for 2m height design

Volume of rubble stone


Volume of rubble stone
volume
length x width x height
1x 1.55 + 0.3 x 2
2
1.85 m3

1 cement mortar
a dry vol. of cement mortar

40% x 1.85 m3
0.74 m3
b add 30% to fill up joint and cover surface
0.74 m3 x 0.3 m3 = 0.222 m3
total = 0.962 m3

c increases by 25% of the total dry volume cement mortar


dry colume of mortar = 0.962 + 0.962 x 0.25

d total dry volume of mortar = 1.2025 m3

2 Amount of cement required (1:6)


note: 1 bag of cement = 0.035m3
Dry volume x cement ratio / voume of cement ba 1 bag= 50kg
sum of ratio

1.2025 x 1/ 0.035 m3
7

nos of bag require = 0.1717857


0.035
= 4.9081633 bag

reqiuire cement in kg = 4.9081633 bag x 50 kg/bag


= 245.40816 kg

3 Quantity of sand require

Dry volume x sand ratio / density of sand 1800 kg/m3


sum of ratio

1.2025 x 6x 1800
7

Quantity of sand require = 1.0307143 x 1800

= 1855.2857 kg

Quantity of sand require = 1.8552857 tonne

Summary
tonne rate
Block 6x9 1.85 m3 x 2.6 mt = 27 = 70.2

Cement 4.90816 bag 5 bag = 25 = 125

Sand 1.85529 tonne 2.6 mt = 37 = 96.2

291.4
1.85
157.5135
labour m3 100
257.5135
15% 38.62703
296.1405
for 3m height design
Volume of rubble stone
Volume of rubble stone
volume
length x width x height
1x 2.1 + 0.3 x
2
2.4 m3

cement mortar
dry vol. of cement mortar

40% x 2.4 m3
0.96 m3
add 30% to fill up joint and cover surface
0.96 m3 x 0.3 m3 =
total = 1.248 m3

increases by 25% of the total dry volume cement mortar


dry colume of mortar = 1.248

total dry volume of mortar = 1.56

Amount of cement required (1:6)


ag of cement = 0.035m3
Dry volume x cement ratio /
sum of ratio

1.56 x 1/ 0.035 m3
7

nos of bag require = 0.222857


0.035
= 6.367347 bag

reqiuire cement in kg = 6.367347 bag


= 318.3673 kg

Quantity of sand require

Dry volume x sand ratio /


sum of ratio

1.56 x 6x 1800
7

Quantity of sand require = 1.337143 x

= 2406.857 kg

Quantity of sand require = 2.406857 tonne

tonne rate
Block 6x9 2.4 0x 2.6 mt = 27

Cement 6.367347 = 7 bag = 25

Sand 2.406857 = 2.4 mt = 37

labour m3

15%
2

0.288 m3

+ 1.248 x 0.25

m3

note: 1 bag of cement = 0.035m3


voume of cement bag 1 bag= 50kg

x 50 kg/bag

density of sand 1800 kg/m3

1800

= 70.2

= 175

= 88.8

334
2.4
139.1667
100
239.1667
35.875
275.0417