opol_BOQ

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 41

JMT CONSTRUCTION & ENGINEERING SERVICES

MOHON TAGOLOAN MISAMIS AORIENAL


Email: zydanjass@gmail.com
Tel: 088-8552100/09952383556/09201866182

BILL OF MATERIALS AND COST ESTIMATES SUMMARY

DATE : July 8, 2024


PROJECT : Prposed 1 Storey 2 bedroom resthouse
LOCATION : Opol MisamisOriental

OWNER : o

ITEM NO. DESCRIPTION TOTAL


1 MOBILIZATION AND DEMOBILIZATION 20,300.00
3 GENERAL REQUIREMENTS 35,000.00
4 EARTHWORK 12,600.00
5 CONCRETE 96,200.00
6 MASONRY 84,200.00
7 REINFORSMENT & METALS WORKS 84,100.00
8 FORMWORKS 65,489.00
9 ROOFING 86,430.00

10 CARPENTRY 93,560.00

11 INSULATION 15,600.00
12 DOORS AND WINDOWS 86,287.00
13 FINISHES 95,300.00
PAINTING 64,000.00
(Note: Septic Vault Works are already
14 PLUMBING 54,290.00
included)

15 ELECTRICAL 67,300.00
TOTAL BUILDING MATERIAL COST: 960,656.00
LABOR (installation of trusses are included on materials) 36% 345,836.16
CONTINGENCIES/CONTRACTORS PROFIT 5% 48,032.80
TOTAL PROJECT COST 1,354,524.96

NOTE:
1. The above breakdown costing includes labor/equipment and mark-ups (overheads and contingencies).
also include proccessing of Plans/As-Built Plans/Government Permits (Bldg Permit,

2. The above unit prices shall be applied for any change orders that may be authorized by the owner.

PREPARED BY: JASON TIBON


PRC NO: PTR NO:
DATE ISSUED: PLACE ISSUED

APPROVED BY:

OWNER ARCHITECT

SHOULD YOU HAVE ANY QUESTIONS REGARDING THIS QUOTE OR IF YOU NEED ANY ADDITIONAL INFORMATION,
PLEASE FEEL FREE TO REACH ABOVE MENTIONED CONTACTS.

COST ESTIMATES SUMMARY Page 1


Thank You For Your Business!

COST ESTIMATES SUMMARY Page 1


BILL OF QUANTITIES AND COST ESTIMATES

PROJECT: PROPOSED 2 STOREY RESIDENTIAL BUILDING


LOCATION: BLOOCK 13 LOT 8 WEST WOOD CANITOAN CDO
OWNER: MRS. KATE NELASCO

SUBJECT: COST ESTIMATES FOR THE CONSTRUCTION OF TWO-STOREY RESIDENTIAL BUILDING

ITEM NO. DESCRIPTION QTY UNIT U/C NOTES TOTAL


0.3% of civil
1 MOBILIZATION AND DEMOBILIZATION 1.00 lot Php 40,124.76
works

3 GENERAL REQUIREMENTS

Plans/As-Built Plans/Government Permits 1.00 Php 75,000.00


(Bldg Permit, FSIC, Occupancy Permit) lot 75,000.00
Temporary Facilities
Warehouse/Bunkhouse 1.00 lot- 25,000.00 Php 25,000.00
Utilities
Temporary power and water supply 2.00 lot 8,500.00 Php 17,000.00
4 EARTHWORK

1.00 lot 25,000.00 25,000.00


Site Preparation (Clearing and Grubbing) Equip't.
Building Layout and Staking 1.00 lot 8,500.00 8,500.00
Excavation 32.00 cu 750.00 24,000.00
Backfilling, Spreading and Compaction 74.80 cu 350.00 26,180.00
Gravel Bedding 1.00 -
Gravel 12.00 cu.m. 1,260.00 15,120.00
Soil Poisoning 6.00 liters 560.00 3,360.00

109.00 lengths 55.00 5,995.00


TEMPORARY FINCE
5 CONCRETE
Cement 176.00 bags 250.00 44,000.00
Sand 9.80 m3 1,260.00 12,348.00
Gravel 19.50 m3 1,260.00 24,570.00
6 MASONRY
CHB 4" 8988.00 pcs 12.00 107,856.00
Cement 834.00 bags 250.00 208,500.00
Screened Sand 57.50 m3 1,260.00 72,450.00
7 REINFORSMENT & METALS WORKS
16mm Reinforcing Bars 571.00 lengths 360.00 205,560.00
12mm Reinforcing Bars 1174.00 lengths 212.00 248,888.00
10mm Reinforcing Bars 723.80 lengths 145.00 104,951.00
#16 Tie Wire 338.10 kgs 55.00 18,595.50
Metal Railings for Staircase 5.00 pcs 1,500.00 7,500.00
steel decking 146.00 sqm 941.00 137,386.00
Steel Gate Fences 16.40 sqm 3,659.00 60,007.60
Metal Railings on Terrace 22.00 lengths 715.00 15,730.00
8 FORMWORKS
2 X 2 X 8 LUMBER 206.00 pcs 94.00 4 uses 19,364.00
2 X 3 X 8 LUMBER 0.00 pcs 120.00 4 uses -
2 X 4 X 8 LUMBER 0.00 pcs 140.00 4 uses -
Phenolic Board 1/2" x 4'x 8' 21.00 pcs 1,250.00 3 uses 26,250.00
#2 1/2 CWNails 45.00 kgs 60.00 2,700.00
#1 Finishing Nails 2.00 kgs 55.00 110.00
#4 CWNails 89.00 kgs 60.00 5,340.00
9 STAIRS
Cement 24.00 bags 240.00 PHP 5,760.00

3/41
BILL OF QUANTITIES AND COST ESTIMATES

Screened Sand 1.30 m3 1,260.00 PHP 1,638.00


Gravel 2.60 m3 1,260.00 3,276.00
16mm Reinforcing Bars 5.00 lengths 360.00 1,800.00
12mm Reinforcing Bars 8.00 lengths 196.00 1,568.00
10mm Reinforcing Bars 9.00 lengths 136.00 1,224.00
#16 Tie Wire 2.00 kgs 60.00 120.00
10 CARPENTRY
12mm. thk. Laminated Compact for
35.00 ln.m 1,860.00 65,100.00
kitchen cabinet and closet

