Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

SUPP - SOR 1

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

REPAIRS TO SPALLING CONCRETE

1 Repair of spalling concrete in common area by patch-repair m2 63.90


with approved polymer modified sand cement mortar.

2 Repair of spalling concrete by patch-repair with approved m2 155.20


epoxy mortar.

3 Repair of spalling concrete by pressure grouting with non-shrink m2 190.10


grout or other approved materials.

REPAIRS TO CEILING LEAKAGE

4 Application of crystalline or cementitous waterproofing compound m2 10.60


on to concrete surface inclusive of preparing the concrete
surface, priming, curing according to manufacturer’s instruction.

5 Application of liquid-applied flexible cementitous membrane m2 9.60


inclusive of preparing the concrete surface, priming and
curing according to manufacturer’s instructions.

6 Repair of water seepage through porous concrete by m 130.00


injecting approved water, reactive polyurethane based chemical
grout as specified.

7 Repair to localised leakage using approved water plug or no. 39.10


non-shrink grout inclusive of the use of bonding agent, water test
and making good area disturbed.

8 Repair to minor dampness on concrete surface, by removing m2 26.20


plastering from damp area, repair to the defect, grind the surface,
apply waterproofing materials, finished with skim
coat/plastering including painting to the repaired surface.

WATER SEEPAGE THRU EXTERNAL WALL

9 Supply labour and materials to repair the facing brick wall m2 26.20
panels (non-cavity wall construction)

10 Supply labour and materials to repair the facing brick wall m2 27.20
panels (non-cavity wall construction)

11 Supply labour and materials to repair the facing brick wall panels m2 21.60
(non-cavity wall construction) with 2 coats of plastering

12 Supply labour and materials to repair the patch joints between no. 1.80
precast sills

13 Supply labour and materials to repair hollow-block or solid-block m2 18.70


wall panels (non-cavity wall construction)
SUPP - SOR 2

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

14 Supply labour and materials to repair the reinforced m2 16.90


concrete/plastering finished wall

15 Supply labour and materials to repair the end cavity brick m 18.30
wall

16 Apply approved silicone sealer to cracked joints between m 2.40


wooden frames and block/brick wall etc including brushing clean
(for cracks not more than 5mm wide).

17 Supply labour and materials to rake out mortar joint to an even m 11.90
depth of 25 to 30 mm, brush out all loose sand and mortar and fill
the groove solid with approved polyurethane sealant as specified
to form a continuous sealant.

18 Extra over item 016 for filing the groove solid with an m 1.40
effective backing piece.

19 Supply labour and materials to form 55 degrees splay/fillet as m 9.10


specified and shown.

20 Supply labour and materials to rake out mortal joint to an even depth m 11.10
of 25mm. Brush out all loose sand and mortar and fill the groove solid
with approved polyurethene sealant as specified to form a continuous
sealant.

21 Supply labour and materials to rake out mortar joint to an even depth m 12.80
of 25mm. Brush out all loose sand and mortar and fill the groove solid
with approved polysylphide sealant as specified to form a continuous
sealant.

22 Extra over for approved backing rod. m 1.50

23 Supply labour and materials to form spray/fillet with approved m 8.30


polymer modified cement mortar or non-shrink grout to the correct
gradient including hacking if necessary as specified.

24 Supply labour and materials to rake out mortar joints between bricks m2 13.60
and repointing with polymar moditied cement mortar (based on area of
brick well).

25 Apply 1 approved sealer coat and 2 approved coats of elastomeric m2 6.50


waterproof membrane as specified including patching hairline cracks
on brick wall with brick colour cement if necessary.

26 Apply 2 coats of approved silane/siloxane based water penetrant as m2 11.80


specified including patching hairline cracks on brick wall with brick
colour cement if necessary.
SUPP - SOR 3

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

27 Supply labour and materials to repair the plastered wall panels by m2 18.70
applying two coats of approved proprietary plaster such as Ventonite,
Easi-Plaster and Ready-Cote etc, including hacking painting to the
repaired surface.

28 Supply labour and materials to rake out mortar joint at the interface to m 5.10
a dept of 25mm. Brush out loose sand and mortar and fill the groove
with polymer modified mortar.

