Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

EQUIPMENT MAINTENANCE SCHEDULE

EQUIPMENT TYPE Gas Range

EQUIPMENT CODE BPP-EQPT-001

LOCATION Practical work area

Schedule for the Month of MAY 2024

ACTIVITIE MANPOWER

Remarks
Monthly
15th Day
S

Weekly
Other
Every

Every
Daily

1. Clean the Trainee Activity is


stove done
top and before and
control
✓ after
knobs
using the
equipmen
t

2. Clean Trainee/
Burner Trainer Activity is
grates done after
and
✓ using the
burner
ports(us equipmen
e a wire t
brush)

3. Post each Trainee


clean(lig
htly
coat Activity is
grates done after
with ✓ using the
vegetabl equipmen
e oil to t
help
prevent
rust

4. Check Trainer ✓ Activity is


Gas done
hose before
and using the
regulato equipmen
r t

5. Check if Trainer Activity is


a Gasul done
LPG before
cylinder ✓
using the
still has
content equipmen
t
PERFORMANCE CRITERIA CHECKLIST 5.1-3b

CRITERIA YES NO

Did the trainee prepare the needed tools and ✓


equipment for the task?

Did the trainee identify and choose the ✓


equipment from among the list/inventory in
his area/Qualification?

Was the Manufacturer’s Manual used as basis ✓


in the schedule and maintenance activities of
the equipment?

Were the costs of housekeeping materials (i.e. ✓


cleaning agents, handy vacuum, etc.)
considered in the maintenance

Was safety and frequency of used considered ✓


in the equipment maintenance schedule?

Was the person assigned as indicated in the ✓


schedule capable or authorized to perform the
maintenance

Are the maintenance activities in ✓


accordance with the
organizational/school
policy/regulations?

Was the task sheet accomplished/done ✓


within the required time limit?

You might also like