PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.

CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: PUMP & CHILLER LOCATION : PUMP ROOM & RISER
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
LOCATION /
SN UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
FLOOR NO.
(GPM) ( GPM)
CHILLED WATER PUMP
1 ROOF CH.W PUMP-1 125 375.00 377 101% F/O
2 ROOF CH.W PUMP-2 125 375.00 376.00 100% F/O
3 ROOF CH.W PUMP-3 125 375.00 375 100% F/O
CHILLER
1 ROOF CHILLER-1 100 250.00 251 100% F/O
2 ROOF CHILLER-2 100 250.00 248 99% F/O
3 ROOF CHILLER-3 100 250.00 250 100% F/O
4 ROOF CHILLER-4 100 250.00 253 101% F/O
5 ROOF FAHU 100 20.00 21 105% 3.0
ROOF FCU
1 TELE ROOM RF-FCU-1 20 3.00 3.1 103% 2.5
2 AC PANEL ROOM RF-FCU-2 15 3.00 3.05 102% 2.0
3 LIFT MACHINE R RF-FCU-3 15 6.00 5.88 98% 2.0
4 PUMP ROOM RF-FCU-4 15 6.00 5.94 99% 2.3
5 ETS ROOM RF-FCU-5 20 3.00 3.02 101% 3.0

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN
PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: FCU LOCATION : FOURTH FLOOR
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
SN LOCATION / FLOOR NO. UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
(GPM) ( GPM)
1 LIFT LOBBY 4FCU-11 15 1.35 1.33 99% 3.0
2 ENGINEER OFFICE 4FCU-1 20 4.50 4.41 98% 2.0
3 POLICE COORDINATOR 4FCU-27 15 2.25 2.26 100% 3.5
4 TECHNICAL ASST 4FCU-2 20 4.50 4.41 98% 3.0
5 CONFERENCE ROOM 4FCU-3 20 4.50 4.45 99% 3.5
6 PLANING ENGINEER 4FCU-4 15 4.50 4.51 100% 2.0
7 SENIOR ENGINEER 4FCU-5 20 5.63 5.61 100% 2.5
8 TECHNICAL EXPERT 4FCU-6 20 5.63 5.6 100% 2.5
9 STORE ROOM 4FCU-7 15 2.25 2.24 100% 3.5
10 PRINTER COPIES 4FCU-8 15 11.25 11.2 100% 2.0
11 COLLAB. SPACE 4FCU-9 20 3.38 3.35 99% 2.5
12 SECTION HEAD 4FCU-10 20 11.25 11.2 100% 2.5
13 TECHNICAL CLERK 4FCU-26 20 11.25 11.15 99% 3.5
14 CHANGING ROOM 4FCU-25 15 5.63 5.6 100% 2.0
15 KITCHEN 4FCU-12 15 2.25 2.23 99% 2.5
16 Q.R.HEAD 4FCU-23 20 4.50 4.41 98% 2.5
17 SECTION HEAD 4FCU-22 20 4.50 4.45 99% 3.5
18 SECTION HEAD 4FCU-21 20 5.63 5.6 100% 2.5
19 OPEN OFFICE 4FCU-20 20 5.63 5.61 100% 3.5
20 OPEN OFFICE 4FCU-19 20 4.50 4.42 98% 2.0
21 OPEN OFFICE 4FCU-28 15 6.75 6.78 100% 2.5
22 OPEN OFFICE 4FCU-18 20 6.75 6.77 100% 2.5
23 OPEN OFFICE 4FCU-17 20 4.50 4.45 99% 3.5
24 CONFERANC ROOM 4FCU-16 20 4.50 4.43 98% 3.5
25 OPEN OFFICE 4FCU-15 20 4.50 4.44 99% 2.0
26 OPEN OFFICE 4FCU-14 20 4.50 4.51 100% 2.5
27 MEETING LOUNGE 4FCU-13 20 4.50 4.49 100%

