Presentation Outline
SHIDEP Project Overview SHIDEP Project Goal
▪ Revised for seven years =4.43Billion Birr ▪ Irrigation Coverage (ha) = 13,342.84 ha to
27,057.54 ha
▪ Project Code = 211/03/01/01/009/
▪ Lead Agency = Ministry of Agriculture (MoA) ▪ HH Beneficiaries >= 50,000 HHs of SHF & Agro-
pastoralists with 160,000 of total outreached
▪ Implementer = Smallholder Irrigation Development
community.
Lead Executive office supported by
Implementation Support Team ▪ Location/ Target Regions =All Regional
▪ Project Granted: Negotiation with MoF /MoA by Administrations
HE Umer Hussein/ since June 2012 EFY ▪ Project Duration = Seven Years /2012 EFY to 2018 EFY/
12 12.0%
10 10.0%
8 8.0%
6 6.0%
4 4.0%
2 2.0%
0 0.0%
SHIDEP EFSRP PACT PASDIP SLMP PSNP DRDIP
Contribution ha(^000) 8.63 11.5 5.66 3.18 0.14 10.6 3.46
Contribution (%) 9.1% 12.1% 6.0% 3.4% 0.1% 11.2% 3.6%
❷ SHIDEP Project Achievement UpToDate
Identification, Study and A total of 13,340.20 hectares of potential 196 SSI
design of SSI scheme schemes were identified, studied, and designed.
Identify problems to 100 SSI Salinity and IWM Problem affected area mapping and
Create sustainable identification/>40% SSI are affected by salinization & water logging/ and
management modalities also on progress to Establish National standard SSI performance
102 Schemes were completed to irrigate 6,997.2 ha and Benefit 16,859
SSI Schemes Upgrading HHs and also additionally 11,894.83 ha of land accessed by Water pumping
and Development technologies/Diesel + Solar pump/
Project component Unit 2016 EFY Physical plan Financial Plan /MBirr/
Total 600
2016 EFY 3rd quarter Financial and Physical Plan and Achievement
Oromia
110,820.72 15,491.20 866,990.17 1,865,682.00 Well drilling @ Tulu Bollo
❹ Project Alignment to National plan (2016 to 2018)
በጀት ዓመት
ቁልፍ የውጤት አመለካቾች/ ንዑስ 2016 2017 2018 2016 2017 2018
ፕሮግራም መለኪያ ፊዚካል ዕቅድ ፋይናንሻል ዕቅድ
የአነስተኛ ይዞታ መሥኖ ልማት
1. ያደገ የመስኖ ሽፋንና አጠቃቀም
1.1. ለመስኖ ልማት ዝግጁ የሆነ የመሬት ስፋት በሺህ ሄ/ር 1.7 3.3 3.1 419 513.0 485.0
1.2. የመስኖ ውሃ ተጠቃሚ አርሶ/ከፊል አርብቶ አደር ብዛት በሺህ ቁጥር 23.2 38.0 13.5 0.0 0.0 0.0
2. የተስፋፋ የመስኖ መሰረተ ልማት
2.1. በማህበረስብ የሚተዳደሩ አዳዲስ የመስኖ አውታሮች
ግንባታ ብዛት በቁጥር
24.0 60 34 0.0 0.0 0.0
2.2. በቤተሰብ የሚተዳደሩ አዳዲስ የመስኖ አውታሮች ግንባታ
ብዛት በሺህ ቁጥር
0.10 0.20 0.30 56.52 343.10 234.80
3. የተሻሻለ የመስኖ አውታር አስተዳደርና ውሀ አጠቃቀም
3.1. በማህበረሰብ የሚተዳደሩ ነባር የመስኖ አውታሮች መልሶ
ማቋቋምና ማሻሻያ የተደረገላቸው በቁጥር
5.0 6.0 12.0 18.0 21.6 25.2
3.2. የአቅም ግንባታ የተሰጣቸው የመስኖ ውሃ ተጠቃሚ
ማህበራት ብዛት በቁጥር
24.0 30.0 36.0 24.4 29.3 25.9
3.3. ፕሮጅክት የመፈፀም አቅምን ማሳደግ / ፕሮጀክት
ማኔጅመንት
በጥቅል 1.0 1.0 1.0 82.02 100.4 52.0
Cont…Nine Month
Training:
▪ 35 (three females) Solar Pump Basic + Operation
▪ Software training for 16 regional experts
▪ Feasibility study and design on selected disciplines for 31 (2 Female) experts
▪ Contract Administration, Construction Supervision, and Technical specification for
18 (3 female) Experts
▪ Irrigation Water Management
▪ 120 (110 male + 10 female) Oromia Region
▪ 32 (3 females +29 males) other regions
Cont…Nine Months Progress
Plan to Procurement
• Deferential GPS
• Reel hose Technology
• Pumps
Amhara More 12 projects are all most all projects are not ongoing this time
Key Challenges
• Security Challenges
• Pumps supply challenges (3 projects Oromia Projects)
• Low performance of Construction SMEs due to delayed
construction
• Market Price
• Project variation due to Design changes
• Lack of Social infrastructure
• Rightoff problems (Gerana Project)
Cont.…The Way Forwards
Insisted to Apply for Performance Base Project
Implementation via discussion with decision
makers /higher officials/