Consumables(10%of material cost) 6,510.00


11 THERMAL AND MOISTURE PROTECTION( water proffing)
FIRE WALL water proofing 54.00 m2 350.00 18,900.00

95.00 m2 450.00 42,750.00


ROOF DECK and gutter water proofing
T&B water proofing membrane 26.00 m2 450.00 11,700.00

consumable 54.00 m 2
42.00 2,268.00

12 OPENINGS
Doors

D-01 .90 x 2.10mm,main DOOR IN DARK WENGE 1.00 pcs 8,500.00 8,500.00
VENEER FINISH WITH PULL HANDLE AND
KEY LOCK

D-02 2.00 pc 7,500.00 15,000.00


.80 x 2.10mm FLUSH DOOR with grooves in
white satinpaint finish with lever handle
0.70 x 2.10mm, Flush door with white
D-03 4.00 pcs 7,500.00 30,000.00
satin finish wth lock and handle

0.60x 2.10mm Single Leaf Swing, pvc flush


D-04 3.00 pc 4,800.00 14,400.00
door with lovers (see Door Schedule)

0.8x 2.10mm Barn door in white satin


D-05 1.00 pcs 8,500.00 8,500.00
finish complet with accessories

.80 x 2.10mm flush door with white satin


D-06 finish with lock and handle (see Door 2.00 pc 8,500.00 17,000.00
Schedule)

2000 x 2200 sliding glass door with fixed


D-07 window in inodize aluminum frame indark 2.00 set 12,500.00 25,000.00
gray fin

1799x 2850 sliding glass door with fixed


D-08 window in inodize aluminum frame indark 1.00 set 15,780.00 15,780.00
gray fin

200x 3000 sliding glass door with fixed


D-09 window in inodize aluminum frame indark 3.00 set 18,542.00 55,626.00
gray fin

3600x 3000 sliding glass door with fixed


D-09 window in inodize aluminum frame indark 1.00 set 45,000.00 45,000.00
gray fin

Windows

4/41
BILL OF QUANTITIES AND COST ESTIMATES

W1 1.00 set 94,234.00 94,234.00


Fixed window in anodized aluminum
window frame dark gray fin

W2 1.00 set 75,000.00 75,000.00


Fixed window in anodized aluminum
window frame dark gray fin

w3 60x60 awning aluminum window with 5.00 set 3,460.00 17,300.00


inodsized aluminum frame

W4 Casement window in anodized aluminum 1.00 set 6,500.00 6,500.00


window frame dark gray fin

W4 awning window in anodized aluminum 2.00 set 12,650.00 25,300.00


window frame dark gray fin

13 FINISHES
Tiles

600x1200 mm STATUARIO MARBLE effect 117.00 pcs 750.00 87,750.00


(For Interiors)

600x600mm Honed Gray Homogeneous 108.00 pcs 280.00 30,240.00


Floor Tile

300x600mm Honed Homogeneous Floor 125.00 pcs 180.00 22,500.00


Tile

1200x200mm Non Slip Homogeneous Floor 80.00 box 1,200.00 96,000.00


Tile wood design
200x200mm homogeeous tile 125.00 pcs 43.00 5,375.00

300 x 600 mm homogeneous wall tile 808.00 PCS 180.00 145,440.00

PAVERS 438.00 PCS 25.00 10,950.00


Pebbles Finish 10.00 sqm 800.00 8,000.00
wood plank stair 18.00 pcs 850.00 15,300.00
Stone Tike Cladding 18.00 sqm 1,596.00 28,728.00
Cement Mortar 65.00 bags 250.00 16,250.00
White Cement 17.00 bags 470.00 7,990.00
Cement based Waterproofing 21.00 kgs 550.00 11,550.00
Tile Adhesive 25.00 bags 1,200.00 30,000.00

6.00 lm 4,600.00 27,600.00


R.C.Counter with Polished Pure/Natural
Granite Slab Counter Top Finish
Painting
Painting on Exterior Walls
PUTTY (SKIM COAT) 43.00 bags 500.00 21,500.00
THINNER FOR PUTTY 0.00 L - -
CONCRETE NEUTRALIZER 3.00 gal 540.00 1,620.00
PRIMER/SEALER 27.00 gal 650.00 17,550.00
TOPCOATS 27.00 gal 750.00 semi-gloss 20,250.00
Consumables(5%of material cost) 3,046.00
Painting on Interior Walls
ELASTOMERIC PUTTY (FULL) 17.00 bags 500.00 8,500.00
THINNER FOR PUTTY 0.00 L - -
CONCRETE NEUTRALIZER 0.00 gal 422.00 -
PRIMER/SEALER 24.00 gal 650.00 15,600.00
TOPCOATS 24.00 gal 750.00 Flatwall 18,000.00
Consumables(5%of material cost) 2,105.00

5/41
BILL OF QUANTITIES AND COST ESTIMATES

Painting on Ceiling
PUTTY 12.00 gal 550.00 6,600.00
PAINT THINNER 1.00 L 145.00 145.00
PRIMER/SEALER 6.00 gal 650.00 3,900.00
TOPCOAT (Flatwall l) 12.00 gal 750.00 9,000.00
Consumables(5%of material cost) 983.00
Concrete Stamping on Brick Pattern
Wet-look Sealer 1.00 gal 3,000.00 3,000.00
Consumables(5%of material cost) 150.00

( DOORS / JAMBS / STEEL GRILLS & RAILINGS) 6.00 27,600.00


natural and varnish paint finishes lot 4,600.00

Ceiling and wall carpentry

4.50mm thk. x 4' x 8' Fiber Cement Board


(HARDIFLEX BRAND) 121.00 sheet/s 485.00 58,685.00
Metal Furring 117.00 pcs 120.00 14,040.00
Carrying Channel 61.00 pcs 150.00 9,150.00
Hanger Bars / Rod 210.00 pcs 100.00 21,000.00
Channel Clip 407.00 pcs 35.00 14,245.00
Corner Bid 185.00 pcs 80.00 14,800.00
Rivets 304.00 pcs 7.00 2,128.00
PVC wood cladding 60.00 pcs 185.00 11,100.00
14 PLUMBING
Septic Tank, Catch Basin, Rainwater Collector Tank
CHB 4" 650.00 pcs 12.00 7,800.00
CEMENT 40.00 bags 250.00 10,000.00
SAND 6.00 cu.m 1,260.00 7,560.00
GRAVEL 8.00 cu.m 1,260.00 10,080.00
10mm REINFORCING BARS 34.00 lengths 145.00 4,930.00
NO. 16 TIE WIRE 6.40 kgs 65.00 416.00
Waterproofing Cement 10.00 bags 400.00 4,000.00
Sewer and Drainage Line 1.00 lot 8,500.00 8,500.00
Water Line (PPR) 1.00 lot 12,890.00 12,890.00
Fixtures and Accessories

