Site Preparation - Floor Electrical

IK 10*10 cm IK 10*10 cm
UPS P.D.B P.D.B
AFFL140 cm. FK 20*10cm
AFFL140 cm.

Equipment Room
25
260
Legend electrical installation
1 To external conductive parts
RCD Residual Current Device 40 A / 30 mA Typ B
3b
Siemens FI 5SM3 3444
RCD Residual Current Device 63 A /30 mA Typ B
260 3c

100
Siemens FI 5SM3 3464 H WS SP AS (49 54 470 Y7333)

180
25 4 Fuses, according to local and national regulations in your country

20
Contactor/power relay: according to the electrical data and to local and national
PVC 4" 5
regulations in your country
Pipe
6 24- VDC power supply for the SIRIUS relay 6EP1333-3BA10 *)

20
7 Sirius Safety Relay 3TK2826 1CW30 *)

Examination Room 8 Control relay 3RT1017-1BB44-3MA0 *)

27 Main switch

RD Connection box for REPO cable + 3 m flexible cable on-site required for REPO

20
PVC 4"
Pipe 180 cm AT Emergency off button with locking mechanism
AFFL
AT
On-off button with pilot lamp
20

175
39 Generator (Power Unit 1)

130
System Control Cabinet

A additional PE cable 16mm² for the SC1

PA equipotential bus bar


AFFL
180 cm [ ] Free lead ends in m
30 52 25 25 25 25 25 25 X-Ray warning lamp
FK 20*10cm Cables routed to system cabinet The 3 following safety devices can be ordered by Siemens H WS SP AS Erlangen
*)
Passing through P.D.B SAP 10562798 or purchased locally
Control Room
Do not connect external components to the MR power supply line.
Energy cables which do not belong to the system must be separated prior to fitting
the unit cables (distance >100 cm), or they must also be metallically shielded. For
USA: PE is equivalent to Protective-GND and PA is equivalent to Transient-GND

Power requirements for POLYDOROS A100 Power requirements for system control cabinet
Power line: 3/N/PE AC, 50/60 Hz ± 1 Hz Connection value: 34,6 kVA Power line: 3/N/PE AC, 50/60 Hz ± 1 Hz

Line voltage: 400 V ± 10 % Power consumption: Line voltage: 400 V ± 10 %


Fluoroscopy 8 kVA
Line impedance: ≤ 135 mΩ Exposure 160 kVA Connection value: 24,2 kVA

Cable cross section is to be determined by calculation Power consumption: 8,5 kVA

Cable cross section is to be determined by calculation, max 70 mm² Cable cross section is to be determined by calculation, max 16 mm²

Do not connect external components to the power supply line.

Electrical Installation according to IEC 60364-7-710 or to NATIONAL GUIDELINES Sensis Connection Schematic

In Group 2 rooms, the Sensis must be


PE N L1L2L3 connected to the in-house backup
1 Plane power supply (IT power grid).
Proposal for Power Distributor Power supply for X-ray
contains minimum requirement Sensis

PE
27
3 2x2,5□
min. + PE
PA 16□Cu

16A/C

50A NH 63A NH
4A

3b 3c
4
L2/L3
L1 L1
L2 L3 PE A1+ 13 Y12 T1 Y33 T3 1
4 4
1 3 230 - 500 VAC 13
K1 K1 SIEMENS SIEMENS K1
2 4 SIRIUS DIP 14
Site preparations
switches
K3 K4 DEVICE 1 on
N 5 N 5 OUT 2 on Electrical scheme
IN 3 off
K3 K4 SF 4 on
6 5 on
7 6 on
7 on
8 off
Abdelrahman Gamal Kareem Zakaria Abdelrahman Gamal
- 4/8/2024 4/8/2024 4/8/2024
+ A2- Y22 T2 Y34 14
Edited Checked Released
21 21

K3 K4 K1 Siemens Healthcare GmbH


22 22
8 Planning department
Hartmannstrasse 16
5x16□ 5
D-91052 Erlangen
1

DELTA UNIVERSITY HOSPITAL


International Coastal Rd,
2x
Al Hafir WA Al Amal
by ELECTRICIAN
1.5□ RADIOLOGY

[0,6m] [0,7m]
GROUND FLOOR
0m 1m 2m
SIEMENS Multi Modality

Project File Revision Page Size Scale


112332 1705135 01 04 of 04 A1 1:50