PART A
1 Cost of civil work without fabrication = 436467
PART B
PART C
4 Fabrication 40 1.99
PART A
1 Excavtion in foundation of bulding, bridges and other structure including dag belling
reflling around strecture with excavated earth watering and ramming. lead upto
upto 5ft(b) in Ordinary or soft murum. (S.I.NO.18(b)/C-1
2 Cement concrete brick or stone ballast1.5 inch to2 inch guage.(b) Ratio 1:4:8. (S.I.No.4 (b) /C-4).
5 Erection and removal of centering for reniforced or palin cement concrete works of partial wood
( 2nd Class ) ( B) Vertical.
6 Cement concrete plain including placing , compacting finishing and curing complete
( including screening and washing of stone aggrete without shuttering ( F ) Ratio 1:2: 4
9 Fabrication of Miled Steel Reinforcement for Cement Concrete including cutting, bending,
laying in position, making joints and fastly including cost of binding wire (also includes \
removal of rust from bars
= 635871
PART B
1 Excavation of pipe line into trenches and pits in gravely soils i/c trimming & dressing sides to
to true alignment and shape leveling of beds of trenches to correct level and grade cutting
joint holes and disposal of surplus earth within a one chain as directed by Engineer incharge
providing fence guards lights flags and temporary crossing for non vehicular traffic where
ever required to lift upto 5' ft (1.52m) and lead upto one chain (30.50 mm ) (P.H.S.I NO. 4 P/61)
2 Excavation of pipe line into trenches and pits in all kind of soils of morum i/c trimming & dressing sides to
to true alignment and shape leveling of beds of trenches to correct level and grade cutting
joint holes and disposal of surplus earth within a one chain as directed by Engineer incharge
providing fence guards lights flags and temporary crossing for non vehicular traffic where
ever required to lift upto 5' ft (1.52m) and lead upto one chain (30.50 mm ) (P.H.S.I NO. 5 P/62)
%Sft 0 x 4650.00 = 0
3 Excavation of pipe line into trenches and pits in all kindof soils of morum i/c trimming & dressing sides to
to true alignment and shape leveling of beds of trenches to correct level and grade cutting
joint holes and disposal of surplus earth within a one chain as directed by Engineer incharge
providing fence guards lights flags and temporary crossing for non vehicular traffic where
ever required to lift upto 5' ft (1.52m) and lead upto one chain (30.50 mm ) (P.H.S.I NO. 6 P/62)
%Sft 0 x 10770.00 = 0
4 Refilling the excavated stuff trench 6'' thick layers i/c watering ramming to full compaction etc
complete (P.H.S.I.NO. 24, P/53)
0 x 2760.00 = 0
= 64260
= 4.95%
= 3181
SUB ENGINEER BUILDINGS ASSISTANT ENGINEER BUILDINGS
SUB DIVISION KOTRI DISTRICT JAMSHORO SUB DIVISION KOTRI DISTRICT JAMSHORO = 67441
)
NAME OF WORK. CONSTRUCTION OF RCC DRAINAGE LINE@
SINDH UNIVERSITY COLONY TALUKA KOTRI DISTRICT JAMSHORO.
PART C
1 Providing RCC Pipes & collars of class C and fixing in trench including
cutting & fitting and jointing with maxphalt compostion and cement
1:1 including testing with water to headof 45 meter or i50 C class
item 3 page 16 chapter finished item Public health Engineering
2 Providing Laying UPVC presure pipes of Class D ( equivalent make ) fixing in trench i/c cutting, fitting
and jointing with Z joint with one rubber i/c testing with water to a head 122 meter or 400 ft
item 3 page 23 chapter finished item Public health
3 Providing Laying & fixing in trench including fitting , jointing& testinge etc in all respect
the high density of Polythylene PE pipes .
item 1 page 25 chapter finished item Public health Engineering
= 561000
= 14.93%
= 83757
= 644757
STREET
HOUSES HOUSES
STREET
GROUND
indus higway
HOUSES
2.50 FT
2.0 ft wide
6 INCH
CC 1:4:8 BED 6 INCH
wide 4.50 ft