29 Repair to cracks by hacking “U” groove on the cracks to 25mm width m 8.00
x 20mm depth. Brush out all loose sand and mortar and fill the groove
with polymer modified mortar including painting to the repaired
surface.

30 Repair to cracks by hacking “V” groove on the cracks and patch with m 14.70
approved polyurethane sealant including painting to the repaired
surface.

31 Repair to cracks by hacking “V” groove on the cracks and patch with m 16.70
approved polysuphide sealant including painting to the repaired
surface.

32 Supply labour and materials to repair the hollow and bulging plaster m 28.00
with polymer modified mortar and skimming proprietary material
including hacking and painting to the repaired surface.

33 Installation of special wall tie to existing brickwall including no 9.10


galvanised mesh sleeve, approved resin, stainless steel wall tie.

34 Hack off all existing plastering to walls and prepare surface to receive m2 2.90
new finish including removal of debris.

35 Hack existing plastered or concrete wall surface to form random keys, m2 2.10
clean and wash to receive new finish including removal of debris.

36 Spatterdash of cement slurry on existing surface to form keys. m2 0.50

37 Prepared and apply one coat of acrylic emulsion paint (with maximum m2 1.20
20% dilution) to surfaces of walls, ceilings, columns, etc.

38 Prepared and apply two coats of acrylic emulsion paint (with m2 2.50
maximum 20% dilution) for first coat and without dilution for second
coat to surfaces of walls, ceiling, columns, etc.

39 Prepare and apply three coats of acrylic emulsion paint (with m2 3.60
maximum 20% dilution) for first coat and without dilution for second
coat and third coat to surfaces of walls, ceilings, columns, etc.
SUPP - SOR 4

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

40 Prepare and apply three coats of approved water based Algae Resistant m2 5.30
Emulsion Paint (with maximum 10% dilution for first coat and without
dilution for second coat and third coat) to surfaces of walls, ceilings,
columns, etc.

CRACK REPAIRS

41 Hacking 13mm “V” groove along crack apply epoxy primer and m 10.90
patching with epoxy mortar including painting to the repaired surface.

42 Repair to cracks by epox injection method including painting to m 43.80


repaired surface.

43 100mm hollow block in compo mortar and reinforced all at last item m2 19.80
but blocks in each course filled in solid with 1: 3 : 6 concrate.

* Common Modular Brickwall laid in compo mortar with 100mm


joints raked 10mm deep or flush appointed as work proceed.

44 190mm thick using M211 modular brick size 190 x 90mm x 90mm m2 51.20

45 90mm thick using M211 modular bricks size 190 x 90mm x 90mm m2 16.30
reinforced with expanded metal brickwork reinforcement at every four
course.

46 90mm thick using M311 modular bricks size 290 x 90mm x 90mm m2 16.40
reinforced with expanded metal brickwork reinforcement at every
fourth course.

47 Supply and lay common brickwall laid in compo mortar with 10mm m3 207.20
joint raked 10mm deep for flush pointed for brick pier or column.

Extra over brick wall for the provision of HOT-DIPPED


GLAVANISED STEEL WALL TIE SYSTEM fastened vertically to
reinforced concrete surfaces including HOT-DIPPED GALVANISED
BONDING BAR SYSTEM at both end edges of brick wall as shown
in drawing no. EM-TC-STD-BLDG-0402-08

48 Brick wall cladding to rc wall m2 10.90

49 Outer leaf of brick cavity wall cladding to rc wall m2 11.10

50 Extra over half brickwall/solid block wall for the provisioin of HOT m 4.90
DIPPED GALVANISED BONDING BAR SYSTEM to the end edges
of brick wall/solid block wall as shown in drawing no. EM-TC-STD-
BLDG-0402-08
SUPP - SOR 5

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

51 Supply labour and materials to repair cracks on brickwall by No. 7.20


strengthening with stainless steel wall tie rod comprising the following
(Fill and patch cracks to be measured separetely).

