QUALITY MANUAL

INTRODUCTION TO THE PROCESSES REVISION NO 00


SECTION - 06
(PED) REVISION DATE

1. Overview of order execution:

Acknowledgement of
order

Distribution of work order to


Projects, Design, Production,
QA/AC

Design to Prepare & Submit Engg.


Docs to Client thro’ nominated
Project Engineer

QA/QC to prepare & submit quality


procedures to client thro’
nominated Project Engineer
YES Procure
Mtls. ?
Upon approval of docs Project
Engineer to procure Mtls. through
purchase department NO

Store to check & offer the


materials to nominated quality
inspector to clear the materials for
Production.

Upon materials clearance


production to fabricate the Items
as per the approved drawings and
documents.

During & after production all the


necessary inspections should be
offered to nominated Quality
Engineer/TPI/client representative

Upon inspection, the items shall


be packed & kept ready for
dispatch or dispatched to site

Upon receipt at site, the items


shall be erected, if in our scope

Handover @ Site