Professional Documents
Culture Documents
Baccha Dispensary (Autosaved)
Baccha Dispensary (Autosaved)
19.55% = 62791
= 383972
4 9.92% = 2271
5 = 25165
= 409137
7 Minus Premium on
8 20.00% = 0
9 Total Cost OF Marble/ Paver / Tile = 0
10 Non Schedule Item = 0
6 Cost of Saintary without PIPES = 65539
7 Add Premium on 1
8 5.00% = 3277
9 Total Cost of Sanitary without pipes = 68816
11 15.00% = 4278
12 Total Cost of Pipes = 32798
13 Carriage = 167481
MILLION = 0.82
SUB ENGINEER BUILDINGS ASSISTANT ENGINEER BUILDINGS
SUB DIVISION KOTRI DISTRICT JAMSHORO SUB DIVISION KOTRI DISTRICT JAMSHORO
NAME OF WORK : CONSTRUCTION OF DISPENSARY @ VILLAGE BACCHA
UC AMRI TALUKA MANJHAND DISTRICT JAMSHORO.
1 CC 1:4:8 42 4 20 40
3 RCC 1:2:4 0 0 0 0
4 Fabrication 0 0.00
5 CC Block 0 0 0 0
7 Tile/Marble 0 0 0 0
12 Topping 0 0 0 0
3 Fabrication of Miled Steel Reinforcement for Cement Concrete including cutting, bending,
laying in position, making joints and fastly including cost of binding wire (also includes \
removal of rust from bars
F1 0 x 4 x 7 x 3.50 x 1.042 = 0
F1 0 x 4 x 5 x 4.50 x 1.042 = 0
F2 0 x 8 x 8 x 4.50 x 1.042 = 0
F2 0 x 8 x 7 x 5.50 x 1.042 = 0
F3 1 x 2 x 10 x 5.50 x 1.042 = 115
F3 1 x 2 x 8 x 6.50 x 1.042 = 108
Deduction
F1 Horzontal 0.5 x 4 x 5.00 x 2.00 x 4.00 = 80
F1 Vertical 0.5 x 4 x 4.00 x 2.00 x 4.00 = 64
F3 Horzontal 0.5 x 4 x 6.00 x 2.00 x 4.00 = 96
F3 Vertical 0.5 x 4 x 5.00 x 2.00 x 4.00 = 80
F2 Horzontal 0.5 x 8 x 6.00 x 2.00 x 4.00 = 192
F2 Vertical 0.5 x 8 x 5.00 x 2.00 x 4.00 = 160
= 672
Deduction
F1 Horzontal 0.5 x 4 x 5.00 x 2.00 x 0.50 = 10
F1 Vertical 0.5 x 4 x 4.00 x 2.00 x 0.50 = 8
F3 Horzontal 0.5 x 4 x 6.00 x 2.00 x 0.50 = 12
F3 Vertical 0.5 x 4 x 5.00 x 2.00 x 0.50 = 10
F2 Horzontal 0.5 x 8 x 6.00 x 2.00 x 0.50 = 24
F2 Vertical 0.5 x 8 x 5.00 x 2.00 x 0.50 = 20
= 84
Net Quantuty 133 x 9416.28 = 12524
Deduction
F1 Horzontal 2 x 0.5 x 4 x 5.00 x 1.250 = 25
F1 Vertical 2 x 0.5 x 4 x 4.00 x 1.250 = 20
F3 Horzontal 2 x 0.5 x 4 x 6.00 x 1.250 = 30
F3 Vertical 2 x 0.5 x 4 x 5.00 x 1.250 = 25
F2 Horzontal 2 x 0.5 x 8 x 6.00 x 1.250 = 60
F2 Vertical 2 x 0.5 x 8 x 5.00 x 1.250 = 50
Pc 1 x 2 x 24 x 1.0 x 7.125 = 342
Pc 1 x 2 x 24 x 1.75 x 7.125 = 599
= 1151
Deduction
F1 Horzontal 0.5 x 4 x 5.00 x 1.00 x 1.250 = 13
F1 Vertical 0.5 x 4 x 4.00 x 1.00 x 1.250 = 10
F3 Horzontal 0.5 x 4 x 6.00 x 1.00 x 1.250 = 15
F3 Vertical 0.5 x 4 x 5.00 x 1.00 x 1.250 = 13
F2 Horzontal 0.5 x 8 x 6.00 x 1.00 x 1.250 = 30
F2 Vertical 0.5 x 8 x 5.00 x 1.00 x 1.250 = 25
Pc 1 x 24 x 1.0 x 1.75 x 7.125 = 299
= 404
6 Filling ,wateringand ramming earth under floor with new earth (excavated from outside)
lead upto one chain and lift upto 5ft .
