Columbian TecTank Solutions for

the Fire Protection Industry

For performance under fire,


call Columbian TecTank.
Unrivaled experience: With over 100 years of
history, Columbian TecTank is the firmly established
leader in bolted and factory-welded steel tanks and
silos. We have proven experience in designing solutions
that meet your requirements. We understand that
speed and reliability count. And you can count on
Columbian TecTank to deliver.

• 150,000 tanks delivered in 125 countries


around the world

• In-house experienced engineers

• Solutions designed to meet or exceed industry


standards such as NFPA and FM

• Project managers work with you and your team


from beginning to end to ensure our tank meets
your specifications, works in the integrated
system solution and is on time for installation

Highest quality: Our company brings a legacy


of time-proven storage tanks in the field. Our tanks
are completely coated inside and out with our
electrostatically-applied modified powder epoxy under
factory controlled conditions. The factory-applied
and thermally-cured coating process eliminates the
risks and costs of field applied coatings.

• We bring you the most specified bolted tanks in


the world, preferred for our custom-engineered,
third party certified, factory coated tank
storage systems that have performed virtually
maintenance free for decades

• Columbian TecTank offers a 15-year limited


internal coating warranty on fire protection
and potable water applications

• All products are manufactured in ISO 9001


certified facilities

Call (913) 621-3700 today to learn how you


can have the best value in fire protection.
www.columbiantectank.com
Proven Performance in
Tank Storage Solutions
Best value: Durable construction, superior coating and fast
in-field erection means Columbian TecTank tanks offer lower initial
and overall life cycle costs when compared to alternatives.

• Bolted tanks help you get the project open on time


by shipping and installing in a shorter time frame
When you need a partner
• Modular design allows fast and easy erection and a tank you can depend
• Fast erection reduces downtime of critical processes on—and you need it fast—call
• Tanks can be put into service in inclement weather Columbian TecTank.
due to the factory-applied coating

• Superior coating extends tank life and reduces life cycle For the best tank solution
maintenance costs for your fire protection needs
• Ability to disassemble and reassemble in the field enables call (913) 621-3700.
facility expansion

Columbian TecTank offers related services including


Insulation, Heaters and Foundation Design.

KANSAS CITY, KANSAS


5400 Kansas Avenue
Kansas City, KS 66106
Phone: (913) 621-3700
Proven Performance in
Fax: (913) 621-2145
www.columbiantectank.com
Tank Storage Solutions

The Exceptional Value of Experience


CFP0208
CISTERNA IISS - E-01
A. Description: Item 5(Configuration #: 20536-T4W2-4-3; Dated: 10/27/2023)
I. Tank Type: HydroTec CS
II. Tank is quoted to store: Potable Water
III. Specific Gravity: 1
IV. Stored Temperature: 100°F-37.78°C
V. Minimum Liquid pH: 6
VI. Maximum Liquid pH: 9
VII. Inside Diameter: 9.231FT (2814mm)
VIII. Height to eave of tank: 10FT (3048mm)
IX. Nominal Volume: 5006 Gallons - 19 Cubic Meters
X. Useable Capacity based on 1.42 FT - 433 mm of Freeboard: 4295 Gallons - 16 Cubic Meters
XI. Roof Type: Self supported 1:12 slope roof
XII. Floor Type: Flat Steel Bottom
XIII. (6) 3/4''-Epoxy-Set Style Anchor Bolts
XIV. Tank Usable Capacity is based on an assumption that bottom capacity level of zero and the maximum
water level and maximum operating level are equal. Maximum water level and maximum operating level
are taken as the tank height minus the specified freeboard. Bottom capacity level, maximum water level,
maximum operating level and freeboard are defined per AWWA D103.

B. Design:
I. Tank Designed in Accordance with: AWWA D103-97
II. Seismic Design: AWWA D103-97
III. Seismic Zone: 4
IV. S (Site Amplification Factor): 1.5
V. I (Use Factor): 1.25
VI. RW (Force Reduction Coefficient): 3.5
VII. Wind Design: AWWA D103-97
VIII. Wind Speed: 100 (MPH) - 161 (KPH)
IX. Roof Design: CTT Standard Design
X. Live Load (psf): 25
XI. Roof Design (Snow/Live) Load (psf): 25
XII. Internal Tank Design Pressure: 2Oz./Sq. In.
XIII. Internal Tank Design Vacuum: 0.5Oz./Sq. In.