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN
PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: FCU LOCATION : THIRD FLOOR
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
SN LOCATION / FLOOR NO. UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
(GPM) ( GPM)
1 LIFT LOBBY 3FCU-24 15 9.00 8.99 100% 2.5
2 RECEPTION LOBBY 3FCU-4 15 9.30 9.20 99% 3.5
3 CONFERENCE ROOM 3FCU-7 20 4.50 4.40 98% 2.0
4 SAMPLERS 3FCU-8 20 4.50 4.42 98% 2.5
5 ENGINEER OFFICE 3FCU-9 20 7.85 7.80 99% 2.5
6 SECTION HEAD 3FCU-10 20 5.63 5.55 99% 3.5
7 FILLING ROOM 3FCU-11 15 2.25 2.24 100% 2.5
8 TECHNICAL CLERK 3FCU-6 15 9.00 8.70 97% 3.5
9 ENGINEER OFFICE 3FCU-5 20 4.50 4.50 100% 2.0
10 SECTION HEAD 3FCU-3 20 3.94 3.90 99% 2.5
11 DEPT.MANAGER 3FCU-2 20 8.44 8.40 100% 2.5
12 DEPT.MANAGER 3FCU-1 20 6.75 6.77 100% 3.5
13 CHANGING ROOM 3FCU-23 15 2.25 2.22 99% 3.5
14 FILLING ROOM 3FCU-13 15 2.25 2.23 99% 2.0
15 SECTION HEAD 3FCU-14 20 4.50 4.41 98% 2.5
16 UNIT HEAD 3FCU-15 20 9.56 9.50 99% 3.0
17 UNIT HEAD 3FCU-16 20 11.25 11.20 100% 2.0
18 TECHNICAL CLERK 3FCU-17 15 13.50 13.42 99% 3.5
19 ASST.ENGINEER 3FCU-18 20 4.50 4.40 98% 3.0
20 CONFERANC ROOM 3FCU-19 20 4.50 4.48 100% 3.5
21 SENIOR ENGINEER 3FCU-20 20 4.50 4.43 98% 2.0
22 UNIT HEAD 3FCU-21 20 6.75 6.71 99% 3.0
23 UNIT HEAD 3FCU-22 20 7.88 7.82 99% 2.0
24 RECEPTION 3FCU-12 15 9.28 9.20 99% 3.5

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN
PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: FCU LOCATION : SECOND FLOOR
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
SN LOCATION / FLOOR NO. UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
(GPM) ( GPM)
1 LIFT LOBBY 2FCU-14 15 3.38 3.35 99% 3.5
2 CHANGING ROOM 2FCU-26 20 4.50 4.51 100% 2.0
3 OPEN OFFICE 2FCU-15 15 4.50 4.45 99% 2.5
4 COLLAB. SPACE 2FCU-17 20 10.13 10.1 100% 2.5
5 SECTION HEAD 2FCU-16 20 4.50 4.4 98% 3.5
6 PRINTER EREA 2FCU-24 15 2.25 2.26 100% 2.5
7 MEETING LOUNGE 2FCU-23 15 2.25 2.24 100% 3.5
8 SUPERVISOR OFFICE 2FCU-22 15 2.25 2.27 101% 2.0
9 TECHNICAL CLERK 2FCU-21 20 7.88 7.84 100% 2.5
10 SENIOR ENGINEER 2FCU-25 20 6.75 6.8 101% 2.5
11 ENGINEER AREA 2FCU-20 15 4.50 4.51 100% 3.5
12 DEPT.MANAGER 2FCU-19 20 10.13 10.31 102% 3.5
13 HV.DEPT.MANAGER 2FCU-18 20 2.81 2.8 100% 2.0
14 KITCHEN 2FCU-11 15 2.25 2.3 102% 2.5
15 SECTION HEAD 2FCU-10 20 4.50 4.6 102% 3.5
16 SECTION HEAD 2FCU-9 20 4.50 4.41 98% 2.0
17 SECTION HEAD 2FCU-8 20 4.50 4.5 100% 2.5
18 TECHNICAL CLERK 2FCU-7 20 5.63 5.55 99% 2.5
19 ASST.ENGINEER 2FCU-6 20 4.50 4.55 101% 3.5
20 MAINT ROOM 2FCU-10 15 5.63 5.6 100% 3.5
21 ENGINEER OFFICE 2FCU-5 20 4.50 4.57 102% 2.0
22 ASST.ENGINEER 2FCU-4 20 4.50 4.58 102% 2.5
23 CONFERANC ROOM 2FCU-3 20 4.50 4.51 100% 2.5
24 RECEPTION LOBBY 2FCU-12 15 9.84 9.81 100% 3.5
25 ENGINEER OFFICE 2FCU-2 20 4.50 4.46 99% 3.0
26 SENIOR ENGINEER 2FCU-1 20 6.75 6.7 99% 2.5
27 PROTECTION SECTION 2FCU-13 20 6.75 6.71 99% 3.0