4.00 set/s 12,500.00 50,000.00


Water Closet 2nd floor and ground T&B
Water Closetmaids room 1.00 set/s 6,500.00 6,500.00
Floor Drain Strainer 15.00 pcs 300.00 4,500.00
Lavatory 5.00 set/s 4,500.00 22,500.00

3.00 pcs 250.00 750.00


Stainless steel Mesh Screen Protection
Kitchen sink w/Faucet 2.00 set/s 7,500.00 15,000.00
shower set 4.00 set/s 3,500.00 14,000.00
water tank 1.00 set/s 28,500.00 28,500.00
Gate Valve 2.00 pc/s 400.00 800.00
15 ELECTRICAL
Electrical Rough-in (Fittings, Wires/Cables,
Panelboard, Breakers , electricalm pipe and 1.00 lot 75,430.00 75,430.00
hoses etc.)
Switches and Convenience Outlets

Convinience Outlet Grounding 35.00 pcs 450.00 15,750.00


Type15Amps,250V
Air conditioning Outet w/Breaker
6.00 pcs 500.00 3,000.00
combination

6/41
BILL OF QUANTITIES AND COST ESTIMATES

30Amps,250V Grounding Type 1.00 pc

Single Wall Switch in one Switch plate 11.00 pcs 250.00 2,750.00
15Amp,250V

Two Single Wall Switch in one switch plate 10.00 pcs 250.00 2,500.00
15Amp,250V
Three Way Switch plate 15Amp,250V 2.00 pcs 340.00 680.00
Electrical Tape 8.00 pcs 120.00 960.00
Lighting fixtures and Lamps
5w LED pinlight (Daylight) 74.00 set/s 400.00 29,600.00
12W LED Downlight 4.00 set/s 1,200.00 4,800.00
track light 2.00 set/s 4,500.00 9,000.00
10W LED chandelier Downlight 1.00 set/s 15,800.00 15,800.00
16 FIRE PROTECTION
Fire Extiguisher 3.00 pcs 4,500.00 13,500.00
smoke detector 6.00 pcs 1,500.00 9,000.00
Emergency Light 3.00 pcs 2,500.00 7,500.00

TOTAL PHP 3,467,005.86

TOTAL BUILDING MATERIAL COST: PHP 3,467,005.86


LABOR PHP 1,386,802.35
(OCM) Overhead Contigency Miscellaneous/ contractos Profit PHP 277,360.47
TOTAL PROJECT COST PHP 5,131,168.68

7/41
NOTES
Mobilization and Demobilization
0.50% of Civil Works

Temporary Facilities

fill out data


constant
linked data
BILL OF MATERIALS COMPUTATIONS

CONCRETING WORKS COMPUTATIONS

FOOTING
Length L(m) 1.00 m
Width W(m) 1.00 m
Thickness T(m) 0.25 m
Volume of Concrete V(m3) 0.25 m3
F1 Number of Footing unit 12.00 units
TOTAL VOLUME OF CONCRETE V(m3) 3.00 m3
NUMBER OF CEMENT BAGS Bags 27.00 bags
VOLUME OF SAND m3 1.50 m3
VOLUME OF 3/4" GRAVEL m 3
3.00 m3
Length L(m) 0.00 m
Width W(m) 0.00 m
Thickness T(m) 0.30 m
Volume of Concrete V(m3) 0.00 m3
F2 Number of Footing unit 0.00 units
TOTAL VOLUME OF CONCRETE V(m3) 0.00 m3
NUMBER OF CEMENT BAGS Bags 0.00 bags
VOLUME OF SAND m3 0.00 m3
VOLUME OF 3/4" GRAVEL m 3
0.00 m3
Length L(m) 1.20 m
Width W(m) 1.20 m
Thickness T(m) 0.25 m
Volume of Concrete V(m3) 0.36 m3
F3 Number of Footing unit 0.00 unit/s
TOTAL VOLUME OF CONCRETE V(m3) 0.00 m3
NUMBER OF CEMENT BAGS Bags 0.00 bags
VOLUME OF SAND m3 0.00 m3
VOLUME OF 3/4" GRAVEL m 3
0.00 m3
FOOTING TIE BEAM
FORMULA: VOLUME=LT*W*D
Total Length LT(m) 36.00 m
Width W(m) 0.20 m
Thickness T(m) 0.35 m
Volume of Concrete V(m3) 2.52 m3
TB
TOTAL VOLUME OF CONCRETE V(m3) 2.52 m3
NUMBER OF CEMENT BAGS Bags 23.00 bags
VOLUME OF SAND m3 1.30 m3
VOLUME OF 3/4" GRAVEL m3 2.60 m3
SLAB (BY AREA)
FORMULA: VOLUME=AREA*T CONCRETE MIX RATIO =
Area A(m2) 64.00 m2
Thickness T(m) 0.15 m
SLAB ON GRADE

Volume of Concrete V(m3) 9.60 m3


Number of Slabs unit 1.00 unit/s
TOTAL VOLUME OF CONCRETE V(m3) 9.60 m3
NUMBER OF CEMENT BAGS Bags 87.00 bags
VOLUME OF SAND m3 4.80 m3

VOLUME OF 3/4" GRAVEL m3 9.60 m3


SECOND FLOOR LEVEL AND ROOF DECK

Total Area A(m2) 0.00 m2


Thickness T(m) 0.15 m
Volume of Concrete V(m3) 0.00 m3
Number of Slabs unit 2.00 unit/s
TOTAL VOLUME OF CONCRETE V(m3) 0.00 m3
NUMBER OF CEMENT BAGS Bags 0.00 bags
VOLUME OF SAND m3 0.00 m3
VOLUME OF 3/4" GRAVEL m3 0.00 m3

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS COMPUTATIONS

WALL FOOTING
WF1
Total Length 16.00 m
Width 0.40 m
Thickness 0.25 m
Volume of Concrete 1.60 m3
TOTAL VOLUME OF CONCRETE 1.60 m3
NUMBER OF CEMENT BAGS 15.00 bags
VOLUME OF SAND 0.80 m3
VOLUME OF 3/4" GRAVEL 1.60 m3
CONCRETE COLUMNS
C1 C2-C3
COLUMN DIMENSIONS WIDTH 1 0.20 0.00
GROUND TO SECOND FLOOR LEVEL