(i) Drill a 12mmm diameter hole through brick into reinforced


concrete substrate (inner leaf). The minimum depth of the hole in
the concrete substrate should be 50mm. The horizontal and
vertical spacings of the holes are 600mm centre to centre and
400mm centre to centre respectively. Clean the hole thoroughly
by blowing out dust with a hand pump.
(ii) Insert a 12mm diameter galvanised mesh sleeve through the brick
to the end of the hole in the concrete.

(iii) Inject approved epoxy rezin “Hilti’s HY 150 hybrid” adhesive or


other approved resin to the pre-drilled hole in the concrete and
brick till it flows out of the hole.

(iv) Insert a 8mm diameter approved stainless steel tie rod to the end
of the hole in the concrete.
(v) Allow the epoxy resin to cure
(vi) Patch hole on the brick surface with colour cement to match the
surrounding.

REPAIR TO WATER SEEPAGE BIN CHUTE

52 Purchase and submission of drawings and roof plans by Professional Per Block $400.00
Engineer to the relevant authorities for approval. (including
endorsement of drawings by Professional Engineer) (Building having
similar roof plans/design shall be included in this rate and shall NOT
be paid separately under one block)

53 To carry out testing of special design single man mechanical Per Test $100.00
suspended cradles by Qualified Professional Engineer and obtain
approval from the relevant authorities.

54 Supply and install special design single man mechanical suspended Per No $460.00
cradle to roof top including Professional Engineer certifying the
proper installation according to the PE’s design calculations, drawings
and roof plans, hiring & rental charges.

55 Labour for shifting approved mechanical suspended cradle within Per Shift $57.50
same block.

56 Hiring charge for the installation of approved SOA unit with approved Per No $50.00
ELCB including all necessary accessories .
SUPP - SOR 6

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

57 Provision of 20 Litres refuse containers complete with cover and Per Unit $15.00
handler for affected households’ usuage including daily clearing of
debris. (Twice daily)

58 Supply labour & materials to seal and block up all refuse chute Per Unit $5.00
hoppers during progress of works and unseal upon completion.

59 To provide fumigation prior to inner of bin chutes with approved Per Chute $24.50
insecticide or by other means as approved by the relevant authorities.

60 Provision of portable ventilator 230/204v, frequency 50/60Hz watts Per Chute $30.00
320w speed 2800v/min with air delivery of 65m3/min for proper
ventilation for workmen working within enclosed area.

61 Preparation of Inner wall surface – Brush, wash down internal walls Per Chute $2,500.00
with high-pressure water jet and with any other tools including
removal all stains, solid grease or waste deposits on inner walls by
scrapping, griding, chipping or other methods approved by the S.O.
Representative and repair to spalling concrete by approved epoxy
mortar.

62 Construction of new 600mm reinforcement concrete low wall around Per No $650.00
bin chute opening for installation of inspection cover on top of bin
chute inclusive of Professional Engineer’s submission to relevant
authorities, including method statement to be submitted and certified
by a Professional Engineer and to seek clearance from HDB before
cutting of roof slab.

63 Cut through / hack off existing roof slab above refuse chute. ( All Per No $295.50
dimensions)

64 Supply & fix 40mm thick inspection cover for refuse chute overall Per No $638.30
size 1140 X 1140mm to top of refuse chute comprising of 1.2mm
thick anodised aluminium alloy sheets on both faces supported with
1.2mm thick hot-dipped galvanised “C” channel bracings and in filled
with rockwool insulation complete with 5mm thick extruded
aluminium section framings stay hingers & 150 X 150 X 8mm
diameter hot-dipped galvanised steel (HB 715A) safety mesh
supported on 75 X 75 X 6mm & 6.85 kg/m hot-dipped galvanised
steel angle including stainless steel friction stay, hinges, etc to
manufacturer’s detail and submission to relevant authorities.

65 Remove existing inspection door at the highest unit and provision of Per No $800.00
new plaster wall to seal up the opening including all submission to
relevant authorities.

66 Supply & apply base sealer coat to surface with film thickness of 35- Per m2 $18.00
microns/coat for penetration into concrete surface to strength the
concrete surface and act as a tie coat for subsequent coat.
SUPP - SOR 7

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

67 Supply & apply 2 coats of waterproofing and protective coating to Per m2 $32.00
surface. with film thickness of 2000 microns. Toweled to smooth.