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN
PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: FCU LOCATION : FIRST FLOOR
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
SN LOCATION / FLOOR NO. UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
(GPM) ( GPM)
1 LIFT LOBBY 1FCU-12 20 3.38 3.4 101% 3.5
2 SERVER ROOM 1FCU-27 15 2.53 2.55 101% 2.5
3 STORE ROOM 1FCU-10 15 7.88 7.85 100% 3.5
4 RECEPTION AREA 1FCU-4 20 7.88 7.84 100% 3.0
5 WOMEN LOUNGE 1FCU-11 20 5.63 5.6 100% 2.5
6 STOREG ROOM 1FCU-9 15 2.25 2.26 100% 2.5
7 TRANING ROOM 20 1FCU-3 20 11.25 11.2 100% 3.5
8 SERVER CONTER 1FCU-8 20 5.06 5.1 101% 3.0
9 LOUNGE 1FCU-2 20 3.38 3.4 101% 3.5
10 CAFETERIA 1FCU-7 20 3.38 3.41 101% 2.5
11 CAFETERIA 1FCU-1 20 3.38 3.35 99% 3.5
12 CAFETERIA 1FCU-6 20 6.75 6.77 100% 3.0
13 CAFETERIA 1FCU-5 20 6.75 6.75 100% 2.5
14 STORE ROOM 1FCU-13 15 3.38 3.35 99% 2.5
15 PUBLIC LIGHT SECTION 1FCU-22 20 4.50 4.51 100% 3.5
16 ABLUTION AREA 1FCU-23 15 3.38 3.4 101% 3.0
17 MALE PRAYER AREA 1FCU-24 15 5.63 5.7 101% 3.5
18 RECEPTION GYM 1FCU-25 20 5.06 5.1 101% 2.5
19 RECEPTION GYM 1FCU-26 20 8.44 8.4 100% 3.5
20 CHANGING ROOM 1FCU-14 15 6.75 6.74 100% 3.0
21 LOCKER ROOM 1FCU-15 20 3.38 3.3 98% 2.5
22 KITCHEN 1FCU-16 20 3.38 3.4 101% 2.5
23 OPS & CORRECTIVE 1FCU-17 20 7.60 7.61 100% 3.5
24 OPS & CORRECTIVE 1FCU-18 20 4.50 4.48 100% 3.0
25 MAINT SCTION 1FCU-19 20 4.50 4.51 100% 3.0
26 SERVECE SECTIN 1FCU-20 20 4.50 4.52 100% 3.5
27 PROTECTION SECTION 1FCU-21 15 13.50 13.6 101% 3.0

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN
PROJECT NAME : PROOPOSED INTERIOR CONTROL ROOM.CRIME INVESTIGATION DEPARTMENT

WATER BALANCING TEST REPORT


UNIT DESIGNATION: FCU LOCATION : GROUND FLOOR
INSTRUMENT REF: HYDRONIC MAMOMETER DATE : 05/07/2021
MODEL : TSI / HM658M SERIAL NO : 71725060
CALIBRATION DATE: 15/02/2021 CALIBRATION DUE: 14/02/2022

DESIGN ACTUAL
SN LOCATION / FLOOR NO. UNIT REF. SIZE (MM) WATER FLOW WATER FLOW % DRV SETTING
(GPM) ( GPM)
1 LIFT LOBBY GFCU-7 15 4.5 4.4 98% F/O
2 E-GATE ENTRANCE GFCU-9 20 10.125 10.12 100% F/O
3 ENTRANCE GFCU-8 20 10.125 10.1 100% 3.5
4 BMS ROOM GFCU-5 15 10.125 10.11 100% 3.0
5 CUSTOMER SECTION GFCU-10 20 11.25 11 98% F/O
6 CUSTOMER SECTION GFCU-11 15 11.25 11.1 99% 3.5
7 PUMP ROOM GFCU-12 15 3.375 3.35 99% 3.5
8 CORRIDOR GFCU-13 20 10.125 10 99% 3.0
9 REPAIR SECTION GFCU-3 20 6.75 6.69 99% 3.0
10 STORE ROOM GFCU-2 20 4.5 4.45 99% 3.5
11 UPS ROOM GFCU-4 20 4.5 4.41 98% F/O
12 PRIMARY SECTION GFCU-1 15 13.5 13.45 100% 3.0
13 LOKER ROOM GFCU-6 20 6.75 6.71 99% F/O
14 EQUIPMENT STORE GFCU-5 15 13.5 13.5 100%

THIRD PARTY MEP CONTRACTOR MAIN CONTRACTOR CONSULTANT


NAME : ALGHAZAL
DATE : 05/07/2021
SIGN