Interconnecting Utilities and Offsite of MOKRAN

Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 1 of 6

Marking and Tagging Procedure for HDPE Material

Approved: Vendor shall issue “AFC/ AFD/AFP/AFT/AFI” status.


Code1
Approved as noted: Vendor to amend and submit the “Issued for
Code 2
Approval” status.
Commented: Vendor to amend and submit the “Issued for Approval”
Code 3
status.
Rejected: (vendor to resubmit with same revision
Code 4
The above checking result by Purchaser shall in no way relieve Vendor of any liability,
obligation and responsibility out of the purchase order and the mutual agreement in writing

Date: Dept.: Signature:

Only for internal review


CV PI EL IN ME MA
ST MC PR SF HV TC

A 04-Jan-2023 ISSUE FOR COMMENT A.Amini A.Amini A.Amini


Rev. DATE PURPOSE OF ISSUE PREPARED CHECKED APPROVED
Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 2 of 6

Revision Index
Revisions Revisions
Page Page
A B C D E F G A B C D E F G
1 X 51
2 X 52
3 X 53
4 X 54
5 X 55
6 X 56
7 57
8 58
9 59
10 60
11 61
12 62
13 63
14 64
15 65
16 66
17 67
18 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100
Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 3 of 6

TABLE OF CONTENT

1. Goal ..................................................................................................................................................................4
2. Scope ................................................................................................................................................................ 4
3. Project Specification ........................................................................................................................................4
4. Standards ..........................................................................................................................................................4
5. Marking ............................................................................................................................................................5
1. GENERAL .......................................................................................................................................................5
2. PIPES ............................................................................................................................................................... 5
3. Fittings and Flanges .........................................................................................................................................5
6. Tagging ............................................................................................................................................................6
1. PIPES ............................................................................................................................................................... 6
2. Fittings and flanges ..........................................................................................................................................6
Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 4 of 6

1. GOAL
The goal of this procedure is to offer a method for Inspection, Marking and Tagging HDPE Pipes during
production and on the final Products.

2. SCOPE
This procedure consists all products of P.E.S Co, includes pipes and fittings.

3. PROJECT SPECIFICATION
• Negin Mokran Development Petrochemical Co. (NMPC) has decided to develop a third hub of
Petrochemical Industries in Chabahar Free Trade-Industrial Zone.
• Based on detailed investigation, 1,200 hectares of Chabahar Free Trade- Industrial Zone with
dimensions of 2.7 × 4.4 Km has been allocated for petrochemical zone.
• Mokran Abniroo "MAN" is a company organized and exists under the laws of the Islamic Republic of Iran
and is a sub-company of NMPC, desires to establish "Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1".

4. STANDARDS
INSO 14427-2:
Plastics –Piping systems for water supply and for drainage and sewerage under pressure — Polyethylene
(PE) — Part 2: Pipes
ISO 4427-2:
plastics piping systems polyethylene (PE) pipes and fittings for water supply Part 2: pipes
EN 12201-2:
plastics piping systems for drainage and sewerage under pressure - polyethylene (PE) part 2: pipes
DIN 8074:
polyethylene (PE) - Pipes PE80/PE100 - Dimensions
Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 5 of 6

5. MARKING
1. GENERAL
Standards requires that all pipes, fittings and flanges shall be permanently and legibly marked in such a way
that marking does not initiate cracks or other types of failure and such that normal storage, handling,
installation and use does not affect the legibility of the marking.
Note: P.E.S Co. is not responsible for marking becoming illegible due to actions caused during installation
and use such as painting, scratching, or by use of detergents, etc.
2. PIPES
Standard requires that the pipe be marked of frequent intervals approximately 1 meter.
The marking include:
Material designation: PE100
Manufacturer’s Name: P.E.S Co.
Standard No.: INSO 14427
Pipe SDR:
Dimensions (dn x en):
Date of manufacturing:
Machine number:
Intended use: W
Pressure rating in bar:
3. FITTINGS AND FLANGES
All Fittings & Flanges are marked with laser engraver
-Manufacturer's Name: P.E.S. CO
-Dimensions
-SDR
-Material designation
Interconnecting Utilities and Offsite of MOKRAN
Petrochemical Complex - Stage 1

Marking and Tagging Procedure for HDPE Material

Purch. Vendor. PO No. Dis. Tag No. Doc. Seq. Rev.


Document No.:
TSC PES 0003 QC BM VPCR 007 00
TSC PES 0003 QC BM VPCR 007 A Page 6 of 6

6. TAGGING
1. PIPES
Quality control and inspection is performed during the production and on the final products.
After positive results of quality controls and inspections according to QA standards, the specification label
with a QC stamp is tagged inside the pipe.
This label indicates quality assurance of pipes produced by P.E.S Company.

2. FITTINGS AND FLANGES


The laser engraver simultaneous indicates the quality assurance of fittings and flanges.
All Production and Quality control documents are kept in our factory and could be presented if necessary.