C. Coating:
I. Coating: OptiBond™ Epoxy Coating Process
Electro-statically applied over a minimum SSPC-SP 10 near-white blast and thermally cured
II. Interior and both sides of bottom painted Trico Bond EP™ (7 mils average, DFT)
III. Exterior Primer: Trico Bond EP™ (3 mils average, DFT)
IV. Exterior Finish Coat: Performance Urethane (1.5 mils average, DFT)
V. Exterior Color: Will Advise

D. Hardware:
I. Galvanized bolts, nuts, and washers
II. Plastic encapsulated head bolts for interior vertical and roof seams
III. Encapsulated nuts for all floor seams

Page 8 of 15 CST Industries, Inc. Quote Number: QUO-20536-T4W2 Version: 1


E. Gasket / Sealer:
I. Manus Bond 75-AM Sealant
II. White EPDM Gasketing

F. Accessories:
I. 1 - Partial Deck Perimeter Guardrail (5' Each Side of Ladder)
II. 2 - 24" X 46" (610mm X 1168mm) Flush Cleanout w/ 2-Piece Cover
III. 1 - CST Storage Decal Installed on Top Ring
IV. 1 - Nameplate, Liquid Tank
V. 1 - 3" (80 mm) INLET - 150# Raised Face Slip On Single Flanged Nozzle - Inlet
VI. 1 - 4" (100 mm) 150# Raised Face Slip On Single Flanged Nozzle - Drain
VII. 1 - 4" (100 mm) Suction Nozzle with Elbow and Vortex Breaker - Suction
VIII. 1 - 4" (100 mm) Overflow w/ Internal Weir Cone and External Flanged Nozzle - Overflow
IX. Asphalt-Impregnated Fiberboard - Full Bottom Area
XI. 1 - 24" (610mm) Square Roof Manway With Hinged Cover
XII. 4 mil Polyethylene
XIII. Electronic Tank Calculations (Approvals and Finals)

Page 9 of 15 CST Industries, Inc. Quote Number: QUO-20536-T4W2 Version: 1


Proven Engineering
Capabilities and
Design Standards

A Storage Legacy Exceptional design capabilities have given CST a reputation as the most innovative storage
manufacturer in the world. With our proven engineering capabilities and design standards, CST offers
Peabody TecTank unrivaled expertise as the world’s first manufacturer of bolted liquid and dry bulk storage tanks and silos to:
The business roots for CST Industries run deep –
Receive API-12B Monogram (Parsons, KS Facility - License No. 12B-0004)
all the way back to 1893 following our heritage as ®
Design FM Approved and composite elevated bolted tanks
Columbian Steel Tank Company TM, Peabody TecTank Provide a proof load tested jacking system designed by licensed engineers to ensure construction safety
Apply bolted technology to large scale quick assembly frac water tanks
and Columbian TecTank®. Apply bolted tanks to SAGD oil field applications
Apply bolted tanks to slurry applications
CST introduced the first bolted steel storage tanks for the petroleum industry and Design and build the world’s largest externally supported bolted pressurized roof at 137 ft. (42 m)
initiated the widely utilized API-12B standard implemented in 1929. The API-12B Apply build gaskets to bolted tanks
standard is still featured in CST’s TecTank™ storage systems today. Suspended aluminum decks for cryogenic service per API 620 and EN 14620

In the 1940s, CST initiated jacking tanks on grain bins and silos for the
With a legacy of 125 years and over 350,000 field proven storage tank installations
agriculture market. Additionally, CST has designed silos with drive-
in more than 125 countries, no other company can match CST’s world-renowned
through skirts for railcar loadout and tanks with unique hoppers. We
brands, premium engineered designs, world-class manufacturing
have even designed tanks with office space under the hopper bottom.
or construction experience. CST is the world’s leading and largest dome manufacturer and has
installed the longest clear-span aluminum truss in the world at 291 ft.
(89 m) long and the largest clear-span aluminum dome in the world at 443 ft. (135 m) diameter. CST has installed over
18,000 aluminum covers worldwide. The company developed the center tower erection methodology for safe, efficient
Highest Quality – Promised and Delivered – assembly and lifting of large domes.

in Tanks for Liquid Applications Our integrated project team works with you to ensure your tank is designed to yield the best lifelong value for your
application. Factors such as capacity, seismic conditions, specific gravity and wind loading vary widely from one
Our commitment to performance is delivered through time-proven design and application to the next. The draftsmen and licensed professional engineers in our Engineering and Design Department
engineering, our precision manufacturing technologies, and our commitment give individual consideration to every tank and silo. With our staff and consultants, drawings can be supplied with the PE
to excellence in installation. All CST operations are ISO 9001:2015 Certified. seal from any state, territory or province. CST offers more FM pre-approved models than any other storage provider.

CST is an expert and committee participant in the following committees:

AWWA D103 API-650 NFPA 68 Aluminum Association


AWWA D108 ASME NFPA 69 Engineering and Design Task Force
API-12B EN (Eurocode) ASME SBS
CST OptiBond
Epoxy Coating Process
Trust the Coating and s a u t h orized
nd it
Manufacturing Experts “CST a u il t t h ousands
have b y
dealers n a lm ost ever
Maximum Performance. s i
World-Class Coating of tank p os sible ”.
Lasting Protection. ion
Trico Bond EP® – Proven, industrial grade high performance, factory-applied epoxy situat
Trico Bond SDTM – A proven enhanced performance epoxy that provides additional
CST created its first-rate epoxy coating protection and longer life for Severe Duty applications
technology to provide excellent adhesion, CST OptiBond proprietary coating process utilized on every sheet
maximum corrosion resistance and long tank life. Factory coated ensures best quality
Decades of experience have led to continuous Third party tested and verified

technology and process improvements which have Tank Construction


resulted in the finest epoxy coating available in
Every CST tank is factory engineered to customer specifications. Since all tank panels are manufactured in the factory and easily
the storage tank industry. The OptiBond™ Epoxy assembled, CST’s tanks can be installed in many types of situations where field welded steel and concrete applications cannot.
Coating Process is derived from years of in-field CST and its authorized dealer network have dedicated factory-trained crews who are experts in bolted panel construction.
experience and performance data. A quality tank is not only coated sheets of steel, it is also the expertise applied during construction and the service that follows.

ISO quality system certified by third party registrar


Benefits of Factory-Applied Coatings Bolted tanks can be constructed up to three times faster than field welded designs
Versatility for in-field modification and expansion
Eliminates the weather factors incurred when applying a Factory-applied proprietary powder coating lasts longer reducing maintenance costs
coating in the field after constructing a welded tank. With Easily constructed in remote locations
factory-applied coatings, there is no waiting for the weather No on-site welding required during construction
to be within specific parameters in order to apply the Reduced need for heavy equipment on construction site
coatings and trust in the environmental conditions to 1/2 the building crew of traditional field welded tanks
properly cure the coating.
Minimum lay down area required
Each step in our factory-applied coating process can be
Tank Design Options
carefully monitored so that inconsistencies in the coating
can be detected in the earliest possible stage of the
process prior to tank construction. Flat Panel Bolted:
• Fastest construction for tanks greater than 24 ft. (7 m) tall
Completion of the tank can be performed in as little as 1/3 • Leading design for bolted steel tanks around the world
• Mastic joints
the time as alternative materials and methods. On-site
• Manufactured, erected and in operation up to three times faster than field welded or
Color
delays due to weather are greatly eliminated, service can
concrete applications
erior
Ext ions
commence earlier and ROI begins sooner. Largest capacity, capable of storing up to 6,000,000 gal. (22,712m3) or more

Opt Chime Panel Bolted:
• Fastest construction time for tanks 24 ft. (7 m) or less in height
• Best choice for oil field service and industrial applications
• API-12B monogram available
• Gasketed joints allow for a broad application range
• Features factory formed flanges at horizontal seams for added structural strength
• Special gaskets and sealants allow for a broader range of applications
Tan Gray Green Blue White Forest Green Cobalt Blue Factory Welded Design:
• Shortest install time
Available in sizes 6 ft. (2 m) to 15 ft. (5 m) in diameter and up to 85 ft. (26 m) tall
our Trico Bond SD™
TecTank epoxy coatings are available in seven •
abou t upgrad ing to • Taller units available in multi-piece designs
standard exterior colors. Inquire for custom colors. Ask the
atin g or go online to download a copy of • Shipped as one unit or multi-piece units
co Report.
Coatings Competitive
• Can be specified with internal and/or external factory coating
• Arrives on-site fully assembled and ready to stand
Tank Comparison Chart
DESIGN FEATURES TECTANK FLAT PANEL TECTANK CHIME PANEL TECTANK WELDED
Panel design not applicable. Full welded construction,
Chime panel 56 in. (142 cm) to 58 in. (147 cm) wide
Flat Panel 105 in. (267 cm) wide by 55 in. (140 cm) tall from 6 ft. (2 m) to 15 ft. (5 m) in diameter and 85 ft. (26 m) in a
PANEL DESIGN by 96 in. (244 cm) tall with 2 in. (5 cm) external top
premium grade cold rolled steel, convex-shaped/cut tapered panel. single piece. Larger heights available with splice. 15 ft. (5 m)
and bottom flange, each ring as a stiffener.
by 185 ft. (56 m) largest-to-date.

Seam between panels not applicable. Robotic, sub-arch


Compression seal formed between chimes with EPDM/
SEAM BETWEEN PANELS Mastic joints welds produce exceptionally consistent “smooth/not flush”
NBR/Viton gasket depending on the application.
horizontal seams.

Trico Bond EP® – 5 mil (130 μm) to 9 mil (225 μm)


Trico Bond EP® – 5 mil (130 μm) to 9 mil (225 μm) average
average dry film thickness precision-applied powder Panel coating not applicable. Interior coated pieces
dry film thickness precision-applied powder coating.
PANEL COATING INTERIOR coating. Trico Bond SD™ – 4 mil (100 μm) to 10 mil have 2.5 mil (60μm) to 5 mil (130 μm) standard epoxy
Trico Bond SD™ – 4 mil (100 μm) to 10 mil (250 μm) average
(250 μm) average dry film thickness precision-applied coating. (Special coatings available)
dry film thickness precision-applied powder coating.
powder coating.

Trico Bond EP® precision-applied powder coating with high Trico Bond EP®, precision-applied powder coating with high Panel coating not applicable. Exterior coated pieces are
performance urethane topcoat for additional protection and UV performance urethane topcoat for additional protection and 2 mil (50 μm) to 3 mil (75 μm) standard epoxy coating.
PANEL COATING EXTERIOR resistance at 3.5 mil (85 μm) to 5 mil (130 μm) average dry film UV resistance at 3.5 mil (85 μm) to 5 mil (130 μm) average 1.5 mil (35 μm) to 3 mil (75 μm) high performance urethane
thickness. (Unlimited topcoat color options) dry film thickness. (Unlimited topcoat color options) for additional protection and UV resistance.

Trico Bond EP® up to 140° F (60° C) Trico Bond EP® up to 140° F (60° C)
OPERATING TEMPERATURES Trico Bond SD™ up to 200° F (93° C) Trico Bond SD™ up to 200° F (93° C) Standard coating up to 140° F (60° C)
NSF 61 Approved NSF 61 Approved

18,000 lb (8164.66 kg) hydraulic actuated, synchronized jack Delivered in one piece on specialized equipment, ready for
Third party safety PE stamped scaffold system. Fastest
FIELD INSTALLATION system third party proof load tested and PE stamped. Fastest lift and place on prepared foundation (by others).
bolted installation for tanks 24 ft. (7 m) tall or less.
bolted installation for tanks greater than 24 ft. (7 m). Fastest installation.

Tanks can be modified – contact your local sales


MODULARITY representatve for more information.

Normally scheduled PM inspections by site maintenance


MAINTENANCE group or CST provided maintenance.

Professional Engineers on staff that are capable of stamping


LICENSED PROFESSIONAL in all states, territories and provinces. Includes voting member
ENGINEERING STAFF of NFPA 22. Committee chair for AWWA, API, NFPA and EN
(Eurocode). Assisted with API-12B and other AWWA standards.

AGE OF COMPANY & “YEARS Established in 1893. More tank and employee experience
OF EXPERIENCE” than the next two competitors combined.

CST employed or exclusive subcontract crews using third CST employed or exclusive subcontract crews using
Typically by others - Ask your CST Manufacturers’
FIELD CONSTRUCTION party safety certified & PE stamped scaffold design. third party safety certified & PE stamped scaffold design.
Representative for recommendations.
*Most experienced crews. *Most experienced crews.

Up to 1/2 in. (1 cm) thick. Available in carbon steel, aluminum Up to 5/16 in. (0.8 cm) thick. Available in carbon steel, Up to 1/2 in. (1 cm) thick. Available in carbon steel,
PLATE THICKNESS
and 304/316 grades of stainless steel. aluminum and 304/316 grades of stainless steel. aluminum and 304/316 grades of stainless steel.
World-Renowned TecTank ®

Storage Tank Systems


Factory Welded Tank Systems
The design, manufacture and erection to conform to API-12B, AWWA D103, Eurocode, FM and NFPA
TecTank Factory Welded tanks are designed and manufactured
22 requirements. And because of our unmatched operations,
of TecTank guarantees our customers a to meet your specific material and coating needs.
tanks for special conditions such as heavy liquids, high wind
worry-free, hands-off installation of a long- factors, snow, or seismic loading can be designed with ease for
lasting, high-quality liquid storage tank. CST’s welded tanks are fabricated from epoxy factory coated steel,
maximum efficiency. The TecTank designs provide economy in
aluminum, stainless or black steel at our ISO Certified manufacturing
freight and materials handling and allows our tanks to be built
facility. Tanks can be designed to meet UL-142 standards.
TecTank’s design concept has been proven consistently nearly anywhere including very remote locations or even inside
as the premier choice for liquid storage. TecTank’s wide buildings. Known for over 125 years, CST’s quality shines through
range of sizes and configurations guarantee the right size from design to manufacture to erection. For any application, our
is available for you. By meeting or exceeding industry TecTank storage systems offer performance that is unsurpassed
standards, TecTank bolted designs can be engineered in quality and lifetime cost.

Flat Panel Tank Systems Flat panel tanks are typically assembled from the top down
by using a hydraulic actuated, synchronized jacking system
TecTank Flat Panel was engineered and developed for that is third party proof load tested and PE stamped.
higher volume needs. The flat panel design offers a These tanks are most often built by factory-trained building
significant increase in liquid storage capacity. crews who specialize in jacking system construction.
Like CST’s chime panel design, CST’s flat panel liquid storage
First ring of panels and roof are safely
tanks may be used in high-volume industrial, commercial,
constructed at ground level
institutional, and private applications to store water,
wastewater and many other liquid materials. The flat panel Tank is jacked up and successive
is a jack-built design that can accommodate capacities over rings are constructed
6,000,000 gal. (22,712m3).
The final ring is constructed and tank
CST flat panel tanks are processed with the OptiBond is lowered onto foundation ring
coating process featuring the Trico Bond EP or SD epoxy
powder, offering the best in corrosion resistance.

Chime panel tank assembly typically involves


Chime Panel Tank Systems scaffolding methods. Special scaffolding mounts
and assembly ladders increase construction
TecTank Chime Panel tanks offer the best solution for
efficiencies and safety.
petroleum and industrial applications.

CST’s chime panel tanks and silos are field constructed First ring of panels is constructed
by CST crews utilizing our third party safety certified directly on the foundation
& PE stamped scaffold design. TecTank Chime Panel
bolted storage tanks are: Successive rings are constructed in
place on lower rings

er or
Features factory formed flanges at horizontal seams Roof or cover can be built in place or
wat
aste e’ve
for added panel rigidity on the ground and placed by crane
er, w
Gasketed joints allow for a broad application range
it ’s wat liquids, w
If strial vered!
API-12B monogram available
in du co
got it
Storage Tank Options

Tank Applications
CST can design and build storage tanks with all the options and accessories to match specifications.
Our diverse experience in building all types of tanks for different applications helps us devise practical
solutions to meet operational requirements. Ordering a tank with additional integrated accessories
and services drastically reduces time and expense. This allows customer management to focus on
CST’s TecTank product line delivers high-quality and durability more important aspects of the project.
at the best value per gallon, making TecTank tank systems
the best choice for liquid storage applications. Foundation and Floor Designs
Foundation designs are done in-house and are customized to customer needs and storage application.
Water CST understands that different storage applications require different foundation and floor options. That is
why CST offers choices for the customer depending on their needs. Customers can select floors from
Potable Water Fire Protection Salt Water Coated Steel (Vitrium™ Glass or OptiBond™ Epoxy), or sealed and unsealed reinforced concrete.
Raw Water Storage Distilled Water Brines Water
Irrigation Water Deionized Water Brackish Water
Disinfection Demineralized Water Desalinization

Wastewater
Landfill Leachate Anaerobic & Aerobic Digestion Primary & Secondary Containment
Storm Water Run-off Sludge Storage Sedimentation
Flocculation Disinfection Aeration
Trickling Filters Flow Equalization Biological Oxidation Embedded Starter Modified Starter Anchored to Slab Foundation
Used for larger municipal and Combines Embedded Starter Tanks are anchored to slab with
industrial applications and higher for large tank and higher anchor bolts around perimeter
Industrial Liquids and Chemicals
seismic applications seismic features
Fertilizer Lime & Carbonate Slurry Mining Fluids & Slurry
Insecticides Secondary Containment De-Icer
Food Waste Edible Oils Dyes & Pigments
Food Additives Paints & Primers Pulp & Paper Processing
Glycols Detergents

Capacity Specifications:

Standard diameters: Standard designs: Standard tank capacities range:


Grade Band Curb Mount Coated Steel Floors
from 9 ft. (3 m) to 243 ft. (74 m) AWWA D103-09, ASCE-7, ANSI, from 4,000 gal. (15m3) to 6,000,000
Steel grade bands filled with crush Used for lower profile tanks, Glass-fused-to-steel and epoxy
AISC, API, IBC, ISO 28765, NFPA gal. (22,712m3) rock or other compacted fill provide well suited for tower mounted coated panels are bolted and sealed
Standard 22, NSF, Eurocode and FM base for tank installation storage tanks to cover floor surface

Accessories
Petrochemical

Crude Oil Bitumen Kerosene


Drilling Fluids & Muds Production Water Brine
Diesel Fuel Lubricants Fuel Oils
Asphalt Wastewater
Frac Water & Flow Back Jet Fuel

Capacity Specifications: • Baffles • Level Indicators • Roof Hatches


• Cages • Mixer Supports • Sidewall Manways
Standard diameters: Standard designs: Standard tank capacities range: • Gravity Vents • Nozzles • Spiral Staircases
Chime – 12 ft. (4 m) to 200 ft. (61 m) API-12B Monogram & Principles 100 bbls (16m3) to 57,000 bbls (9,062m3) • Launders • Platforms • Walkways
Welded – 6 ft. (2 m) to 15 ft. (5 m) AWWA D103 90 bbls (14m3) to 750 bbls (119m3) • Railings • Ladders & Safety Cages
Flat Panel – 9 ft. (3 m) to 243 ft. (74 m) 5,000 gal. (19m3) to 6,000,000 gal.
(22,712m3) (fresh water only)
Worldwide Availability

CST offers a variety of repairs, modification and turnkey services


for liquid, dry bulk, and welded storage tanks. CST services also
include ROV Water Inspection and Visual & Ultrasonic Testing.

Alfreton, England

Kansas City, MO DeKalb, IL


Gardena, CA Tokyo, Japan
Parsons, KS Winchester, TN
Conroe, TX Dubai
United Arab Emirates Mumbai, India
Monterrey, Mexico
Ho Chi Minh City, Vietnam
Panama City, Panama Singapore, Singapore

Sao Paulo, Brazil Sunshine Coast,


Australia
Buenos Aires, Argentina

Manufacturing facilities and technical design centers Regional Sales Offices

Certifications and Capabilities:

• ISO 9001:2015 • FM Certified Product Line (Parsons, KS & DeKalb, IL Facilities)


• API ISO/TS 29001:2007 • All Facilities EPA Compliant
• API-12B (Parsons, KS Facility - License No. 12B-0004) • NFPA 22
• UL 142 & ULC S601 • FM Approved
• AWWA D103 • NSF 61 Approved
• Certified Welding Inspectors (CWI)

CST is committed to providing its customers with the highest engineered quality, best
service, longest product life and greatest value for every storage solution we supply.
Contact CST for all your liquid storage needs.

For more information, call +1 844-44-TANKS or visit us online at cstindustries.com

CST Industries, Inc. | 903 E. 104th Street, Suite 900 | Kansas City, MO 64131 USA | Ph: +1 844-44-TANKS | Fax: +1 913-621-2145
© 2019 CST Industries, Inc. Columbian TecTank and Trico Bond EP are registered trademarks of CST Industries, Inc.
TecTank, Columbian Steel Tank Company, Peabody TecTank, OptiBond, Trico Bond SD and Vitrium are trademarks of CST Industries, Inc. TTL-BR-1901

You might also like