BILL OF QUANTITIES
CONSTRUCTION AND RENOVATION OF PENSION OFFICE IN THE MINISTRY OF LABOURjRSS
CONTENTS
BILL NO. 1: CONST. OF PENSION OFFICE IN THE MINISTRY OF LABOUR/RSS
A. SITE CLEARANCE DEMOLITION WORK
B. FOUNDATION WORK
I C. GRADE & RING BEAM WORK
D. BRICK WORK
E. ROOFING WORK
F. CEILING WORK
G. PAINTING WORK
H. DOORS & WINDOW WORK
I. FLOORING WORK
1. PLUMBING SA ITARY WORK
K. ELECTRICAL WORK
L. INTER LOCK WORK
M. FENCE REHABILITATION WORK
BILL OF QUANTITIES
CONSTRUCTION ANDRENOVATION OF PENSION OFFICE IN THE MINISTRY OF LABOUR/RSS
Juba, Central Equitoria State
SUMMARV
Amount Amount
Item Description
SSP ( Per SO. M ) %
- B.
C.
D.
FOUNDATION WORK
BRICK WORK
E. ROOFING WORK
F. CEILING WORK
G. PAINTING WORK
K. ELECTRICAL WORK
L. INTER LOCK WORK
A. DEMOLITION
B. CONSTRUCTION WORK
C. WALLING WORK:
D. ROOFING WORK:
F. PLASTERING WORK:
G TILES WORK:
H PAINTING WORK:
I ELECTRICAL WORK:
J PLUMBING WORK:
K CEILING WORK:
25x300mm high timber valance board fixed to edges of the portal frames including
necessary fittings screws and nails etc. Rate shall include for application of approved
wood preservative as directed.
BILL OF QUANITIES
CONSTRUCTION ANDRENOVATION OF PENSION OFFICE IN THE MINISTRY OF LABOUR/RSS
I
BILL NO. 1: CONST. OF PENSION OFFICE IN THE MINISTRY OF LABOUR/RSS
A. Site clearance demolition of existing Building and disposal of the demolited Item I
as directed in the drawing.
B FOUNDATION WORK:
Excavate foundation Trenches not exceeding 0.8 deep 3 129
M
2. Fill in hard core to foundation trenches. 3 51,6
M
3. Remove the soil that excavate from site. 3 14,5
M
4. Back fill the soil to foundation. M 3 14,5
TOTAL CARIED TO FOUNDATION TRENCHES.
D BRICKWORK:
Provide Red brick and Build in Cement Mortar 1:8 2 387
M
TOTAL CARRIED TO BRICKS WORKS
E ROOFING WORKS:
I Provide truss and fix to the wall at build and roof 2 208
M
TOTAL CARRIED TO ROOFING
F CEILING WORK:
I. Provide ceiling Joists and fix to position 5cm x I Ocm LM 450
2. Provide cross beers 3cm x 3 cm and fix to Joists. LM 454
3. Provide iron Stripers and fix the wall plate into wall. No 74
4. Provide ceiling board and fix Joists. M2 208
TOTAL CARRIED TO CEILfNG
G PAINTING WORK:
I. Provide pomastic paint and paint the wall internally and externally. 774
M2
2. Provide Gallon paint.and paint the doors and the windows. M 2 47
3. Provide paint and paint the ceiling. M2 208
TOTAL CARRIED TO PAINTING.
I FLOORING WORKS:
I. Provide coarse and fine Aggregate with Cement mortar I :2:4 and place to M3 2
flooring.
2. Provide ceramics tiles with cement mortar. 1:6 M2 208
TOTAL CARRIED TO FLOORING
J PLUMBLING WORK:
I Provide and build septic tank 3 x3 x 4 including 2 rooms toilet outside. item I
K ELECTRIC WORK:
I Provide and install ate the electric in the build. item I
TOTAL CARRIED TO ELECTRIC WORK
M FE CE REHABILITATION WORK
I Provide and maintain the fence 20 x 40 Item I
2 Provide and supply paint for the fence item I
TOTAL CARRIED TO RE HA BI LIT A nON
SUMMARY
RATE
SINO DESCRLPTION
I UNIT
I QTY
I USD
I AMOUNTUSD
11
BILL NO. 2: RENOVATION OF PENSION OFFICE IN THE MINISTRY OF LABOUR/RSS
I. Removal of the whole existing plastering and disposal of the materials as Item I
directed.
2. Removal of the whole existing floor finishes and disposal of the removed I
materials as directed.
3. Removal of the whole existing roof and disposal of the removed materials Item I
as directed.
4. Removal of the whole existing windows and doors and placing them in a I
place as it is in the drawing.
5. Removal of the whole existing wall up to the ring beam level. Item I
6. Removal of the whole existing electrical installations and placing them in a Item I
place to be decided by engineer in charge.
SUB TOTAL
B CONSTRUCTION WORK:
BUILDING WORK:
7. Provide and supply materials for casting ring beam of mix 1:2:4 M3 2
SUBTOTAL
C WALLING WORK:
8 Provide and supply material for building the wall above the ring beam with M2 75
red bricks of mix 1:6.
SUB TOTAL
D ROOFING WORK.
9 Provide and supply material for roofing, using iron sheets various types of M2 220
nails various size of timber.
SUBTOTAL
F PLASTERING WORK:
11 Provide material for plastering the wall both internally and externally with M2 224
CM of mixture 1.6.
SUB TOTAL
G TILES WORK:
12 Provide and supply tiles and fix on the floor and on the wall of the toilet. M2 250
S B TOTAL
H PAl TINGWORK:
13 Provide bombastic paint and white wash for painting the internally and M2 224
externallv,
SUB TOTAL
I ELECTRICAL WORK:
14 Provide and supply the electrical materials and do the installation. Item I
SUB TOTAL
J PLUMBING WORK:
15 Provide and supply plumbing material and install ate them accordingly. item I
SUBTOTAL
K CEILING WORK:
16 Provide and fix Ceiling board M2 255
SUBTOTAL
SUMMARY
SINO DESCRIPTION T/AMOUNT
A. DEMOLITION
B. CONSTRUCTION WORK
C. WALLING WORK:
D. ROOFING WORK:
E. DOORS AND WTNDOWS WORK:
F. PLASTERING WORK:
G TILES WORK:
H. PAINTING WORK:
I. ELETRlCAL WORK:
J PLUMBING WORK:
K CEILING WORK:
TOTAL AMOUNT