Professional Documents
Culture Documents
ATSU replacement
ATSU replacement
TASK 46-21-00-610-801-B
Uploading of the ATSU Software
CAUTION: YOU MUST DO THE UPLOADING OF THE AOC/ATC APPLICATION SOFTWARE AND ASSO-
CIATED DATABASE AFTER UPLOADING OF THE ATSU A/C INTERFACE SOFTWARE. UP-
LOADING OF THE ATSU A/C INTERFACE SOFTWARE ERASES THE AOC/ATC APPLICATION
SOFTWARE AND ASSOCIATED DATABASE.
FIN : 1TX1
1. Reason for the Job
Self explanatory
2 Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
No specific 1 LOADER - DATA, PORTABLE
(ALT45200001) 1 PORTABLE DATA LOADER
C. Referenced Information
REFERENCE DESIGNATION
(Ref. 24-41-00-861-801-A). Energize the Aircraft Electrical Circuits from the External Power A
(Ref. 24-41-00-861-801-A-01). Energize the Aircraft Electrical Circuits from the APU (APU Started
with APU BAT)
(Ref. 24-41-00-861-801-A-03). Energize the Aircraft Electrical Circuits from the External Power A and
B
(Ref. 24-41-00-861-801-A-04). Energize the Aircraft Electrical Circuits from the APU (APU started with
External power A)
(Ref. 24-41-00-861-801-A-05). Energize the Aircraft Electrical Circuits from the External Power B
(Ref. 24-41-00-862-801-A). De-energize the Aircraft Electrical Circuits from the External Power A
(Ref. 24-41-00-862-801-A-01). De-energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-862-801-A-03). De-energize the Aircraft Electrical Circuits from the External Power A
and B
(Ref. 24-41-00-862-801-A-04). De-energize the Aircraft Electrical Circuits from the External Power B
(Ref. 45-10-00-860-832-A). Procedure to get access to the SYSTEM REPORT/TEST INFORMA-
TION SYSTEM page
REFERENCE DESIGNATION
3. Job Set-up
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
(1) Do the procedure to get access to the SYSTEM REPORT/TEST INFORMATION SYSTEM page
(Ref. AMM TASK 45-10-00-860-832) .
(2) First case, the access to the LRU IDENT page is not possible:
· No A/C INTERFACE software is loaded into the ATSU, so you can do the uploading procedure in
Para. 4.A.
(3) Second case, the access to the LRU IDENT page is possible:
· On the MCDU, do a check of the software reference pre-loaded into the ATSU.
ACTION RESULT
1.On the MCDU: On the MCDU:
· push the line key adjacent to the INFORMA- · the ATIMS menu page comes into view.
TION SYSTEM indication.
2.On the ATIMS page: On the MCDU:
· push the line key adjacent to the LRU IDENT · the LRU IDENTIFICATION page comes into
indication. view.
3.On the LRU IDENTIFICATION page:
· make sure that the P/N reference shown below
the software indication is not the same as the
reference read on the related disk(s) before you
do the uploading procedure in Para. 4.A.:
ATSU A/C INTERFACE for the ATSU A/C
INTERFACE software (disk 20TX)
ATSU CONFIG for the ATSU CONFIGURA-
TION software (disk 21TX)
ATSU ROUTR PARAM for the ATSU
ROUTER PARAMETERS software (disk
30TX).
· do a check of the reference of the software pre-uploaded in the ATSU, on the MCDU.
ACTION RESULT
1.On the MCDU: On the MCDU:
· push the line key adjacent to the INFORMA- · the ATIMS menu page comes into view.
TION SYSTEM indication.
2.On the ATIMS page: On the MCDU:
· push the line key adjacent to the LRU IDENT · the LRU IDENTIFICATION page comes into
indication. view
3.On the LRU IDENTIFICATION page:
· make sure that the P/N reference shown below
the software indication is not the same as the
reference read on the related disk(s) before you
do the uploading procedure in Para. 4.D.:
ATSU AHMI P/N for ATC HMI UTILITIES
software (disk 25TX)
ATSU FANS A for the ATSU ATC FANS A
APPLICATIONS software (disk 35TX)
ATSU ARINC623 for the ATSU ATC ARINC
623 APPLICATIONS software (disk 23TX)
ACTION RESULT
1.On the MCDU: On the MCDU:
· Push the MCDU MENU mode key. · The MCDU MENU page comes into view.
2.On the MCDU MENU page: On the MCDU:
· Push the line key adjacent to the ATSU indica- · The ATSU DATALINK page comes into view.
tion.
3.On the ATSU DATALINK page: On the MCDU:
· Push the line key adjacent to the AOC MENU in- · The AOC MENU page comes into view.
dication.
4.On the AOC MENU page On the MCDU:
· Push the line key adjacent to the MISC MENU in- · The MISC MENU comes into view.
dication.
