Automatic Irrigation System Calculation

Irrigation Water Demand Requirement

Plant Description Area / Quantity Watering Rate LPD


Shrubs 431.47 m2 16 liters/ day/m2 6903.52
Turf or Grass 1872 m2 12 liters/ day/m2 22464
Ground Cover 1160 m 2
12 liters/ day/m2 13920
Trees 115 No. 120 liters/ day/m2 13800
Palms 8 No. 150 liters/ day/m2 1200
Total Watering Rate 58287.52
Adding 2% as Factor Of Safety 59453.27

From Perivious Data Get


Storage tank for 1 day = 59.5 m3
Storage tank for 2 days = 119 m3
Jacuzzi Calculation Sheet

The design of Jacuzzi is same as the design of swimming pool but with small change
in it there is Air Blower, Domestic Booster Pump , Skimmer, Jet Nozzle

Surface Area of Jacuzzi = 11 m2


Jacuzzi Average Depth = 0.9 m
Got Jacuzzi Volume = 9.9 m3

1- Calculation for Drain outlet, Skimmer, Wall inlets, Pipes , Filter,


& Filtration or Circulation pumps

Turn Over Period = 0.3 Time / Day


Jacuzzi Filtration Pump Capacity = Pool Volume / ( Turn Over Period * 60 )
= 0.55 m3/min

No. Of pump will used = 1 Pump


No. Of standby pumps = 1 Pump

Get pump flow rate = 0.55 m3/min

According to Egyptian code for Swimming Pool 1 Skimmer for each 46.5 m2 from
Surface Water for Swimming Pool
Got No. of Skimmer = 1 Unit

Assuming 50% of water suck from skimmer & 50% will suck from floor drains outlet
Got Flow Rate will discharge in pipes = 0.275 m3/min

Suction pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate = 16.5 m3/hr
No. Of outlet = 2 Outlet
Each outlet give flow rate = 8.25 m3/hr

Dia 1 = 48.82878 Taking it = 50 mm.


Dia 2 = 69.05433 Taking it = 65 mm.
Dia 3 = 84.57393 Taking it = 75 mm.
Dia 4 = 97.65756 Taking it = 100 mm.

NOTE :-
No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2
Supply pipe maximum velocity will be 2 m/s
Pump flow rate = 16.5 m3/hr
No. Of inlets = 1 Inlets
Each Inlet give flow rate = 16.5 m3/hr

Dia 1 = 54 Taking it = 50 mm.


Dia 2 = 76.4 Taking it = 75 mm.
Dia 3 = 93.6 Taking it = 100 mm.
Dia 4 = 108 Taking it = 100 mm.
Dia 5 = 120.8 Taking it = 100 mm.
Dia 6 = 132.3 Taking it = 150 mm.

NOTE :-
No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Getting the filter area to be used


Pump flow rate = 33 m3/hr
Filter area = 0.9 m2 at 15 Gpm / ft2
Assume we have to use a filter with diameter = 50 cm
No. of filter required = 2 Filter

Heating Calculation for Swimming Pools

Heater is required for heating purposes at winter seasons if required take inconsideration that
it's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:-
The recommended Pool water temperature is around 28 º C deg.
Outdoor air condition : 46 / 30 deg º C DB/WB –summer condition, max 122deg F (50 C)
: 6/ 10 deg º C BD/WB -winter condition
From SPATA p5, Sec3, the Average Daily heat loss (DH) in KWhr / m2 of pool surface area

Correction Value Will be Changed According to type of Swimming Pool And it`s Location

Jacuzzi Type and Location High Water Table


correction value to be used in = 1.25
Hours per day available for heating 24 hours
No. of hours per day available for heating = 24 hours

= Heater required Pool Volume * 1000 * ( Tc2 - Tc1) / ( 860 * Available Heating Hour)
= 9.9 * 1000 * ( 28 - 10 ) / 860 * 24
= 10.8 Kw

Cooling Calculation for Swimming Pools

For cooling purpose in summer seasons chilled water is required to cooling the water
temperature in summer to recommended temperatures
The recommended Pool water temperature is around 28 deg º C
Outdoor air condition : 46 / 30 deg º C DB/ WB - summer condition , Max 122 deg º F
: 10 / 06 deg º C DB/ WB - winter condition
During summer time the outdoor air temperature will be around 45 deg º C and hence the
water temperature will be the same
So to estimate the cooling load required for the chiller to reduce water temperature to
28 deg º C will be two part as following

hours per day available for cooling 72 hours


No. of hours per day available = 72 hours

The first part is the cooling load required to reduce the water temperature
to 28 deg º C as following

Q1 = V * Cp * P * (d T ) / Time Required for cooling


where :-
V= volume of pool
Cp = specific heat of water 4.18 (KJ/Kg.C)
P = specific heat of water = 1 Kg/L
d T = temperature difference

Q1 =9.9 * 4.186 * 1000 * ( 40 - 28 ) / ( 3600 * 72 )


= 1.9 Kw
The second part is the cooling load required to over come the heat lose from the water
surfaces of swimming pool

