Railway Electrification and Double-double Tracking of Java Main Line Project 1 Package B1

SUMMARY WEEKLY ACTIVITY REPORT OF LOCAL ENGINEER

PERIOD September 14, 2015 to September 18, 2015

WEEKLY ACTIVITY REPORT

NO. NAME ASSIGNMENT Monday Tuesday Wednesday Thursday Friday


9/14/2015 9/15/2015 9/16/2015 9/17/2015 9/18/2015

4 Sukirno Chief Track Inspector '* Excavation for Concrete '* Excavation for Concrete * Collect Salvaged Old PC * Collect Salvaged Old PC * Preparation for Bridge
pipe at LC 98 pipe at LC 98 (DT) Sleeper from Km. 36+100 to Sleeper from Km. 36+100 to Sleeper Replacement at BH-
* Track Shifting * Km. 36+200 , 40 pcs Km. 36+200 , 40 pcs 117
(Manual) at Km. 28+000 to Preparation for Bridge * Emergency Work at * Excavation at LC 98 '* Tamping at LC
Km. 28+170 (UT) Sleeper Replacement at BH- LC 91 91
177

Track Manager Jakarta, Date Sept. 18, 2015

Mr. Nakajima R. Sukirno


Progress Mei Kontraktor

9.4737
3.1925
0.92352
4.732938
8.65074
7.3227
0.545013
5.508776
2.593775

42.94366