Bur - premix

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

N0.

20-a, JALAN PLUMBUM 97/9 SEKSYEN


7, 40450 SHAH ALAM SELANGOR DARUL
EHSAN
TEL NO: 03-5510 3910; FAX
NO: 03-55103911
globalglobeconsultancy@yahoo.com
TITLE: CADANGAN MEROBOH BANGUNAN PEJABAT 3 TINGKAT SERTA CADANGAN ELEMENT/TRADE: ROOF FINISHES
TAMBAHAN DAN PERUBAHAN PADA BANGUNAN 5 TINGKAT SEDIADA YANG
TAKER OFF: CHECKER: PAGE:
MENGANDUNGI BLOK TEMPAT LETAK KERETA DAN PAVILION 2 TINGKAT,
KAFETERIA TERBUKA 1 TINGKAT, BLOK LIF PENUMPANG 5 TINGKAT, DAN PONDOK
PENGAWAL DI ATAS LOT PORTION 'A', SEKSYEN 70, JALAN DAMANSARA, MUKIM
SYAFIQ EZEE 1
KUALA LUMPUR, DAERAH WILAYAH PERSEKUTUAN, WILAYAH PERSEKUTUAN
KUALA LUMPUR.

DESCRIPTION: UNIT RATE

60mm (finishes) layer of asphalt concrete binder course spread and levels
M2 RM23.68
tofall and chambers and well rolled as specified

DATA MANIPULATION RM RM

1 MATERIAL COST

a) 60mm thk ACB


1m3 @ 2.1mt

RM160.00/mt x 2.1mt/m3 RM336.00


add 3% wastage RM10.08 RM346.08

2 PLANT AND MACHINERY COST

a) Paver : RM520/day @ 120m3/day

RM520.00/day ÷ 120m3/day RM4.33

b) Roller : RM660.00/day @ 120m3/day

RM660.00/day ÷ 120m3/day RM5.50 RM9.83

3 LABOUR COST

a) 2 plant operator

2 x 0.1 hour x RM80.00/8hours RM2.00

b) 1 general worker

1 x 0.1 hour x RM70.00/8days RM0.88 RM2.88


RM358.79

Convert to m2 / 60mm thk ACB


RM358.79/m3 x 0.06m RM21.53

Profit (2%) RM0.43


Overhead (8%) RM1.72
Others
FINAL TOTAL RM23.68 /m2
ROOF

N0. 20-a, JALAN PLUMBUM 97/9 SEKSYEN


7, 40450 SHAH ALAM SELANGOR DARUL
EHSAN
TEL NO: 03-5510 3910; FAX
NO: 03-55103911
globalglobeconsultancy@yahoo.com
TITLE: CADANGAN MEROBOH BANGUNAN PEJABAT 3 TINGKAT SERTA CADANGAN ELEMENT/TRADE: BRC REINFORCEMENT
TAMBAHAN DAN PERUBAHAN PADA BANGUNAN 5 TINGKAT SEDIADA YANG
TAKER OFF: CHECKER: PAGE:
MENGANDUNGI BLOK TEMPAT LETAK KERETA DAN PAVILION 2 TINGKAT,
KAFETERIA TERBUKA 1 TINGKAT, BLOK LIF PENUMPANG 5 TINGKAT, DAN PONDOK
PENGAWAL DI ATAS LOT PORTION 'A', SEKSYEN 70, JALAN DAMANSARA, MUKIM
SYAFIQ EZEE 1
KUALA LUMPUR, DAERAH WILAYAH PERSEKUTUAN, WILAYAH PERSEKUTUAN
KUALA LUMPUR.

DESCRIPTION: UNIT RATE

BRC A10 (A392) weight 6.16kg/m with 225mm side and 125mm end laps M2 RM26.64

DATA MANIPULATION RM RM

1 MATERIAL COST

a) Supply and Transport BRC A10 RM17.06

BRC size : 13.20 m2


Lapping : 12.02 m2
1.18 m2

laps percentage : 1.18 m2 x 100


13.20 m2

laps percentage : 9%
wastage : 5%
wire fastener &
10 %
spacer blocks :
total additional : 24 % RM4.09 RM21.15

2 PLANT AND MACHINERY COST

Price already allocated in preliminaries

3 LABOUR COST

a) Unloading and Stacking


1 x 0.15hour/m2 x RM70.00/8hours RM1.31

b) Cutting and fixing


1 x 0.2hour/m2 x RM70.00/8hours RM1.75 RM3.06
RM24.22

Profit (2%) RM0.48


Overhead (8%) RM1.94
ROOF

Others
FINAL TOTAL RM26.64 /m2