WIDTH 2 0.20 0.00


Area A(m2) 0.04 0.00
Height L(m) 3.00 0.00

Volume of Concrete for Each


Column V(m3) 0.12 0.00
Number of Columns units 22.00 7.00
TOTAL VOLUME OF CONCRETE V(m3) 2.64 0.00
NUMBER OF CEMENT BAGS Bags 24.00 0.00
VOLUME OF SAND V(m3) 1.40 0.00
VOLUME OF 3/4" GRAVEL V(m3) 2.70 0.00
REINFORCED CONCRETE GIRDERS
FORMULA: VOLUME=LT*W*D CLASS A CONCRETE MIX =
2G-1 2CG-1 2G-2 2CG-2 2G-3 2G-4 2G-4A
Total Length 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LT(m)
SECOND FLOOR LEVEL AND ROOF DECK

Width 0.00 0.00 0.25 0.25 0.25 0.25 0.25 W(m)


Depth 0.40 0.40 0.40 0.40 0.40 0.40 0.40 H(m)
Volume of Concrete 0.00 0.00 0.00 0.00 0.00 0.00 0.00 V(m3)

TOTAL VOLUME OF CONCRETE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 V(m3)
NUMBER OF CEMENT BAGS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Bags
VOLUME OF SAND 0.00 0.00 0.00 0.00 0.00 0.00 0.00 m3
VOLUME OF 3/4" GRAVEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 m3
RG-1 RG-2
Total Length m3 0.00 0.00 m
Width W(m) 0.20 0.20 m
Depth H(m) 0.40 0.40 m
ROOF BEAM

Volume of Concrete V(m3) 0.00 0.00 m3

TOTAL VOLUME OF CONCRETE V(m3) 0.00 0.00 m3


NUMBER OF CEMENT BAGS Bags 0.00 0.00 bags
VOLUME OF SAND m3 0.00 0.00 m3
VOLUME OF 3/4" GRAVEL m 3
0.00 0.00 m3

SUMMARY

VOLUME OF SAND VOLUME OF GRAVEL


NUMBER OF CEMENT BAGS
FOOTING 27.00 1.50 3.00
FOOTING TIE BEAM 23.00 1.30 2.60
SLAB (BY AREA) 87.00 4.80 9.60
WALL FOOTING 15.00 0.80 1.60
CONCRETE COLUMNS 24.00 1.40 2.70
REINFORCED CONCRETE GIRDERS 0.00 0.00 0.00
REINFORCED CONCRETE BEAMS 0.00 0.00 0.00
TOTAL 176.00 BAGS 9.80 CU M 19.50 CU M

REFERENCE NOTES (DO NOT PRINT)

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS COMPUTATIONS

RECOMMENDED MIXES FOR DIFFERENT MIXES FOR DIFFERNET CONCRETE CONSTRUCTION

MAXIMUM SIZE OF AGGREGATES WATER FOR DRY AGGREGATES


TYPE OF WORK CONCRETE MIX RATIO
(mm) (Liter)*

Small precast work, fence posts, poles,


1:2:2 16 20
garden furniture and other work of very thin
sections

Storage tanks, cisterns, sewers, well knerbs, 1:2:3 20 25


watertight work, and columns or other
structural parts subjected to high stresses

Reinforced concrete work, floor slab, 1:2.5:3.5 20 32


beams, columns, arches, stairs etc

Ordinary floors, footpaths, driveways, steps, 1:2.5:3.5 20 23


roads, pavements

Building and basement walls, silos, sills,


lintels, machine foundations subject to 1:2:4 40 30
vibration, bridges, dams, piers, etc exposed
to action of water and frost foundation
concrete for masonry walls

Culverts, retaining walls, compound walls, 1:3:5 40 34


ordinary machine bases, etc.

Mass concrete for heavy walls, lean concrete


for levelling course of RCC foundations 1:3:6 63 36

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS COMPUTATIONS

MASONRY WORKS COMPUTATIONS


150mm THK CHB

Ground Floor Second Floor


TOTAL
Level Level

Enter wall height H (m) 4.40 3.50 m

Enter wall length L (m) 85.00 109 m

Enter Area of Doors and Aw (m2) 28.40 51.60 m2


Windows
Breakage Allowance % 10.00 10.00 %

TOTAL WALL AREA m3 374.00 381.5 m2

TOTAL NUMBER OF CHB 4" units 4752.00 4537.00 9289.00 pcs


MORTAR USING 4" CHB
# OF CEMENT bags 197.00 201.00 398.00 bags

VOL. OF SCREENED SAND m3 16.40 16.80 33.20 m3


PLASTER: 16mm thk Mix 1:2
Two faces of the wall
# OF CEMENT bags 216.00 220.00 436.00 bags

VOL. OF SCREENED SAND m3 12.00 12.30 24.30 m3

SUMMARY
NUMBER OF CHB 4" CEMENT BAGS VOLUME OF SAND
COMPUTED MASONRY MATERIALS 9289.00 834.00 57.50
TOTAL 9289.00 PCS 834.00 BAGS 57.50 CU M

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

STEEL REINFORCEMENT COMPUTATIONS


Length of reinforcing bars for CHB in meters
(m) Length of (m) Length of
Vertical Horizontal
Vertical spacing (cm) Spacing Layer
Reinforceme Reinforcement/sq.m
nt/sq.m. .
40 2.93 2 layers 3.30
60 2.13 3 layers 2.15
80 1.60 4 layers 1.72

150mm THK CHB WALL REINFORCEMENT


Enter Wall Height H (m) 4.40 m
Enter Wall Length L (m) 194.00 m
GROUND FLOOR LEVEL

Enter Wall Openings m 2


80.00 m
Enter Constant Factor Vertical 2.93 60 cm
Enter Constant Factor Horizontal 3.30 3 layers
TOTAL WALL AREA 773.6 m2