68 Watertightness test to bin chute. Per Bin $11.60


chute

ELECTRICAL

Supply, deliver to site and install the following including connecting


wiring, mounting brackets, screws, connections and removing any
existing luminaire if any including all necessary accessories

69 Mounting channel fluorescent luminaries complete with 1 x 18W tube No $27.00


and low-loss ballast (max. 6.5 W) including flexible connecting
cables, screws or ramsets

70 Mounting channel fluorescent luminaries complete with 1 x 36W tube No $28.00


and low-loss ballast (max. 6.5 W) including flexible connecting
cables, screws or ramsets

71 Surface mounted luminaires c/w gauge 22 polyester powder coated No $47.00


electro-galvanized steel, reeded ABS or equivalent end caps shall be
attached or removed without tools, white polyester powder coated
reflector with not less than gauge 24 shall have a waveform curvature
with 2 heat resistant plastic head securing screws such that the gap
between the housing reflector and screws shall not be seen from
normal view, including approved low lost ballast & tube ( 1 x 18W
type )

72 Surface mounted luminaires c/w gauge 22 polyester powder coated No $52.00


electro-galvanized steel, reeded ABS or equivalent end caps shall be
attached or removed without tools, white polyester powder coated
reflector with not less than gauge 24 shall have a waveform curvature
with 2 heat resistant plastic head securing screws such that the gap
between the housing reflector and screws shall not be seen from
normal view, including approved low lost ballast & tube ( 1 x 36W
type )

73 Wire guard fluorescent luminaries complete with 1 x 18W tube and No $36.50
low-loss ballast (max. 6.5 W) and integral cam-lock including flexible
connecting cables, screws or ramsets

74 Wire guard fluorescent luminaries complete with 1 x 36W tube and No $37.50
low-loss ballast (max. 6.5 W) and integral cam-lock including flexible
connecting cables, screws or ramsets

75 Weatherproof fluorescent luminaire complete with 1 x 36W tube No $86.00


including flexible connecting cables, screws or ramsets
SUPP - SOR 8

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

76 Weatherproof fluorescent luminaire complete with 2 x 36W tube No $109.00


including flexible connecting cables, screws or ramsets

77 Recessed downlight fitting ceiling ring diameter 160mm complete No $76.40


with SL lamp

78 Recessed downlight fitting ceiling ring diameter 185mm c/w 1 x 13W No $117.30
PL lamp & silver reflector

79 Recessed downlight fitting ceiling ring diameter 225mm c/w 2 x 13W No $151.80
PL lamp & silver reflector

80 ‘Hubell’ Primeter floodlight complete with aluminium body integral No $360.00


control gear polycarbonate diffuser with 70W Sodium lamp or 125W
mercury vapour lamp and 4024C mounting brackets

81 ‘Thorn’ PIAZZA security floodlight Cat. OS 50.4/70.4 c/w injection No $260.00


moulded black polycarbonate integral control gear, polycarbonate
diffuser and 50W/ 70W sodium-T lamp

82 Labour to remove existing post top latern including reinstatement of No $10.80


surfaces, transportation and disposal of post top lantern off site

83 Removal of post top lantern including excavation, taking off of poles, No $48.50
concrete foundation, backfilling, reinstatement of ground surfaces,
transportation and disposal of surplus earth and post top lantern off
site

84 ‘INDALUX’ post top polycarbonate clear diffuser lantern cat no 250- No $499.00
IJB-RK complete with 80E / 125W HPL-N lamp and integral control
gear

85 ‘INDALUX’ post top polycarbonate clear diffuser lantern cat no 250- No $520.00
IJB-RK complete with 70W / 50W Sodium lamp and integral control
gear

86 ‘INDALUX’ post top polycarbonate cleardouble prismatic diffuser No $635.00


lantern cat no 250-IJB-RK complete with 80W / 125W HPL-N lamp
and integral control gear

87 ‘INDALUX’ post top polycarbonate cleardouble prismatic diffuser No $665.00


lantern cat no 250-IJB-RK complete with 70W / 50W Sodium lamp
and integral control gear