On the MISC MENU page On the MCDU:
· Push the line key adjacent to the SYSTEM CON- · The SYSTEM CONFIG page comes into view
FIG indication. · Make sure that there is no AOC Software/Data-
base P/N reference shown or that the AOC Soft-
ware/Database P/N reference shown is not the
same as the reference read on the disk(s) of the
AOC Software/Database 22TX/24TX before you do
the uploading procedure in Para. 4.C.
NOTE: The uploading time for a full disk changes in relation to the software. The maximum uploading time
is 40 minutes.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data uploaded into the ATSU, on the MCDU.
ACTION RESULT
On the MDDU:
· The < < MDDU READY > > indication is shown.
1.Use the disk(s) 20TX found in the disk storage
box.
2.On panel 265VU:
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.On the MDDU: On the MDDU:
· Put the disk into the disk drive, with the label in · The READY indication is shown.
the forward direction. · Then, the WAIT RESPONSE indication is shown
for a very short time.
· Then, the TRANSF IN PROG indication is shown.
On the EWD:
ACTION RESULT
· The DATALINK ATSU FAULT warning is shown.
On the MCDU MENU page:
· The ATSU prompt is not shown.
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
NOTE: This procedure is used to upload software with the Portable Data Loader (PDL) (PMAT2000 KIT or
equivalent).
NOTE: If the PDL has the digital signature check, two messages can be triggered by the PDL:
- One if the PDL detects that the software is not signed (refer to PDL user-guide), this message
can be ignored and has no effect on A/C software uploading.
- One if the PDL detects an incorrect or corrupted signature (refer to PDL user-guide), then the
software uploading will not be possible and another software has to be used.
For data security reasons, Airbus recommends that the user does a report of the fault to his
Aircraft Security Focal Point.
NOTE: The loading time for a full disk changes in relation to the software. The maximum loading time is
40 minutes.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data loaded into the ATSU, on the MCDU.
ACTION RESULT
1.Use the disk(s) 20TX found in the disk storage
box.
2.On the panel 265VU:
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.Upload the ATSU A/C INTERFACE Software
(Refer to the portable data-loader user-guide).
On the EWD:
· The DATALINK ATSU FAULT warning is shown.
4.On the panel 265VU: On the EWD:
· Set the two DATA LOADER selector switches to · The DATALINK ATSU FAULT warning goes out of
OFF. view after one minute approximately.
EMB SB 46-4016 for A/C 101-102, 153-159, 161-163, 165-165, 301-303, 351-351
EMB SB 46-4023 for A/C 101-102, 153-159, 161-163, 165-165, 301-303, 351-351
Subtask 46-21-00-970-067-B
C. Loading of the ATSU CONFIGURATION software (21TX) and/or the ATSU ROUTER PARAMETERS
software (30TX)
NOTE: The loading time for a full disk changes in relation to the software. The maximum loading time is
40 minutes.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data loaded into the ATSU, on the MCDU.
NOTE: When you upload the FIN 30TX, if the P/Ns of the FINs 20TX and 30TX are not compatible:
- It is necessary to upload again the ATSU software 20TX and 21TX.
ACTION RESULT
On the MDDU:
· The < < MDDU READY > > indication is shown.
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.On the MDDU: On the MDDU:
· Put the disk into the disk drive, with the label in · The READY indication is shown.
the forward direction. · Then, the WAIT RESPONSE indication is shown
for a very short time.
· Then, the TRANSF IN PROG indication is shown.
On the EWD:
· The DATALINK ATSU FAULT warning is shown.
On the MCDU MENU page:
· The ATSU prompt is not shown.
ACTION RESULT
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
NOTE: This procedure is used to upload software with the Portable Data Loader (PDL) (PMAT2000 KIT or
equivalent).
NOTE: If the PDL has the digital signature check, two messages can be triggered by the PDL:
- One if the PDL detects that the software is not signed (refer to PDL user-guide), this message
can be ignored and has no effect on A/C software uploading.
- One if the PDL detects an incorrect or corrupted signature (refer to PDL user-guide), then the
software uploading will not be possible and another software has to be used.
For data security reasons, Airbus recommends that the user does a report of the fault to his
Aircraft Security Focal Point.
NOTE: The loading time for a full disk changes in relation to the software. The maximum loading time is
40 minutes.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data loaded into the ATSU, on the MCDU.
NOTE: When you upload the FIN 30TX, if the P/Ns of the FINs 20TX and 30TX are not compatible:
- It is necessary to upload again the ATSU software 20TX and 21TX.
ACTION RESULT
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.Upload the ATSU CONFIGURATION software
(21TX) and/or the ATSU ROUTER PARAMETERS
software (30TX) (Refer to the portable data-loader
user-guide).
