No.

Description Qty Unit Periode Cost/Unit Total


A. Preparation
1 Rental Car 1 Unit 17 Days
2 Geologist Meals 2 Pax 15 Days
3 Driver Meals 1 Pax 17 Days
4 Helper Meals 4 Pax 15 Days
5 Lodging 1 Unit 1 Month
Subtotal
B. Personnel
1 Exploration Manager 1 Pax 15 Days
2 Wellsite Geologist 2 Pax 15 Days
3 Driver 1 Pax 17 Days
4 Field Helper 4 Pax 15 Days
5 Wakar 4 Pax 15 Days
Subtotal

C. Eksplorasi Pemboran Detail 750 Mtr


1 Pemetaan Geologi Permukaan 50 Ha 1 Day
2 Vertical Drilling 700 Mtr
2.1 Open Hole 630 Mtr 14 Days
2.2 Coring 70 Mtr 14 Days
3 Inclining Drilling 50 Mtr
3.1 Open Hole 45 Mtr 1 Day
3.2 Coring 5 Mtr 1 Day
4 Mob-demob Rigs and Crew 2 Rig 1 Ls
Subtotal

D 1 Processing Data and Reports 1 File 1 Week

E. Miscellaneous 1 Ls 1 Ls
1 Coal Sampling
2 Geoservices Lab Analysis
3 Airline Tickets Round Trip
4 Accommodations
5 Etc.

F. Contingency Cost 1 Ls 1 Ls
1 Village Heads
2 Donations to Local Communities
3 Kelebihan volume dan waktu pekerjaan Grand Total
4 Etc.
Remarks

Incl. Fuel and maintenance

Rental House , 3 bedrooms

Total Kedalaman 750 meter


Penentuan Titik Bor
Total Kedalaman 700 meter

Total Kedalaman 50 meter

Hard copy and soft copy