Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Things Of India (OPC) P. Ltd.

office : 47, New Grain Mandi Mukhay Daak Ghar , KOTA -324007 ( Raj.)
E-mail : thingsofindiaopc@gmail.com , Ph.: 7062712345

To, Date:03-05-2024

Sales Manager: Mr. Sarvesh


AgrawalAnonet
CommunicationsPvt.Ltd.
Corporate Office: A-19, Ground
Floor,Sec-16, Noida,UttarPradesh–
201301

KindAttn: SarveshAgrawal

Sub.:PurchaseOrderforNLDBandwidth
DOWNGRADE

DearSir,

Weare pleasedto placean orderof NLDBandwidth withbelow details.

Product: As per Annexure


ABandwidth: As per Annexure
ACommercials:As
perAnnexureAInstallationAddress:
BillingAddress

BillingTerms:Monthly
StaticIP:
DropInterface:
BGPrequired:
Bandwidth drop will be on BTS, customer will pull own fiber from
BTS.ContractPeriod:12months.
Deliverytimeline:3-4Weeks

ForThingsofIndia

AuthorizedSignatory
Annexure‘A
BTS Last
Sn Prod B/ Rate OT
ARC Detail- Miledetail BTSDetail-EndB LastMile detail-EndB
o. uct w /Mb C
EndA -End
A

1 NLD 250 52+GS 0 156000+T NOD/STE/9 Sify PTN/SNY/079) BCL , SRI. BIBEKA NAND PRASAD,
T AX 01 ,,S/O LATE GANGA PRASAD,
IDC,B-7, GROUND FLOOR , ,RAGHUNATH TOLA
Sector- BCL,Smt Meena Devi 406 DC05012006,,
132,
Sri Rabriksh, 406 Sabitra GARDANIBAGH PATNA,
Gautam 800001
Buddha
Nilayam Chitkohra
Nagar,N Anishabad Patna Ph. No-
oida(UP 9431003899,
)– 9835255666 , SABITRA
201307
NILAYAM-SNY, PATNA -
PTN BIHAR Phulwari
800002 Bihar &
Jharkhand
2 NLD 400 52+TA 0 249600+T NOD/STE/9 Sify ALX/GMC/001) BCL GBT 59 ALINAGAR, MUGHALSARAI,
X AX 01 Ram LalitKhata No 396 Gata MUGHALSARAI, UP, IND
IDC,B-7,
No 303/1 Gram Mugal Chak 232101
Sector-
ParganaDhuss Tehsil Chandauli
132, Distt Chandauli GRAM
Gautam MUGAL CHAK-GMC
Buddha ALINAGAR-ALX UTTAR
Nagar,N PRADESH Chandauli 232101
oida(UP UP East
)–
201307
3 NLD 200 52+TA 0 124800+T NOD/STE/9 Sify PAD/JPR/002),25.920510000 PAD/JPR/002),25.920510000
X AX 01 72.256390000 padam kumar 72.256390000 padam kumar sharma
IDC,B-7,
sharma pachpadra dist. Barmer pachpadra dist. Barmer 344032
Sector-
344032
132,
Gautam
Buddha
Nagar,N
oida(UP
)–
201307
4 NLD 200 57+TA 0 124800+T NOD/STE/9 Sify AUD/BHI/001),24.479260000, Ibrahim khan 3-a housing board
X AX 01 72.776490000 C/o Sh. Meena abu road manpur, revdar Abu
IDC,B-7,
Chanchalani, W/o Sh. Ashok 307514
Sector-
Chanchalani, Brahmapuri, Abu
132, Road, Dist. Sirohi 307026
Gautam
Buddha
Nagar,N
oida(UP
)–
201307

ForThings ofIndia

Authorized Signatory

TermsandConditions
1) AllpaymentshavetobemadeinfavorofANONETCOMMUNICATIONSPVT.LTD(“ACPL”).

2) PaymentsTerms:

 OTCas 100%inAdvancewiththePurchasedorder
 ARC-Monthlyadvance(MRC).1stmonthchargeswillbepaidinadvancewiththeP.O
 Thepricingdoesnotincludeanytaxeswhichwillbechargedextraatexistingprevailingrates.

2) Validity:MinimumContracttermis12monthsfromthedateoflinkdelivery.

3) ServiceDelivery:StandardImplementationtimeperiodis3-4week,Subjecttoclearthefeasibility.Nolastmile
accessshallbegivento anyISPCustomer.

4) Circuit Acceptance – ACPL will conduct the following tests on implemented circuit as per our
standardparameters.

 NLD/LocalLoop–PingandPacketLoss,andThroughput(UploadandDownload).
 Internet–
Ping(uptopeeringpoints),PacketLoss,andThroughput(UploadandDownload).Onsuccessful
testing of the above parameters, the circuit will be deemed ready for use &
foracceptancebycustomer.

5) BillingStartdate:48hourspostthehandoveroflink
byACPLtothecustomer.NoSeparateLOCsignoffshallbetaken fromthecustomer.

6) DelayinthePaymentterms:Paymentshouldbeclearbytheduedate.Anydelayintheabovewillattractlate
paymentcharges@12% p.a.oftheoutstandingamount.

7) Barringserviceonaccountofpaymentdelay:Serviceofall/delayedpaymentlinkswillbebarredifthepaymenti
snotreceivedwithin15daysposttheduedatewithoutanyobligationorliabilityofACPL

8) Services not stable 30days notice period no Exit charges applied


8) Service Restoration: In case of disconnection on account of non-payment, reconnection of the same
willbe undertaken within 3 days from the date of clearance of outstanding dues. In case of any
technicalconstraintfromACPLend,thelinkrestorationtimelinesshallbe extended.

9) ContractPeriod:Tenureofcontractstartwithchangeinserviceseitherupgradation/downgradat
ion/renewalin commercials.

10) Pre-TerminationPenalty&LinkShifting:Customerisallowedtoshifttheirbandwidthtoanyother
location at the prevailing rate. This will be affected basis a link of shift order. In case the shifting is in off-
netlocationACPLreserves therighttosaynoforconnectivityandthecustomerneedtobetakedeliveryfrom the
nearest point of presence. Link also can be terminated on non-solve able technical grounds
atanymomentincontactperiodwith no noticeperiod and no pre-terminationclause.

11) Upgrade: For any upgrade affected to the circuit, the upgrade circuit’s contract will also be for the
12months or mutuallyagreedFixed Rate Contract period.

12) Downgrade: Internet bandwidth will be not be downgraded before contract, if required that
preterminationchargeswillbe applicable ofbalance 12thmonthcontract.

13) Disconnection post completion of minimum contract period: A notice period of 30 days shall be given
bythe customer. Customer is liable to pay any charges of remaining period of fixed rate contract,
Ifapplicable.

14) Renewal:Allcontractswillberenewedaftercompletionof12-
monthcycleorFRCperiodwithexistingtermsand conditionsunlesscommunicatedotherwise.

15) Restalltermsandconditionsofmasterserviceagreementwillbeapplicableonthesenewlinks.

ForThings ofIndia

AuthorizedSignatory

You might also like