# OF VERTICAL 10mm REBARS USED 38 lengths @6m


# OF HORIZONTAL 10MM BARS USED 43 lengths @6m
#16 TIE WIRE USED 36.4 kgs
FOOTING REINFORCEMENT

NOTE: TENSION BARS IN F3 WILL CONSUME 5


FOOTING F1 F2 F3

LENGTHS OF 16mm REINFORCING BARS


Enter Footing Length L (m) 1.00 0.00 1.20 m
Enter Footing Width W (m) 1.00 0.00 1.20 m
Enter # of Bars along Length (y) # 18.00 18.00 30.00 pcs
Enter # of bars along Width (x) # 18.00 14.00 20.00 pcs
Enter # of footing # 12.00 0.00 0.00 units
Enter Clear Cover Cc (M) 0.05 0.05 0.05 m
Note: Standard Clear Cover for Footing = 0.05m to 0.075m
Net. Length along Length 0.90 -0.10 1.10 m
Net. Length along Width 0.90 -0.10 1.10 m
# of 16mmØ Reinforcing Bars Used 72.00 0.00 0.00 lengths
#16 Tie Wire Used 29.40 0.00 0.00 kgs
WALL FOOTING REINFORCEMENT
W1
Enter Wall Footing Width W (m) 0.40 m
Enter Wall Footing Total Length LT (m) 16.00 m
Enter Spacing of Tie Bars for Wall
(m) 0.30 m
Footing
Total # of Ties 55.00 pcs
Total # of Horizontal Bars Used 3.00 lengths
Overall Total # of 10mm Reinforcing Bars used 7.00 lengths
#16 Tie Wire Used 0.90 kgs
COLUMN REINFORCEMENT
COLUMN C1 C2-C3

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


EL
BILL OF MATERIALS

Enter Column Height H (m) 3.00 0.00


Enter Number of columns units 22.00 7.00

Enter Reinforcement Bar Diameter

GROUND TO SECOND FLOOR LEVEL


required Ø 16.00 16.00
Enter Column Dimension D1 (m) 0.20 0.00
Enter Column Dimension D2 (m) 0.20 0.00

Enter Number of Vertical Bars (m) 8.00 8.00


Enter Lateral Ties bar diameter required Ø 10.00 10.00
Enter lateral ties spacing (m) 0.10 0.10
Use End Hook 0.20 0.20

Total length of each bars should be more than or equal


to 3.90 0.90
Total Number of 16mmØ Vertical Bars @ 6m 114.40 8.40
6
Cut Length of each ties 0.70 -0.20
Number of ties per column 42.00 12.00
Total number of 10mmØ bars used for LATERAL TIES @ 6m 108.00 -3.00
#16 TIE WIRE USED 21.00 2.00
BEAM REINFORCEMENT
2G-1 2CG-1 2G-2 2CG-2 2G-3 2G-4
SECOND FLOOR

ROOF DECK
LEVEL AND

Enter Total Beam Length L (m) 0.00 0.00 0.00 0.00 0.00 0.00
Enter Beam Width W (m) 0.00 0.00 0.25 0.25 0.25 0.25
Enter Beam Depth D (m) 0.40 0.40 0.40 0.40 0.40 0.40
SECOND FLOOR LEVEL AND ROOF DECK

Enter Column Width Max Cw (m) 0.35 0.35 0.35 0.35 0.35 0.35

# of Continuous Bars # of Non-continuous Bars Size of Bar

Top Bars 3.00 3.00 16.00


2G-1
Bottom Bars 2.00 2.00 16.00
Top Bars 4.00 4.00 16.00
2CG-1
Bottom Bars 2.00 2.00 16.00
Top Bars 4.00 3.00 16.00
2G-2
Bottom Bars 2.00 2.00 16.00
Top Bars 3.00 3.00 16.00
2CG-2
Bottom Bars 2.00 2.00 16.00
Top Bars 5.00 5.00 16.00
2G-3
Bottom Bars 5.00 5.00 16.00
Top Bars 3.00 3.00 16.00
2G-4
Bottom Bars 2.00 2.00 16.00
Top Bars 3.00 3.00 16.00
2G-4A
Bottom Bars 2.00 2.00 16.00
Top Bars 3.00 3.00 16.00
2B-1
Bottom Bars 2.00 2.00 16.00
Top Bars 3.00 3.00 16.00
2B-1A
Bottom Bars 2.00 2.00 16.00
Top Bars 2.00 2.00 16.00
RB-1
Bottom Bars 2.00 2.00 16.00
TIE BEAM ROOF BEAM
Enter Total Beam Length L (m) 36.00 0.00 m

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

Enter Beam Width W (m) 0.20 0.20 m


Enter Beam Depth D (m) 0.35 0.40 m
Enter Column Width Max Cw (m) 0.30 0.30 m

# of Continuous Bars # of Non-continuous Bars Size of Bar

Top Bars 3.00 2.00 16.00


TIE BEAM
Bottom Bars 2.00 3.00 16.00
Top Bars 3.00 2.00 16.00
ROOF BEAM
Bottom Bars 2.00 3.00 16.00
SECOND FLOOR LEVEL AND ROOF DECK 2G-1 2CG-1 2G-2 2CG-2 2G-3 2G-4
Enter Stirrup Bar Diameter required 10.00 10.00 10.00 10.00 10.00 10.00
Enter stirrup spacing 0.15 0.15 0.15 0.15 0.15 0.15
Top Bars
# of 6m Length Deformed Bars required as Continuous Bars 1.00 1.00 1.00 1.00 1.00 1.00
# of 6m Length Deformed Bars required as Non-continuous bars 1.00 1.00 1.00 1.00 1.00 1.00
Bottom Bars
# of 6m Length Deformed Bars used as Continuous Bars 1.00 1.00 1.00 1.00 1.00 1.00
# of 6m Length Deformed Bars required as Non-continuous bars 0.00 0.00 0.00 0.00 0.00 0.00
# of 16mm bars required as main bars 3.00 3.00 3.00 3.00 3.00 3.00
# of 10mm bars required as stirrups 2.00 2.00 2.00 2.00 2.00 2.00
#16 TIE WIRE USED: 0.60 0.70 0.70 0.60 1.20 0.60
TIE AND ROOF BEAM TIE BEAM ROOF BEAM
Enter Stirrup Bar Diameter required 10.00 10.00 mm
Enter stirrup spacing 0.15 0.15 m
Top Bars
# of 6m Length Deformed Bars required as Continuous Bars 19.00 1.00 lengths
# of 6m Length Deformed Bars required as Non-continuous bars 7.00 1.00 lengths
Bottom Bars
# of 6m Length Deformed Bars used as Continuous Bars 13.00 1.00 lengths
# of 6m Length Deformed Bars required as Non-continuous bars 13.00 0.00 lengths
# of 16mm bars required as main bars 52.00 3.00 lengths
# of 10mm bars required as stirrups 41.00 2.00 lengths
#16 TIE WIRE USED: 7.40 0.60 kgs
SLAB ON GRADE REINFORCEMENT
Enter Slab Width W (m) 15.00 m
Enter Slab Length LT (m) 12.00 m
Enter Spacing of Temperature Bars (L) (cm) 40.00 cm
Enter Spacing of Temperature Bars (W) (cm) 40.00 cm
# OF STEEL BARS USED PARALLEL TO L 85.00 lengths
# OF STEEL BARS USED PARALLEL TO W 84.00 lengths
Overall Total # of 10mm Reinforcing Bars used 169.00 lengths
#16 Tie Wire Used 41.00 kgs
STEEL DECK 2nd Floor and roof deck
AREA 146.00 m2
Enter Slab Width W (m) 32.00 m
Enter Slab Length LT (m) 20.00 m
Enter Spacing of Temperature Bars (L) (cm) 20.00 cm
Enter Spacing of Temperature Bars (W) (cm) 20.00 cm
# OF STEEL BARS USED PARALLEL TO L 588.00 lengths
# OF STEEL BARS USED PARALLEL TO W 586.00 lengths 18

