DOCUMENT TRANSMITTAL SHEET

Engineering, Procurement and


Construction Contract in respect of H10-New Assembly Facility - GKI Ref. No. GKC-TRSDC-MAT-065
R10-H10C02 -OSM Shell & Core Material Submittal for GRP Lining
works for Sheybarah Hotel 10 Resort (Manufacturer/Supplier:-Ali Sharaf) Revision: 00
at The Red Sea Project

Issued By : Grankraft Industries LLC

Discipline : Structural

Issued Date : 22nd June 2022

TRSDC Ref. No. : R10-H10C02-GRR-MAT-ST-0035

From To Reason for Issue

Mr. Fuad Hasan


Grankraft Industries LLC Snr. Project Director Issued for Approval
The Red Sea Development Company

Cc: Site Team TRSDC

Name Mohammed Saleem

Signature

Attachment/Additional NA
Files/Documents (if any)

The attachment are been submitted to TRSDC via Aconex.


The Original Document is with the Project Document Controller of Grankraft Industries LLC

Revision History:

Rev. Remarks
Date Status TRSDC Reference No Description
No.
H10-New Assembly Facility -
R10-H10C02-GRR-MAT- Material Submittal for GRP Lining
00 22-06-2022 Issued for Approval
ST-0035 (Manufacturer/Supplier:-Ali
Sharaf)
Material Submittal Form
TRS-CN-FRM-0018

General Information
R10-H10C02-GRR-
Contractor Grankraft Construction LLC Submittal No.
MAT-ST-0035 Rev00
H10C02 GRR - OSM Shell & Core
Contract No. Date 22-Jun-22
works
Approved Subcontractor
To the Engineer The Red Sea Development Company NIL
(as applicable)

Material Information
Material Description
Material Submittal for GRP Lining
(One item only per Form)

As per Specification N/A Alternative NO


Drawing Reference N/A BOQ Ref. No. -
Specification Reference N/A Standards, BS, DIN

Manufacturer/Supplier
Company Name Ali Sharaf Locally Manufactured Yes
Address Dubai (UAE)
Local Agent Other Details
Program Date Expected Arrival Date
(Material Required on Site) (on Site)

Contractor’s

Anvar T Rehiman (Head of Structrual Enginnering 22-Jun-22


Name Signature Date

Design Consultant - Comments


Comments:

Name Signature Date

Engineer’s - Comments
Comments:

31/07/2022
Name Signature Date

Status Code

☐ Accepted ☐ Accepted with Comments ☐ Revise and Resubmit

☐ Rejected ☐ Review not Required

Material Submittal Form (TRS-CN-FRM-0018)


Revision 00, Rev. Date 05-May-2019 Page 1 of 1