item no 22 page 4 chapter 1 General schedule
Plinth Beam
OUT side walls
Horziontal
L.wall 1 x 1 x 45.00 x 1.0 x 2.0 = 90
L.wall 1 x 2 x 8.75 x 1.0 x 2.0 = 35
L.wall 1 x 2 x 10.75 x 1.0 x 2.0 = 43
L.wall 1 x 2 x 14.75 x 1.0 x 2.0 = 59
L.wall 1 x 1 x 11.50 x 1.0 x 2.0 = 23
Vertical
S.wall 1 x 2 x 10.00 x 1.0 x 2.0 = 40
1 x 2 x 18.00 x 1.0 x 2.0 = 72
1 x 2 x 4.00 x 1.0 x 2.0 = 16
1 x 2 x 5.25 x 1.0 x 2.0 = 21
Inside walls
L.wall 1 x 1 x 43.50 x 1.0 x 2.0 = 87
L.wall 1 x 1 x 61.00 x 1.0 x 2.0 = 122
S.wall 1 x 2 x 9.00 x 1.0 x 2.0 = 36
S.wall 1 x 4 x 12.00 x 1.0 x 2.0 = 96
S.wall 1 x 4 x 5.25 x 1.0 x 2.0 = 42
S.wall 1 x 2 x 10.00 x 1.0 x 2.0 = 40
Roof Beam
OUT side walls
Horziontal
L.wall 1 x 1 x 45.00 x 0.75 x 2.0 = 68
L.wall 1 x 2 x 8.75 x 0.75 x 2.0 = 26
L.wall 1 x 2 x 10.75 x 0.75 x 2.0 = 32
L.wall 1 x 2 x 14.75 x 0.75 x 2.0 = 44
L.wall 1 x 1 x 11.50 x 0.75 x 2.0 = 17
Vertical
S.wall 1 x 2 x 10.00 x 0.75 x 2.0 = 30
1 x 2 x 18.00 x 0.75 x 2.0 = 54
1 x 2 x 4.00 x 0.75 x 2.0 = 12
1 x 2 x 5.25 x 0.75 x 2.0 = 16
Inside walls
L.wall 1 x 1 x 43.50 x 0.75 x 2.0 = 65
L.wall 1 x 1 x 61.00 x 0.75 x 2.0 = 92
S.wall 1 x 2 x 9.00 x 0.75 x 2.0 = 27
S.wall 1 x 4 x 12.00 x 0.75 x 2.0 = 72
S.wall 1 x 4 x 5.25 x 0.75 x 2.0 = 32
S.wall 1 x 2 x 10.00 x 0.75 x 2.0 = 30
Stair Steps 0.5 x 28 x 4.00 x 1.00 x 0.5 = 28
Landing 1 x 2 x 10.00 x 4.00 x 0.5 = 40
Tower Beam L.wall 1 x 2 x 11.50 x 0.75 x 2.0 = 35
S.wall 1 x 2 x 16.00 x 0.75 x 2.0 = 48
Slab with chajja
1 x 1 x 48.00 x 12.25 x 0.5 = 294
1 x 1 x 65.50 x 13.50 x 0.5 = 442
1 x 1 x 65.50 x 12.25 x 0.5 = 401
1 x 1 x 14.50 x 7.50 x 0.5 = 54
Towe Slab 1 x 1 x 11.50 x 16.75 x 0.5 = 96
P.Cft 0 x 337.00 = 0
9 Fabrication of Miled Steel Reinforcement for Cement Concrete including cutting, bending,
laying in position, making joints and fastly including cost of binding wire (also includes \
removal of rust from bars
1 x 1 x 0 x 6.00 / 112.00 = 0
PCWT 0 x 5001.70 = 0
%Cft 0 x 12501.41 = 0
Horziontal
L.wall 1 x 1 x 45.00 x 0.75 x 10.0 = 338
L.wall 1 x 2 x 8.75 x 0.75 x 10.0 = 131
L.wall 1 x 2 x 10.75 x 0.75 x 10.0 = 161
L.wall 1 x 2 x 14.75 x 0.75 x 10.0 = 221
L.wall 1 x 1 x 11.50 x 0.75 x 10.0 = 86
Vertical
S.wall 1 x 2 x 10.00 x 0.75 x 10.0 = 150
1 x 2 x 18.00 x 0.75 x 10.0 = 270
1 x 2 x 4.00 x 0.75 x 10.0 = 60
1 x 2 x 5.25 x 0.75 x 10.0 = 79
Inside walls
L.wall 1 x 1 x 43.50 x 0.75 x 10.0 = 326
L.wall 1 x 1 x 61.00 x 0.75 x 10.0 = 458
S.wall 1 x 2 x 9.00 x 0.75 x 10.0 = 135
S.wall 1 x 4 x 12.00 x 0.75 x 10.0 = 360
S.wall 1 x 4 x 5.25 x 0.75 x 10.0 = 158
S.wall 1 x 2 x 10.00 x 0.75 x 10.0 = 150
Tower Beam L.wall 1 x 2 x 11.50 x 0.75 x 10.0 = 173
S.wall 1 x 2 x 16.00 x 0.75 x 10.0 = 240
= 3495
DEDUCTION
Door 1 x 10 x 3.50 x 0.75 x 7.00 = 184
Door ( Bath) 1 x 4 x 2.50 x 0.75 x 7.00 = 53