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

Overall Total # of 10mm Reinforcing Bars used 1174.00 lengths


#16 Tie Wire Used 1951.00 kgs

SUMMARY
Reinforcing Bars (mm) Tie Wire
Steel Deck (m2)
Ø16 Ø12 Ø10 #16
150mm THK CHB WALL REINFORCEMENT 81.00 36.40
FOOTING REINFORCEMENT 77.00 29.40
WALL FOOTING REINFORCEMENT 7.00 0.90
COLUMN REINFORCEMENT 122.80 105.00 23.00
BEAM REINFORCEMENT 55.00 12.40
SLAB ON GRADE REINFORCEMENT 169.00 41.00
STEEL DECK 2nd Floor and roof deck 1174.00 195.00 146.00
TOTAL 199.80 1174.00 417.00 338.10 146.00

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


NOTE: TENSION BARS IN F3 WILL CONSUME 5
LENGTHS OF 16mm REINFORCING BARS
BILL OF MATERIALS

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

2G-4A 2B-1 2B-1A RB-1


0.00 0.00 0.00 0.00
0.25 0.20 0.20 0.20
0.40 0.40 0.40 0.35
0.35 0.35 0.35 0.35

Units

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

m
m
m

Units

mm
mm
mm
mm
2G-4A 2B-1 2B-1A RB-1
10.00 10.00 10.00 10.00 mm
0.15 0.15 0.15 0.15 m

0.00 1.00 0.00 0.00 lengths


0.00 0.00 4.00 0.00 lengths

0.00 1.00 0.00 0.00 lengths


0.00 0.00 0.00 0.00 lengths
0.00 2.00 4.00 0.00 lengths
2.00 2.00 2.00 2.00 lengths
0.00 0.30 1.90 0.00 kgs

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

l Deck (m2)

146.00
146.00

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

CARPENTRY WORKS COMPUTATIONS


CEILING CARPENTRY
Enter width of ceiling W (m) 15.00 m
GROUND FLOOR

Enter length of ceiling L (m) 11.00 m


Ceiling Furring Spacing 60.00 cm 58.00 lengths @ 5m
CEILING

Primary Channel Spacing 120.00 cm 30.00 lengths @ 5m


Suspension Hanger 112.00 pcs
Channel Clip 225.00 pcs
FiCem Board 4.5mm 1.2m x 2.4m 165 m2 60.00 sheets
Enter width of ceiling W (m) 15.20 m
Enter length of ceiling L (m) 11.00 m
SECOND FLOOR

Ceiling Furring Spacing 60.00 cm 59.00 lengths @ 5m


CEILING

Primary Channel Spacing 120.00 cm 31.00 lengths @ 5m


Suspension Hanger 98.00 pcs
Channel Clip 182.00 pcs
FiCem Board 4.5mm 1.2m x 2.4m 167.2 m2 61.00 sheets

SUMMARY
Ceiling Furring Spacing 117.00 lengths @ 5m
Primary Channel Spacing 61.00 lengths @ 5m
Suspension Hanger 210.00 pcs
Channel Clip 407.00 pcs
FiCem Board 4.5mm 1.2m x 2.4m 121.00 sheets

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS COMPUTATIONS

TILING WORKS COMPUTATIONS

TILE SIZE # OF PCS


inch cm per m2
24x48 .60X1.2M 1.30
4x4 10x10 100.00
4 1/4 x 4 1/4 10.6x10.6 88.40
4x8 10x20 50.00
TABLE OF TILEWORK

6x6 15x15 44.44


6x8 15x20 33.33
6x12 15x30 22.22
8x48 20x1200 4.10
8x12 20x30 16.66
8x16 20x40 12.50
10x16 25x25 16.00
12x12 30x30 11.11
12x24 30x60 5.56
16x16 40x40 6.25
20x20 50x50 4.00
24x24 60x60 2.78
Cement Mortar 0.189 per m2
White Cement Joint Filler 0.500 per m2
Tile Adhesive 0.110 per m2

GROUND FLOOR SECOND FLOOR TOTAL (m2) NO. OF TILES (pcs)

600x1200 mm STATUARIO 50.00 26.76 76.76 111.00


MARBLE effect (For Interiors)

600x600mm Honed Gray 5.00 27.12 32.12 94.00


Homogeneous Floor Tile

3.00 9.00 12.00 71.00


300x600mm Honed Homogeneous
Floor Tile

50.00 50.00 438.00


100x200mm heringbone pavers
(carport)

6.00 6.00 54.00


200x200mm homogeeous tile

1200x200mm Non Slip


48.00 48.00 544.00
Homogeneous Floor Tile wood
design
Cement Mortar 43.00 bags
White Cement 12.00 bags
Tile Adhesive 37.00 bags
Cement based Waterproofing 120.00 kg

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS COMPUTATIONS

WALL TILE T & B, Pantry and Sink


SECOND
GROUND FLOOR TOTAL (m2) NO. OF TILES (pcs)
FLOOR

Sink Pantry T&B T&B


Wall Height 0.50 0.50 1.50 1.50 4.00
Wall Dimensions 2.60 9.30 10.00 15.00 36.90
138.37 808.00
Area of Doors 0.00 3.36 2.47 2.70 8.53
Area of Windows 0.00 0.00 0.35 0.35 0.70

300x600mm Polished Homogeneous Floor Tile 808.00 pcs

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

PAINTING WORKS
PRIMER
DRYING COVERAGE/
KIND OF PAINT USES THINING
TIME Gal

2 hrs, allow
For interior wood Paint 25 to 30
Interior Primer & Sealer overnight b4
surfaces Thinner sq.m.
recoating

6 hrs, allow
For exterior wood Paint 30 to 40
Exterior Wood Primer overnight b4
surfaces Thinner sq.m.
recoating

Primer for ferrous and Paint 35 to 40


Red Oxide Primer 3 Hours
non-ferrous materials Thinner sq.m.