88 400 x 400 x 300 thick grade 30 concrete block act as base for bollards No $15.90
including reinstatement of ground
SUPP - SOR 9

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

89 ‘Philips’ decorative bollard cat no. HGC 130 with opal-white cube and No $441.00
vandal-resistant glass-fibre reinforced polyester column complete with
80W NPL-N lamp and integral control gear

90 ‘Philips’ decorative bollard cat no. HGC 130 with opal-white cube and No $451.00
vandal-resistant glass-fibre reinforced polyester column complete with
70W SON lamp and integral control gear

91 ‘Philips’ decorative bollard cat no. HGC 131 with clear cube, built-in No $472.00
white lacquered aluminium louver system and vandal-resistant glass-
fibre reinforced polyester column complete with 80W HPL-N lamp
and integral control gear

92 ‘Philips’ decorative bollard cat no. HGC 131 with clear cube, built-in No $472.00
white lacquered aluminium louver system and vandal-resistant glass-
fibre reinforced polyester column complete with 125W HPL-N lamp
and integral control gear

93 ‘Philips’ decorative bollard cat no. HGC 131 with clear cube, built-in No $482.00
white lacquered aluminium louver system and vandal-resistant glass-
fibre reinforced polyester column complete with 70W SON lamp and
integral control gear

94 Selux licol garden bollard 600mm ht. cat no.SX 702-11-2 c/w 80W No $860.00
HPL-N lamp and integral control gear

95 Selux licol garden bollard 1000mm ht. cat no.SX 702-14-2 c/w 50W / No $948.00
70W high pressure sodium lamp and integral control gear

96 Selux licol garden bollard 1000mm ht. louvred head cat no.SX 700- No $983.00
19-2 c/w 50W / 70W high pressure sodium lamp and integral control
gear

97 Selux licol garden bollard 1000mm ht. louvred head cat no.SX 700- No $956.00
19-2 c/w 80W HPL-N lamp and integral control gear

98 Floodlight fitting of corrosion resistant die-cast aluminium alloy body No $854.00


with cooling fins, hinged and framed safety glass thermal shock
resistant, stainless steel locking devices, weatherproof and non-aging
silicon rubber gasket c/w spigot cap, built-in control gear and 250
watts tubular sodium lamp

99 Floodlight fitting of corrosion resistant die-cast aluminium alloy body No $864.00


with cooling fins, hinged and framed safety glass thermal shock
resistant, stainless steel locking devices, weatherproof and non-aging
silicon rubber gasket c/w spigot cap, built-in control gear and 400
watts metal halide tubular lamp
SUPP - SOR 10

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

Supply, deliver to site, erect and install lighting columns complete


with 5 Amp ‘HRC’ fuse, accessories, cable glands, shrouds, locks,
internal wiring including painting identification numbers

100 8 metre post top hot dip galvanized lighting column, all as shown No $700.00
including all necessary concrete foundation, cement skirting,
excavation, backfilling and reinstatement of ground surfaces

101 10 metre post top hot dip galvanized lighting column, all as shown No $790.00
including all necessary concrete foundation, cement skirting,
excavation, backfilling and reinstatement of ground surfaces

102 3 metre or 3.75 metre post top hot dip galvanized lighting column all No $380.00
as shown including all necessary concrete foundation, cement skirting,
excavation, backfilling and reinstatement of ground surfaces

103 Double arm 3 metre or 3.5 metre post top hot dip galvanized lighting No $398.00
column and powder coated black colur all as shown including all
necessary concrete foundation, cement skirting, excavation,
backfilling and reinstatement of ground surfaces

104 Single quarter arm 3 metre or 3.5 metre post top hot dip galvanized No $400.00
lighting column and powder coated black colur all as shown including
all necessary concrete foundation, cement skirting, excavation,
backfilling and reinstatement of ground surfaces

105 Supply and fix 80mm diameter 200mm length steel adaptor with No $42.00
spigot to lighting column for mounting or post top lantern c/w
mounting screws

106 Supply and install 200 x 50mm electro-galvanised steel trunking with m 23.80
removable cover for telephone cables fixed to wall or ceiling complete
with slotted brackets and fixing accessories as specified.

