First Piece & Inprocess Inspection Report

Operation No. -10 & 20


Part No. - 0322 Opeartor Name-

Part Name - EXHAUST MAINFOLD Machine- VMC Date-

Operation Name - MILLING ,DRILLING ,TAPPING Shift-

Characteristics Method

First
Sr. no. Sample 1 2 3 4 5 6 7
Product / Process Evaluation Piece
Product
Spec. / Tol. Measurement Tech.
Freq.

CASTING REFERENCE 0.5 VERNIER


3
DRILLL 6.75 VERNIER
4
TAP M8*1.25 TPG
5

6 TAP DEPTH THROUGH VISUALLY

7 R/G GAUGE R/G GAUGE

8 FLATNESS 0.1 FILLER GAUGE


CASTING REFERENCE 0.5 VERNIER
9
CENTER DISTANCE 90.5
10

11

Remark

Operator Sign : Operator Sign :


First Piece & Inprocess Inspection Report
Operation No. -30 &40
Part No. - 0322 Opeartor Name-

Part Name - EXHAUST MAINFOLD Machine- VMC Date-

Operation Name - MILLING ,DRILLING ,TAPPING Shift-

Characteristics Method

First
Sr. no. Sample 1 2 3 4 5 6 7
Product / Process Evaluation Piece
Product
Spec. / Tol. Measurement Tech.
Freq.

TAP M10*1.5 TPG


3
TAP DEPTH 17+.5 VERNIER
4
SPOTFACE 23+1 VERNIER
5
SPOTFACE WIDTH 13±0.1 VERNIER
6
RECEIVING GAUGE R/G GAUGE
7

10

11

Remark

Operator Sign : Operator Sign :