Tentative non – binding quotation for CAR Quotation for
M/s. Areen Al Khaleej United Trading & Contracting Co. L.L.C Type: Section I: Contractors All Risks Section II: Third Party Liability Form: As per MRE Standard CAR/TPL wording plus endorsements attached hereby. Insured: M/s. Areen Al Khaleej United Trading & Contracting Co. L.L.C as main contractor and/or Exahertz International (SFZ) SPC as Principal and/or Al Manarah Engineering Consultancy / Goldingen as Consulting Engineers and/or AAA Aldymaniyat Alraydt Almthdt as Sub‐Contractor and/or any Sub‐Contractor and/or any Vendor and/or any Consultant and/or Engineers and/or technicians of all tiers for their respective rights and interests. Project Title: Exahertz Technology Park Plot: RY‐PH 01A‐M1‐M2‐057 Plot: RY‐PH 01A‐M1‐M2‐055 Project Location: Salalah Free Zone. Scope of Works: DESIGN & BUILD (CIVIL WORKS, MEP, METALLIC HANGARS, CONTAINERS, WATER COOLING & GRP TANKS, ADMINISTRATION OFFICES, DATA CENTER, ELECTRICAL SUBSTA‐ TIONS) Period: From 01/09/2023 till 31/12/2023, plus 12 months maintenance period. Sum Insured: Section I – Material Damage: OMR 7,902,500.000 Contract Works + 15% OMR 770,000.000 Material Supplied by Principal OMR 2,117,500.000 Value of 10 containers OMR 5,005,000.000 Clearance of Debris OMR 10,000.000 Section II – Third Party Liability (Excluding USA, Canada & Australia):_ OMR 1,000,000.000 Combined singe limit for both Bodily Injured and Third‐Party Property Damage anyone occurrence and in the aggregate Territorial Limits: Sultanate of Oman Deductible(s): Section I: Material Damage ‐ 10 % of loss, min. OMR 5,000/‐ eel for NATCAT events including but not limited to cyclones, winds, floods and heavy rain. ‐ 10 % of loss, min. OMR 2,500/‐ eel for AOG other than NATCAT events, Major Perils, subsidence, Fire, Explosion, and maintenance. ‐ OMR 1,000/‐eel for all other losses. ‐ Section II: Third Party Liability: ‐ OMR 1,000/‐eel for TPPD ‐ 20% of loss, min. OMR 4,000/‐ eel for Underground Properties and VRWS (MR 102 & MR 120) Conditions: All Terms Clauses and Conditions as Original and to follow the Original in every respect within the Terms of this Insurance and subject to: MR 001‐SRCC‐ up to 100% of the contract value. MR 002‐cross liability (against named insured only) MR 004‐extended maintenance‐12 months MR 006 Cover of Extra Charges for Overtime, Night Work, Work on Public Holidays, Express Freight – OMR 5,000 in the aggregate. MR 007 Cover of Extra Charges for Airfreight – OMR 5,000 in the aggre‐ gate. MR 013 Property in off‐site storage OMR 5,000 any one location and 2 lo‐ cations in the aggregate. (in Oman only and for named locations only) MR 102‐underground cables and pipes MR 106‐Sections‐ 250 m and 4 sections in the aggregate MR 109‐warranty concerning construction material MR 110‐safety measures MR 111‐ROD‐limit: As mentioned above. MR 112‐fire fighting facilities and fire safety on construction sites (limit: OMR 50,000) MR 113 Inland Transit up to a limit : OMR 10,000 per conveyance and OMR 50,000 in the aggregate MR 117‐Trenches 250 m any one section and 4 sections in the aggregate MR 120‐Vibration, removal and weakening of support MR 121‐piling foundation and retaining wall works MR 214‐subsidence 72 hours clause Escalation 15% Professional fees‐limit OMR 5,000 in the aggregate. Exclusions: Any kind of Transit Risk IT Clarification Agreement Absolute fungi liability exclusion attached Business Interruption/ Loss of Profits/ consequential loss Communicable Disease Exclusion‐ LMA5394 Total Asbestos Exclusion Clause Transmission and Distribution Lines Exclusion Contractual liability, manufacturers guarantee Damage due to terrorism risk Decennial Insurance Damage due to testing involving the imposition of abnormal conditions or intentional overloading Damage for which the supplier or manufacturer is responsible Data exclusion‐ Direct business interruption attached Electrical, mechanical or electronic derangements. Full design cover (the faulty part itself) Industries, seepage, pollution and contamination clause attached Contingent Business Interruption (CBI) Loss or damage to existing structure, property being worked upon & property in care, custody & control of the insured. Loss or Damage To The Insured Items Directly Or Indirectly Arising From The Impact Of Marine Vessels. Loss or damage to vehicles designed for general road use Loss/damage to insured plant and machinery due to: Nuclear energy risks exclusion clause (Insurance) (1994) Political risk exclusion clause Pre‐existing faults & damages Sanction limitation and exclusion clause Sue and Labour Clause Tandem Lifting Total asbestos exclusion clause War and nuclear perils Willful act/negligence of the insured Delay in Start‐Up (DSU) / Advance Loss of Profit (ALOP) LEG 2 or 3 Mid‐term project DSU, CBI Operational cover Subjectivities: PPW: 60 days from date of inception of the policy. No incurred losses before binding the cover. No Automatic extensions Choice of law & jurisdiction: JURISDICTION CLAUSE It is hereby understood and agreed that the following Conditions and/or General Conditions: Jurisdiction, Interpretation, Forum Selection, Service of Process, Conduct of Legal Action, and/or any other Condition or General Condition which may be applicable are hereby modified to incorporate Local Jurisdiction of Oman on the following basis: This Insurance shall be governed by the law of Oman in which the Insured is located whose Courts shall have jurisdiction in any dispute arising hereunder. Premium: RO. 10,045.206 + Government tax @ 1.6% + Policy Fee – RO. 2.‐ + VAT @ 5%. Total Premium – RO. 10,718.325.‐. (Inclusive of All).