procedures to client thro’ nominated Project Engineer YES Procure Mtls. ? Upon approval of docs Project Engineer to procure Mtls. through purchase department NO
Store to check & offer the
materials to nominated quality inspector to clear the materials for Production.
Upon materials clearance
production to fabricate the Items as per the approved drawings and documents.
During & after production all the
necessary inspections should be offered to nominated Quality Engineer/TPI/client representative
Upon inspection, the items shall
be packed & kept ready for dispatch or dispatched to site