EI CON ELE 02 Lightning System Installation Check List
EI CON ELE 02 Lightning System Installation Check List
SYSTEM/SUBSYSTEM: DRAWING:
INCLUDED IN FOLDER:
REPORT NUMBER:
This certificate does not exempt the Construction Contractor from the Terms of the Contract, Project Specifications or Quality Procedures but confirms that all these Tests have been performed according to them.
LOCATION:
1 Lightning Arrester, rod and conductor installed and routed according to the lastest drawing (AFC) and specifications
4 Distance between each earthing electrode and location shall be according to drawings (AFC) and specifications
5 Ensure Earth Test Pit is not disturbed any other activities (traffic, passage ways) and it's correctly installed
6 Ensure the installation of earth bus bar is the same as approved drawing (AFC)
TEST EQUIPMENT
Next calibration Due Date:
Type: Manufacturer:
SIGNATURE:
PRINT NAME:
DATE: