Terms of the Contract, Project Specifications or Quality Procedures but confirms that all these Tests have been performed according to them.

SL Nº ITEM DESCRIPTION OK N/A P/L

Trench inspection before main earthing conductor pulling. Trench inside and backfilling
1
material should be free of big and sharp edged stones.

Earthing cable installed and routed according to the lastest drawing (AFC) and
2
specifications

3 Earthing Cable correct size

Earthing Cables and Electrode are buried the depth as per drawing (AFC) and
4
Specifications

5 Earthing Electrode according to drawings (AFC) and specifications

Distance between each Earthing Electrode and location shall be according to drawings
6
(AFC) and specifications

Ensure Earth Test Pit is not disturbed any other activities (traffic, passage ways) and
7
it's correctly installed.

Underground conduits stub up are properly installed according to drawings (AFC) and
8
specifications

9 Ensure the installation of earth bus bar is the same as approved drawing (AFC)

10 Earthing joints visual check (cadwelds, clamps, etc)

11 Earthing cable terminations correct and tight

12 Identification tag provided for earth pit / earth busbar

Ensure Structural Steel, Supports, Equipments, Frames, Steel Column, Flexible Ducts,
13
Cable Tray, conduit & Piping Earthing installation

OK = No objection ; N/A= not applicable; P/L = punch list item


REMARKS:

WITNESSED / REVIEWED CONSTRUCTION


EPCM CONSTRUCTION SUPERVISOR IPMT
BY: CONTRACTOR

SIGNATURE:

PRINT NAME:

DATE: