Professional Documents
Culture Documents
EI-CON-CIV-04-Final Inspection of Filling Backfilling
EI-CON-CIV-04-Final Inspection of Filling Backfilling
PROJECT: SUBCONTRACTOR:
DRAWING: RFI No:
REPORT No.:
REPORT Date:
This certificate does not exempt the Subcontractor from the Terms of the Contract, Project Specifications or Quality Procedures but confirms that all these Tests have been performed according to them.
LOCATION / AREA:
Alignment / level approved and released for backfill (all release reports are available)
REMARKS:
WITNESSED /
SUBCONTRACTOR MAIN SUBCONTRACTOR EPC CONTRACTOR
REVIEWED BY:
Sign
Date