On the EWD:
· The DATALINK ATSU FAULT warning is shown.
4.On the panel 265VU: On the EWD:
· Set the two DATA LOADER selector switches to · The DATALINK ATSU FAULT warning goes out of
OFF. view after one minute approximately.
NOTE: The loading time for one full disk is ten minutes approximately.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data loaded in the ATSU, on the MCDU.
ACTION RESULT
On the MDDU:
· the < < MDDU READY > > indication is shown.
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
· set the DATA LOADER/SEL A selector switch to
TO SEL B.
· set the DATA LOADER/SEL B selector switch to
ATSU1.
3.On the MDDU: On the MDDU:
· put the disk into the disk drive, the label in the for- · the READY indication is shown
ward direction. · then, the WAIT RESPONSE indication is shown for
a very short time
· then, the TRANSF IN PROG indication is shown.
ACTION RESULT
DATALINK ATSU FAULT warning comes into
view during the test.
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
NOTE: This procedure is used to upload software with the Portable Data Loader (PDL) (PMAT2000 KIT or
equivalent).
NOTE: If the PDL has the digital signature check, two messages can be triggered by the PDL:
- One if the PDL detects that the software is not signed (refer to PDL user-guide), this message
can be ignored and has no effect on A/C software uploading.
- One if the PDL detects an incorrect or corrupted signature (refer to PDL user-guide), then the
software uploading will not be possible and another software has to be used.
For data security reasons, Airbus recommends that the user does a report of the fault to his
Aircraft Security Focal Point.
NOTE: The loading time for one full disk is ten minutes approximately.
NOTE: After the uploading operations, the operator must mandatorily do a check of the reference of the
data loaded in the ATSU, on the MCDU.
ACTION RESULT
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
· set the DATA LOADER/SEL A selector switch to
TO SEL B.
· set the DATA LOADER/SEL B selector switch to
ATSU1.
3.Upload the ATC application software (Refer to the
portable data-loader user-guide).
4.On the panel 265VU: On the EWD:
· set the two DATA LOADER selector switches to · the DATALINK ATSU FAULT warning comes into
OFF. view for one minute approximately.
ACTION RESULT
CAUTION: DURING THE UPLOADING OF THE ATC/AOC SOFTWARE INTO THE ATSU, MAKE SURE
THAT:
- MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT
POWER SUPPLY (GROUND POWER UNIT, APU, ...)
- MAINTENANCE PERSONNEL DO NOT TOUCH OR MOVE THE DATA LOADER
SELECTOR(S) AND THE MDDU.
IF YOU DO NOT OBEY THESE TWO PRECAUTIONS, THERE WILL BE ERASURE OF ALL
THE ATC/AOC SOFTWARE LOADED INTO THE ATSU. IT WILL THEN BE NECESSARY TO
START THE UPLOADING PROCEDURE OF ALL THE ATC/AOC SOFTWARE AGAIN.
NOTE: After the uploading operations, the operator must do a check of the reference of the data loaded
into the ATSU, on the MCDU.
NOTE: During the uploading of the FIN 24TX customized, if you disconnect the MDDU before the
TRANSF COMPLETE or TRANSF FAILED indication is shown:
- It will be necessary to upload again all the software loaded into the ATSU (this is not applicable
to FIN 20TX).
NOTE: If FIN 22TX and FIN 24TX were uploaded and if it is necessary to upload them again:
- It is necessary to upload all ATSU software from the 20TX.
ACTION RESULT
On the MDDU:
· The < < MDDU READY > > indication is shown.
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
ACTION RESULT
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.On the MDDU: On the MDDU:
· Put the disk into the disk drive, with the label in · The READY indication is shown.
the forward direction. · Then, the WAIT RESPONSE indication is shown
for a very short time.
· Then, the TRANSF IN PROG indication is shown.
** ON A/C
POST SB 45-4020 for A/C 163-163, 302-303
Subtask 46-21-00-970-069-C
CAUTION: DURING THE UPLOADING OF THE ATC/AOC SOFTWARE INTO THE ATSU, MAKE SURE
THAT:
- MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT
POWER SUPPLY (GROUND POWER UNIT, APU, ...)
NOTE: This procedure is used to upload software with the Portable Data Loader (PDL) (PMAT2000 KIT or
equivalent).
NOTE: If the PDL has the digital signature check, two messages can be triggered by the PDL:
- One if the PDL detects that the software is not signed (refer to PDL user-guide), this message
can be ignored and has no effect on A/C software uploading.
- One if the PDL detects an incorrect or corrupted signature (refer to PDL user-guide), then the
software uploading will not be possible and another software has to be used.
For data security reasons, Airbus recommends that the user does a report of the fault to his
Aircraft Security Focal Point.