107 Supply and install 200 x 75mm electro-galvanised steel trunking with m 25.20
removable cover for telephone cables fixed to wall or ceiling complete
with slotted brackets and fixing accessories as specified.

108 Supply and lay 155mm diameter Class 'B' UPVC pipe for m 9.20
underground LT reticulation cables with concrete haunching and
necessary fabric reinforcement at pipe joints including the provision of
a nylon/polyethelane rope and testing of pipe on completion
(excavation and sand bed measured separately).

109 Extra over 155mm diameter UPVC pipe for Grade 20 concrete m 4.60
haunching throughout including all necessary formwork and A6 WSF
reinforcement (excavation measured separately).
SUPP - SOR 11

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

110 Supply and fix UPVC plugs at pipe mouth of 155mm diameter UPVC no 4.60
pipe in draw pits.

111 Supply and lay 110mm diameter UPVC lead-in pipe in trench (trench m 4.10
measured separately) including end cap.

112 Supply and lay 172.4mm wide (nominal) x 2mm thick high impact m 2.30
UPVC cable cover plates with embossed letterings as specified.

Supply and lay drawpits for underground LT reticulation cables


comprising of 100mm thick 'L' shaped pc slabs as walls, 100mm thick
concrete base reinforced with A6 WSF reinforcement, the pit filled
with sand bags and covered with 450 x 450 x 75mm thick precast
concrete top cover slabs with UPVC plates for various shapes and
types as specified (measured flat on plan – excavation measured
separately) :-

113 Rectangular shaped. m2 165.10

114 'T' shaped. m2 125.30

115 'L' shaped. m2 129.30

116 'X' shaped. m2 116.50

117 'Y' shaped. m2 126.10

118 'R' shaped. m2 139.40

119 Supply and fix vertical drawpit marker comprising of 75mm diameter no 25.80
heavy duty UPVC conduit pipe with purpose made capping cover as
specified.

BIRD CONTROL
120 Supply and fix 13mm long stainless steel spike sharpen from 3.2mm No $2.70
diameter rod complete with 35mm X 15mm X 3mm base plate
including all necessary fixing accessories

121 To supply and install 20mm X 20mm square high density polyethylene m2 36.00
UV stabilized, flame & abrasion resistant net including all necessary
stainless steel accessories, access and making good all works
disturbed.
122 To supply and install 30mm X 30mm square high density polyethylene m2 30.00
UV stabilized, flame & abrasion resistant net including all necessary
stainless steel accessories, access and making good all works
disturbed.
SUPP - SOR 12

SCHEDULE OF RATES

SUPPLEMENTARY

S/N DESCRIPTION UNIT RATE ($)

123 To supply and install 50mm X 50mm square high density polyethylene m2 24.00
UV stabilized, flame & abrasion resistant net including all necessary
stainless steel accessories, access and making good all works
disturbed.

124 To supply and install stainless steel spikes including all necessary m 33.00
stainless steel accessories, access and making good all works
disturbed.

125 To supply and install UV stabilized polycarbonate bird slide net m 50.00
including all necessary stainless steel accessories, access and making
good all works disturbed.

126 To supply and install stainless steel bird coils including all necessary m 20.00
stainless steel accessories, access and making good all works
disturbed.

127 To supply and install stainless steel bird wire including all necessary m 1.50
stainless steel accessories, access and making good all works
disturbed.

CRC HOPPER

128 Supply and fix foot-operated grade 304 stainless steel refuse chute No $1,200.00
hopper to centralized refuse chute complete with all necessary fixing
accessories

129 Replacement of new air cylinder (OD 25mm, shaft 10mm diameter No $46.00
stroke 150mm) for small hopper

130 Replacement of new air cylinder (OD 32mm, shaft 12mm diameter No $55.00
stroke 160mm) for small hopper

131 Replacement of stainless steel spring including lubricating all joints No $6.00
within the compartment all necessary fittings and fixings and make
good

132 Replacement of rubber stopper of linkage mechanism No $9.00

133 Replacement of air filter of air cylinder No $10.00