Rust preventive primer Paint 30 to 40


Red Lead Primer 3 Hours
for ferrous surfaces Thinner sq.m.

6 hrs, allow
30 to 40
Epoxy Primer Epoxy Reducer overnight b4
sq.m.
recoating

WATER BASE MASONRY PAINT

30 minutes
Exterior & Interior 1/2 lts/ 4 lts 30 to 40
Acrylic Latex Paint allow 6 hrs
masonry surfaces water sq.m.
b4 recoat

30 minutes
Exterior & Interior 30 to 40
Acrylic Semi-Gloss Latex Water allow 6 hrs
masonry surfaces sq.m.
b4 recoat

30 minutes
Exterior & Interior 30 to 40
Acrylic Gloss Latex Water allow 6 hrs
masonry surfaces sq.m.
b4 recoat

For furniture, cabinets, 1 Hour.


doors, windows, tools, Allow 4 hrs 30 to 40
Latex Hi-Gloss Enamel Usse as is
toys, wrought iron, & before sq.m.
primed metals recoating

Tinting Colors Acrylic colors water


ROOF PAINT

4 hrs. allow
for G.I. Shts, asbestos
All weather acylic roof overnight 40 to 50
bricks concrete and water
shield before sq.m.
stucco
recoating

COMPUTATIONS BY: MA. VENUS KIM S. CARLON, uap, rmp


BILL OF MATERIALS

6 hrs. allow
G.I. roofs and other
Paint overnight 30 to 40
Davies Roof paint metal such as aluminum
Thinner before sq.m.
and steel
recoating

ENAMEL AND GLOSS PAINT

5 hrs. allow
for exterior & interior Paint 30 to 40
Quick Drying Enamel 8 hrs. before
wood and metal surface Thinner sq.m.
recoating

6 hrs. allow
Interior wood and metal Paint overnight 25 to 30
Interior semi-Gloss Enamel
surfaces Thinner before sq.m.
recoating

3 hrs. allow
for interior wall & Paint overnight 40 to 50
Flat wall Enamel
ceilings Thinner before sq.m.
recoating

6 hrs. allow
for exterrior wood and
Paint 48 hrs. 30 to 35
Exterior Gloss paint properly primed metal
Thinner before sq.m.
surfaces
recoating

Tinting Colors Oil Base tinting color


VARNISHING

for floors, sidings


Paint 40 to 50
Valspar or Spar Varnish furnitures, deck of 24 hours
Thinner sq.m.
boats

10 minutes.
for interior new wood Allow 30
Lacquer 40 to 50
Hi-solid sanding sealer furnitures and fixtures, minutes
Thinner sq.m.
cabinet, doors, etc. before
recoat

Allow 30
for interior new wood
Lacquer minutes 30 to 40
Hi-solid clear gloss Lacquer furnitures, door
Thinner before sq.m.
panelling and trim.
recoat

Allow 30
for interior new wood
Lacquer minutes 30 to 40
Hi-solid Semi-gloss Lacquer furnitures, cabinets,
Thinner before sq.m.
doors, shelves, etc
recoat

COMPUTATIONS BY: MA. VENUS KIM S. CARLON, uap, rmp


BILL OF MATERIALS

for interior wood Allow 30


furniture, cabinets, Lacquer minutes 30 to 40
Hi-solid dead flat Lacquer
door jambs, trim Thinner before sq.m.
panelling, etc. recoat

Allow 30
for furnitures, cabinets,
Lacquer minutes 30 to 40
Water white gloss Lacquer doors, panel and
Thinner before sq.m.
interior walls
recoat

EXTERIOR WALL

Perimeter Ground TOTAL


Wall Floor Second Floor
Enter wall height H (m) 9.80 3.50 3.50 m
Enter wall length L (m) 67.80 55.70 109.00 m

Enter Area of Window Aw (m2) 32.00 56.00 m2

Enter Area of Door AD (m2) m2

Exterior Wall Area Awallm2 664.44 194.95 381.50 1208.89 m2


Enter Coverage/Gal gals 25.00 gals
Number of Coats 2.00
PUTTY (SKIM COAT) gals 43.00 BAGS
THINNER FOR PUTTY
CONCRETE NEUTRALIZER gals 3.00 gal
PRIMER/SEALER gals 52.00 gals
TOPCOATS gals 52.00 gals
SOURCE: http://www.daviespaints.com.ph/tools/paint-calculator/

INTERIOR WALL

Perimeter Ground TOTAL


Wall Floor Second Floor
Enter wall height H (m) 3.00 3.50 m
Enter wall length L (m) 137.00 86.00 m

Enter Area of Window Aw (m2) m2


28.40
Enter Area of Door AD (m2) m2

Interior Wall Area Awallm2 383.00 301.00 655.60 m2


Enter Coverage/Gal gals 25.00 25.00 25.00 gals
Number of Coats 2.00 2.00 2.00
ELASTOMERIC PUTTY
bags 20.00 BAGS
(FULL)

THINNER FOR PUTTY


CONCRETE NEUTRALIZER gals 0.00 gals
PRIMER/SEALER gals 24.00 gals
TOPCOATS gals 24.00 gals
CEILING

Third Floor TOTAL


Ground Floor Second Floor

COMPUTATIONS BY: MA. VENUS KIM S. CARLON, uap, rmp


BILL OF MATERIALS

Enter wall width H (m) 15.00 15.00 m


Enter wall length L (m) 11.00 11.00 m

Area Awallm2 165.00 165.00 330.00 m2


Enter Coverage/Gal gals 25.00 25.00 25.00 gals
Number of Coats 2.00 2.00 2.00
PUTTY gals 12.00 gals
PAINT THINNER L 1.00 L
PRIMER/SEALER gals 6.00 gals
TOPCOAT (Flatwall l) gals 12.00 gals
CONCRETE STAMPING
Concrete Stamps on Brick Pattern L 8.40 m
H 9.40 m
A 33.6 m2
Wet-look Sealer 1.00 gal