Do the uploading of the AOC applications in this sequence to prevent the generation of BITE messages
(these applications are interactive):
· AOC SOFTWARE disk (22TX)
· AOC DATABASE SOFTWARE disk (24TX).
Set the two DLS switches to OFF between the uploading operations for each set of disks. Thus, the ATSU
does a Power on Self Test to validate each uploading and the application is operational.
NOTE: After the uploading operations, the operator must do a check of the reference of the data loaded
into the ATSU, on the MCDU.
NOTE: During the uploading of the FIN 24TX customized, if you disconnect the MDDU before the
TRANSF COMPLETE or TRANSF FAILED indication is shown:
- It will be necessary to upload again all the software loaded into the ATSU (this is not applicable
to FIN 20TX).
NOTE: If FIN 22TX and FIN 24TX were uploaded and if it is necessary to upload them again:
- It is necessary to upload all ATSU software from the 20TX.
ACTION RESULT
1.Use the disk(s) found in the disk storage box.
2.On the panel 265VU:
· Set the DATA LOADER/SEL A selector switch to
SEL B.
· Set the DATA LOADER/SEL B selector switch to
ATSU1.
3.Upload the AOC application software (Refer to the
portable data-loader user-guide).
4.On the panel 265VU: On the EWD:
· Set the two DATA LOADER selector switches to · The DATALINK ATSU FAULT warning comes into
OFF. view for one minute approximately.
ACTION RESULT
does a Power on Self Test. The DATALINK
ATSU FAULT warning comes into view dur-
ing the test.
NOTE: Approximately one minute is necessary for the ATSU software to become serviceable after the
loading procedure.
(1) Do the procedure to get access to the SYSTEM REPORT/TEST INFORMATION SYSTEM page
(Ref. AMM TASK 45-10-00-860-832) .
(2) On the MCDU, do a check of the software reference pre-loaded into the ATSU.
ACTION RESULT
1.On the MCDU: On the MCDU:
· Push the line key adjacent to the INFORMA- · The ATIMS menu page comes into view.
TION SYSTEM indication.
2.On the ATIMS page: On the MCDU:
· Push the line key adjacent to the LRU IDENT · The LRU IDENTIFICATION page comes into
indication. view.
3.On the LRU IDENTIFICATION page:
· Make sure that the P/N reference shown below
the related software indication
is the same as the reference read on the
disk(s) uploaded into the ATSU:
ATSU A/C INTERFACE for the ATSU A/C
INTERFACE software (disk 20TX)
ATSU CONFIG for the ATSU CONFIGURA-
TION software (disk 21TX)
ACTION RESULT
ATSU ROUTR PARAM for the ATSU
ROUTER PARAMETERS software (disk
30TX).
ACTION RESULT
1.On the MCDU: On the MCDU:
· push the line key adjacent to the INFORMA- · the ATIMS menu page comes into view.
TION SYSTEM indication.
2.On the ATIMS page: On the MCDU:
· push the line key adjacent to the LRU IDENT · the LRU IDENTIFICATION page comes into
indication. view
3.On the LRU IDENTIFICATION page:
· make sure that the P/N reference shown below
the related software indication
is the same as the reference read on the
disk(s) uploaded in the ATSU.
ATSU AHMI P/N for the ATC HMI UTILITIES
software (disk 25TX)
ATSU FANS A for the ATSU ATC FANS A
APPLICATIONS software (disk 35TX)
ATSU ARINC623 for the ATSU ATC ARINC
623 APPLICATIONS software (disk 23TX)
NOTE: It takes one minute approximately to the ATSU software to be operational after the loading proced-
ure.
ACTION RESULT
1.On the MCDU: On the MCDU:
· Push the MCDU MENU mode key. · The MCDU MENU page comes into view.
2.On the MCDU MENU page: On the MCDU:
· Push the line key adjacent to the ATSU indica- · The ATSU DATALINK page comes into view.
tion.
3.On the ATSU DATALINK page: On the MCDU:
· Push the line key adjacent to the AOC MENU in- · The AOC MENU page comes into view.
dication.
4.On the AOC MENU page: On the MCDU:
· Push the line key adjacent to the SYSTEM CON- · The MISC MENU page comes into view.
FIG indication.
On the MISC MENU page On the MCDU:
· Push the line key adjacent to SYSTEM CONFIG · The SYSTEM CONFIG page comes into view
indication. · Make sure that the AOC Software/Database P/
N reference shown is the same as the reference
read on the disk(s) of the AOC Software/Database
22TX/24TX.
** ON A/C
POST SB 45-4020 for A/C 155-155, 163-163, 301-303, 351-351
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the MAINTENANCE
MENU 1/2 page comes into view.
(2) Fully decrease the brightness of the MCDU screen (display off).
(3) Put the disk(s) in the disk storage box.
Subtask 46-21-00-862-051-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-801) .
End of document