Q2 = CF *DH * Pool surface area / Time Required for cooling


where :-
CF= Correction Factor
DH = average daily loss from swimming pool surface

from SPATA tables there is no information about heat loss from pool areas the gulf area
condition the available data only at 15deg º C out door temp which is = 3.48 KWhr/m 2
Assuming linearity condition the excepted heat loss at 45deg º C =
(45/15) x 3.48 = 10.44 KWhr/m2

Q2 =1.25 * 11 * 10.44 / 72
= 2 Kw

So the Total Ciller Capacity will be = Q1 + Q2


= 1.9 + 2
= 3.9 Kw
= 13318.5 Btu/hr
= 1.1 TR

Pump head calculation for swimming pools


Heater pressure drop = 10 ft
Filter pressure drop = 5 ft
Chlorination auto pilot unit = 2 ft
Pipes and fittings losses = 7 ft
Static head heat pump = 5 ft
Pump head = 34.8 ft
Pump HP = 2.6 HP
2- Calculation for Air Blower, Jet Nozzle, Air Nozzle , Pipes , & Booster Pump,

Assuming Booster pump Capacity equal to 80% from Filtration pump Capacity
Filtration Pump Capacity = 0.55 m3/min

No. Of pump will used = 1 Pump


no. Of standby pumps = 1 Pump

Booster Pump Capacity = 0.44 m3/min

Suction pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate = 26.4 m3/hr
No. Of outlet Floor Drains = 3 Outlet
Each outlet give flow rate = 8.8 m3/hr

Dia 1 = 50.43015 Taking it = 50 mm.


Dia 2 = 71.319 Taking it = 75 mm.
Dia 3 = 87.34758 Taking it = 75 mm.
Dia 4 = 100.8603 Taking it = 100 mm.

NOTE :-
No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Jet pipe maximum velocity will be 2 m/s


Pump flow rate = 26.4 m3/hr
No. Of Jet Fitting = 12 Inlets
Each Jet give flow rate = 2.2 m3/hr

Dia 1 = 19.7 Taking it = 40 mm.


Dia 2 = 27.9 Taking it = 40 mm.
Dia 3 = 34.2 Taking it = 40 mm.
Dia 4 = 39.5 Taking it = 40 mm.
Dia 5 = 44.1 Taking it = 40 mm.
Dia 6 = 48.3 Taking it = 50 mm.
Dia 7 = 52.2 Taking it = 50 mm.
Dia 8 = 55.8 Taking it = 50 mm.
Dia 9 = 59.2 Taking it = 65 mm.
Dia 10 = 62.4 Taking it = 65 mm.
Dia 11 = 65.4 Taking it = 65 mm.
Dia 12 = 68.3 Taking it = 65 mm.
Dia 13 = 71.1 Taking it = 75 mm.
Dia 14 = 73.8 Taking it = 75 mm.
Dia 15 = 76.4 Taking it = 75 mm.
Dia 16 = 78.9 Taking it = 75 mm.

NOTE :-
No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Booster Pump head calculation


Pipes and fittings losses = 7 ft
Static head heat pump = 5 ft
Pump head = 15.6 ft
Pump HP = 0.9 HP
Air Blower & Air Jet Nozzle Calculation

No. of get nozzels fixed in Ground = 6 Air Nozzel


Assuming each Jet nozzel give flow equal to = 0.3 m3/min

No. Of duty air blower = 1 Blower


No. Of standby air blower = 1 Blower

Get Air Blower Capacity = 1.8 m3/min

Air nozzel pipe sizing

Dia 1 = 10.6 = 1/2 Inch


Dia 2 = 21.2 = 3/4 Inch
Dia 3 = 31.8 = 1 1/4 Inch
Dia 4 = 42.4 = 1 1/4 Inch
Dia 5 = 53 = 1 1/4 Inch
Dia 6 = 63.6 = 1 1/4 Inch
Dia 7 = 74.2 = 1 1/4 Inch
Dia 8 = 84.8 = 1 1/4 Inch
Dia 9 = 95.3 = 1 1/4 Inch
Dia 10 = 105.9 = 1 1/2 Inch

NOTE :-
No. of pipe will be taken according to No. of jet nozzel for 2 nozzel in series take to Dia 2

Swimming Pool Lighting :


For lighting we need about 5.4 watt to 16.30 watt for each 1m2
Take the watt required for each 1m2 = 10 Watt
Total watt required = 110 Watt
for lamp have capacity of = 50 Watt
No. of lamp required = 2 Lamp

Jaccuzi Pump Room Equipemet

Filteration Pump 145 GPM & 15 PSI & 2.6 HP


No. of Pumps 1 Duty & 1 Standby
No. of Skimmers 1 Skimmer with minimum flow rate 73 GPM
No. Of Filter 2 Filter with Diameter 50 cm
Heater Capacity 10.8 Kw
Cooling Capacity 1.1 TR
Booster Pump 116 GPM & 7 PSI & 0.9 HP
No. of Pumps 1 Duty & 1 Standby
Air Blower 64 CFM
No. of Blower 1 Duty & 1 Standby
Lighting 2 Lamp, Each one 50 Watt