Professional Documents
Culture Documents
A340 Check of the External Leakage of Hydraulic components
A340 Check of the External Leakage of Hydraulic components
A340 Check of the External Leakage of Hydraulic components
** ON A/C ALL
TASK 29-00-00-790-801-A
Check of the External Leakage of Hydraulic Components
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM. MOVEMENT
OF THE FLIGHT CONTROL SURFACES CAN BE DANGEROUS AND/OR CAUSE DAMAGE.
REFERENCE DESIGNATION
(Material No. 14SBA1) Textile-Lint free Cotton -
B. Referenced Information
REFERENCE DESIGNATION
(Ref. 12-32-28-281-813-A). Sample Fuel for Hydraulic-Oil Contamination Analysis
(Ref. 29-00-00-280-805-A). Check of the Green Hydraulic System after Operation of the Engine
Pumps in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-280-806-A). Check of the Green Hydraulic System after Operation of the Engine
Pumps in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-280-807-A). Check of the Blue Hydraulic System after Operation of the Engine
Pump in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-280-808-A). Check of the Blue Hydraulic System after Operation of the Engine
Pump in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-280-809-A). Check of the Yellow Hydraulic System after Operation of the Engine
Pump in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-280-810-A). Check of the Yellow Hydraulic System after Operation of the Engine
Pump in Possible Starvation or Cavitation condition.
(Ref. 29-00-00-863-801-A). Pressurize the Green Hydraulic System with the Ground Hydraulic
Supply
(Ref. 29-00-00-863-801-A-01). Pressurize the Green Hydraulic System with the Electric Pump
(Ref. 29-00-00-863-802-A). Pressurize the Blue Hydraulic System with the Ground Hydraulic Sup-
ply
(Ref. 29-00-00-863-802-A-01). Pressurize the Blue Hydraulic System with the Electric Pump
(Ref. 29-00-00-863-803-A). Pressurize the Yellow Hydraulic System with the Ground Hydraulic
Supply
(Ref. 29-00-00-863-803-A-01). Pressurize the Yellow Hydraulic System with the Electric Pump
(Ref. 29-00-00-864-801-A). Depressurize the Green Hydraulic System (Pressurized with the Hy-
draulic Ground Supply)
(Ref. 29-00-00-864-801-A-01). Depressurize the Green Hydraulic System (Pressurized with the Elec-
tric Pump)
REFERENCE DESIGNATION
(Ref. 29-00-00-864-802-A). Depressurize the Blue Hydraulic System (Pressurized with the Hy-
draulic Ground Supply)
(Ref. 29-00-00-864-802-A-01). Depressurize the Blue Hydraulic System (Pressurized with the Electric
Pump)
(Ref. 29-00-00-864-803-A). Depressurize the Yellow Hydraulic System (Pressurized with the Hy-
draulic Ground Supply)
(Ref. 29-00-00-864-803-A-01). Depressurize the Yellow Hydraulic System (Pressurized with the Elec-
tric Pump)
(Ref. 71-00-00-790-802-A). Fuel or Oil Leakage Limits for CFM56-5C (NON/P) engine
(Ref. 71-00-00-790-802-A-01). Fuel or Oil Leakage Limits for CFM56-5C/P engine
3. Job Set-up
Subtask 29-00-00-010-050-A
A. Get Access
(1) Get access to the applicable component.
(2) If the component has a seal drain connection, disconnect the pipe from it.
NOTE: The motors of the Trimmable Horizontal Stabilizer (THS) actuator have seal drain connec-
tions, but do not have related pipes.
Subtask 29-00-00-941-050-A
B. Put a Textile-Lint free Cotton - (Material No. 14SBA1) or absorbent paper under the component. Make
sure that the cloth or paper does not touch parts which turn or move.
4. Procedure
Subtask 29-00-00-280-092-A
A. If the inspection follows a total failure of hydraulic system (HYD-RSVR LO LVL warning) and the EDP(s)
which continues for more than 10 min, do the checks that follow:
· Check of the Green hydraulic system (Ref. AMM TASK 29-00-00-280-805) or
(Ref. AMM TASK 29-00-00-280-806) .
· Check of the Blue hydraulic system (Ref. AMM TASK 29-00-00-280-807) or
(Ref. AMM TASK 29-00-00-280-808) .
· Check of the Yellow hydraulic system (Ref. AMM TASK 29-00-00-280-809) or
(Ref. AMM TASK 29-00-00-280-810) .
Subtask 29-00-00-863-050-A
B. Pressurize the related hydraulic system:
· Pressurize the Green hydraulic system
(Ref. AMM TASK 29-00-00-863-801) .
· Pressurize the Blue hydraulic system
(Ref. AMM TASK 29-00-00-863-802) .
· Pressurize the Yellow hydraulic system
(Ref. AMM TASK 29-00-00-863-803) .
Subtask 29-00-00-790-050-A
C. Leak Test
NOTE: The total leakage in each of the three hydraulic systems must not be more than 100 drops/min.
NOTE: If one or more components have an external leak rate that is more than the normal operation limit,
you can dispatch the aircraft if:
- The leak rate of the component(s) is less than the dispatch limit.
- Only one hydraulic system has component(s) with a leak rate that is more than the normal oper-
ation limit.
- For a given hydraulic system, the leakage is less than the dispatch limit.
- The fluid level in the hydraulic reservoirs is correct.
It is necessary to do the above checks again before each flight.
NOTE: There are approximately 20 drops in 1 cubic centimeter and 75600 drops in 1 USgal (3.7854 l).
(1) Operate the component for the time or number of cycles necessary.
(2) Stop the operation of the component and compare the amount of leakage with the maximum
permitted values given in the table.
NOTE: 1: It is mandatory that no components or connections in the alternate brake system (such as
the safety valves, manifold, etc.) have leaks which are more than 2 drops per 10 minutes. The
total leak rate from all components and all connections, which are part of the alternate brake
system, must not be more than 10 drops per minute.
NOTE: 2: The limit of 2 drops in 10 min is for the time of pressurization and operation of the Cargo
Door.
NOTE: 3: Clean the area as required. Leakage is permitted only if not sufficient to result in a drop.
NOTE: 4: The removable pipe-to-pipe and pipe-to-fitting connections have a union with a 24 degree
cone and a sleeve that make a metal seal.
End of document