1 cement mortar
a dry vol. of cement mortar
40% x 1.85 m3
0.74 m3
b add 30% to fill up joint and cover surface
0.74 m3 x 0.3 m3 = 0.222 m3
total = 0.962 m3
1.2025 x 1/ 0.035 m3
7
1.2025 x 6x 1800
7
= 1855.2857 kg
Summary
tonne rate
Block 6x9 1.85 m3 x 2.6 mt = 27 = 70.2
291.4
1.85
157.5135
labour m3 100
257.5135
15% 38.62703
296.1405
for 3m height design
Volume of rubble stone
Volume of rubble stone
volume
length x width x height
1x 2.1 + 0.3 x
2
2.4 m3
cement mortar
dry vol. of cement mortar
40% x 2.4 m3
0.96 m3
add 30% to fill up joint and cover surface
0.96 m3 x 0.3 m3 =
total = 1.248 m3
1.56 x 1/ 0.035 m3
7
1.56 x 6x 1800
7
= 2406.857 kg
tonne rate
Block 6x9 2.4 0x 2.6 mt = 27
labour m3
15%
2
0.288 m3
+ 1.248 x 0.25
m3
x 50 kg/bag
1800
= 70.2
= 175
= 88.8
334
2.4
139.1667
100
239.1667
35.875
275.0417