Window 1 x 18 x 4.00 x 0.75 x 5.00 = 270
Column 1 x 22 x 1.00 x 0.75 x 10.00 = 165
= 671
%Cft 0 x 13227.41 = 0
12 Providing and laying 1:3:6 cement concrete solid block masonary wall Above 6" in thickness
set in 1:6 cement sand mortar in ground floor super structure including raking
out joints and curring etc complete.
0 x 14621.44 = 0
13 Providing and fixing Galvanized iron frames/chowkats of size 7" x 2" or 4.5" x 3" for doors using 20 guage
G.I sheet including welded hinges and fixing at site with necessary hold fasts, filling with cement sand
slurry of ration 1:6 and repairing the jams. The cost also include all carriage, tools and plants used in making
and fixing (S.I.NO.29/C-17).
PCft 0 x 228.90 = 0
14 Providing and fixing Galvanized iron frames/chowkats of size 7" x 2" or 4.5" x 3" for windows using 20 guage
G.I sheet including welded hinges and fixing at site with necessary hold fasts, filling with cement sand
slurry of ration 1:6 and repairing the jams. The cost also include all carriage, tools and plants used in making
and fixing (S.I.NO.28/C-17).
PCft 0 x 240.50 = 0
15 First class deodar wood rought, joinry in doors and windows etc fixed in position including chowkats,
hold fasts, hinges, iron tower bolts, chowks, cleates, handles and cords with hookd etc. Deodar panelled
or panelled and glazed or fully glazed, (b) 1.75" thick (S.I.NO.7(b)/C-10).
P.Sft 0 x 902.93 = 0
16 Provinding and fixing iron/ steel grill using solid square bars of size 1/2" x 1/2" placed at 4" center to
center and frame of flat iron 3/4" x 1/4" including circle shape at 1-0 a part equivalent fitted with screws
or pins including painting 3 coats with first coat of red oxide paint etc (S.I.NO.30/C-17).
17 Provinding and fixing iron/ steel grill door with angle iron frame of 1-1/2" x1- 1/2"x1/4 inch
flat iron 3/4" x 1/4" with approved design and locking arrengment embeded in masonary
as per instruction of engineer incharge . Item 31 page 94
%P.Sft 0 x 231.60 = 0
%Sft 0 x 2206.60 = 0
%Sft 0 x 2197.52 = 0
20 Providing and laying topping cement concrete 1:2:4 including surface finishing and dividing into panels
© 2" thick (S.I.No.16©/C-8
%Sft 0 x 3275.50 = 0
21 Providing and laying tiles glazed 6" x 6" x 1/4'' on floor or wall facing requires pattern of
styles specification jointed in white cement and pigment over base of 1:2 gray cement mortar 3/4" thick
including washing and filling of joints with slurry of white cement and pigment in desired shape with finishing
cleaning and cost of wax polish etc complete including cutting tiles the proper profile (S.I.No.61/C-8)
%Sft 0 x 30509.77 = 0
22 Laying white marble flooring fine dressesd on the surface winding set 1:2
in lime mortar 1:2 including rubbing and polishing of the joints.
3/4 inch( Marble)
%PSft 0 x 425.61 = 0
23 Providing and laying floor of Verona marble tiles of size 12" x 24" x 1" fine dressed
on the surface without winding set in white cement laid over 3/4 " thick bed of 1:2
cement morter setting the tiles with grey cement slurry of white cement slurry
and washing the tiles with slurry of white cement and pigment to match the colour
of tiles including curing , grinding , rubbing and chemical polishing etc including cutting
tiles to proper profile
R.A.A
%Sft 0 x 442.75 = 0
26 Painting new surface © preparing surface and painting of doors and windows any type including
edges (I and II) 3 coats (S.I.No.5© /I and II / C-11).
0 x 2 0
0.00 x 2116.41 = 0
= 688150
PART B
1 Providing & fixing squating type white Glazed Earthenware W.C Pan
with including the cost of flushing cisteran with internal fitting and flush pipe with
bend and making requisite number of holes in walls, plinth and floor for pipe connections and
making good in cement concrete. 1:2:4 .
(B) (i) W.C of not less than 19" clear opening between
flushing rims and three gallons flushing tank with 4" dia C.I trap & C.I thumble .
item no 1 ( B) (i) page 1 Chapter Sanitary fittings
2 Providing and fixing 24" x 18" lavatory basin in white glazed earthenware complete with
and including cost of W.I or C.I cantelever (6") built into walls, painted white into 2 coats after
primary coat of red lead paint, a pair of half inch dia rubber plug chrome plated
brass chain, 1-1/4 inch dia brass waist approved pattern, 1.5" inch dia malloable iron
or brass unions and making requisite number of holes
in walls, plainth and floor for pipe connection and making good in cement and concrete 1:2:4
Foreign or equivalent.
item no 10 page 3 chapter sanitary fittings
3 Add extra labour for providing and fixing earthenware pedestral white or colored glazed
Foreign or equivalent.
item no 11 page 3 chapter sanitary fittings
( B)
( B)
3/4 inch dia brass bib cock , standard pattern
Nos 6 348.92 Each = 2094
5 Supplying and fixing concealed stop cock of superior quality with C.P head 1/2" dia.
item no 11 ( a ) chapter 6 page 18
7 Providing G.I Pipes, specials and clamps etc including fixing, cutting and fitting complete with
and including cost of breaking through walls and roof, making good etc. painting 2 coats after
cleaning the pipes etc with white zink paint with pigment to match the colour of the building and
testing with water to pressure head of 200 ft and handling
item no 1 page 12 chapter 4 ( WATER SERVICES INTERNAL)
8 Add extra labour for concealed G.I Pipe and fitting including making recess in the wall
for pipes and making good in cement concrete etc complete.
item no 2 page 12 chapter 4 ( WATER SERVICES INTERNAL)
9 Providing G.I Pipes, specials and clamps etc including fixing, cutting and fitting complete with
and including cost of breaking through walls and roof, making good etc. painting 2 coats after
cleaning the pipes etc with white zink paint with pigment to match the colour of the building and
testing with water to pressure head of 200 ft and handling
item no 1 page 14 chapter ( WATER SERVICES EXTERNAL)
PART B = 65539
PART C
10 Providing RCC Pipes & collars of class C and fixing in trench including
cutting & fitting and jointing with maxphalt compostion and cement
1:1 including testing with water to headof 45 meter or i50 C class
item no 37 PHSI d page 37
11 Providing Laying UPVC presure pipes of Class D ( equivalent make ) fixing in trench i/c cutting, fitting
and jointing with Z joint with one rubber i/c testing with water to a head 122 meter or 400 ft
item 3 (i) page 23 chapter finished item Public health
11 x 10 11 x 10
10 ft wide
12 x 10.67 7 x 10.67 7 x 10.67 12 x 10.67
7x5 7x5
11 x 10 11 x 10