COMPUTATIONS BY: MA. VENUS KIM S. CARLON, uap, rmp


CONCRETE STAIRS
CONCRETE
Riser Height 0.17 m
Tread Run 0.30 m
Stair Width 0.85
0.04 m3
No. of Steps 17.00

Volume of Stairs 0.72 m3


Stringer Length 9.40 m
Stringer Thickness 0.15 m

Volume of Stringer 1.20 m3


Total Vol. of Concrete on Stairs 1.91
No. of Cement Bags 18.00 bags

Volume of Sand 1.00 m3

Volume of Gravel 2.00 m3


Landing 01
Landing Width 1.30 m
Landing Length 3.00 m
Thickness 0.15 m

Total Volume of Concrete 0.59 m3


No. of Cement Bags 6.00 bags

Volume of Sand 0.30 m3

Volume of Gravel 0.60 m3


REINFORCEMENT
Riser Height 0.17 m
Tread Run 0.30 m
Stair Width 0.85 m
No. of Steps 17.00 steps
Stringer Thickness 0.15 m
Enter Stringer Bar Spacing 0.30 m
Enter Stringer Bar Diameter (mm) 10.00 mm
Enter Horizontal Bar Spacing 0.30 m
Enter Horizontal Bar Diameter (mm) 12.00 mm
Enter Lateral Bar Spacing 0.20 m
Enter Lateral Bar Diameter (mm) 16.00 mm
# of 10mmØ Reinforcing Bars Used Lateral Bars 9.00 lengths

8.00 lengths
# of 12mmØ Reinforcing Bars Used Horizontal Bars
# of 16mmØ Reinforcing Bars Used 5.00 lengths 0.34
#16 Tie Wire Used 2.00 kgs

SUMMARY
CEMENT 24.00 bags
SAND 1.30 cu m
GRAVEL 2.60 cu m
10mm REINFORCING BARS 9.00 lengths
12mm REINFORCING BARS 8.00 lengths
16mm REINFORCING BARS 5.00 lengths
NO. 16 TIE WIRE USED 2.00 kgs
BILL OF MATERIALS

FORMS
COLUMNS
C1 C2-C3
COLUMN DIMENSIONS

0.20 0.00
WIDTH 1

0.20 0.00
WIDTH 2

3.00 0.00
HEIGHT

22.00 7.00
Number of Columns
1.00 0.20
52.80 3.36

563.73 59.34 623.07 bd ft 52.00 PCS


Total # of bd ft of frame required

W1 (in) W2 (in) L (ft)


Enter desired lumber dimension

2 3 8 TOTAL

Total number of lumber 141.00 15.00 156.00 pcs


Total number of phenolic board
19.00 2.00 21.00 sheets
required

42.30 2.70 45.00 kgs


Total number of #2 1/2 CWNails

Total Number of #1 Finishing 1.80 0.20 2.00 kgs


nails
BEAM
SECOND FLOOR LEVEL AND ROOF DECK 0
2G-1 2CG-1 2G-2 2CG-2 2G-3 2G-4
Enter Beam Length 0.00 0.00 0.00 0.00 0.00 0.00 m
Beam Dimension DEPTH 0.40 0.40 0.40 0.40 0.40 0.40 m
Beam Dimension WIDTH 0.00 0.00 0.25 0.25 0.25 0.25 m
0.90 0.90 1.15 1.15 1.15 1.15
0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 bd ft 0.00 bd ft


Total # of bd ft of frame required

W2 (in)
Enter desired lumber dimension W1 (in) L (ft)

TOTAL
2 3 8
Total number of lumber 0.00 0.00 0.00 0.00 0.00 0.00 0.00 pcs

Total number of phenolic board 0.00 0.00 0.00 0.00 0.00 0.00 0.00 sheets
required

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

0.00 0.00 0.00 0.00 0.00 0.00 0.00 kgs


Total number of #2 1/2 CWNails

Total number of #1 Finishing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 kgs
Nails
SCAFFOLDINGS AND STAGING
QUANTITY OF LUMBER FOR SCAFFOLDING OR STAGING
COLUMN BEAM

LUMBER SIZE bd ft per meter height FLOORING


bd ft per meter height
Vertical Horizontal Brace Vertical Horizontal
2" X 2" 4.70 21.00 11.70 4.00 4.70 6.10
2" X 3" 7.00 31.67 17.50 6.00 7.00 9.10
2" X 4" 9.35 42.25 23.35 8.00 9.35 12.10
COLUMN SCAFFOLDINGS
C1 C2-C3
Enter Column Height 3.00 0.00
Enter # of Columns 22.00 7.00
Total Column Height 66.00 0.00
VERTICAL SUPPORT 311.00 0.00
HORIZONTAL SUPPORTS 1386.00 0.00 2470.00 bd ft 206.00 pcs
DIAGONAL BRACES 773.00 0.00
BEAM SCAFFOLDINGS
Total Beam Length 0.00 METERS
VERTICAL SUPPORT 0 bd ft
0 bd ft 0 PCS
HORIZONTAL SUPPORTS 0 bd ft
FLOORING SCAFFOLDINGS
AREA 0.00 SQM
SUPPORT 0.00 BD FT - PCS

PHENOLIC BOARDS 0.00 SHEETS

W1 (in) W2 (in) L (ft) W1 (in) W2 (in) L (ft) W1 (in) W2 (in) L (ft)


Enter desired lumber dimension
2 2 8 2 3 8 2 4 8

SCAFFOLDING AND STAGING


2 x 2 x 8 Lumber 464.00 pcs
2 x 3 x 8 Lumber 0.00 pcs
2 x 4 x 8 Lumber 0.00 pcs
#4 CWNails 49.00 kgs

SUMMARY
2 x 2 x 8 Lumber 206.00 pcs
2 x 3 x 8 Lumber 0.00 pcs

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

2 x 4 x 8 Lumber 0.00 pcs


Phenolic Board 21.00 pcs
#2 1/2 CWNails 45.00 kgs
#1 Finishing Nails 2.00 kgs
#4 CWNails 49.00 kgs

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

- pcs

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


SEPTIC TANK DETAILS
W 2.30
L 6.50
H 2.00
SEPTIC VAULT MASONRY
Enter wall height H (m) 2.00 m
Enter wall total wall length L (m) 17.60 m

Total Wall Area A (m2) 35.20 m2


Breakage Allowance % 10.00 %
TOTAL NUMBER OF CHB 4" units 484.00 pcs
MORTAR USING 4" CHB
# OF CEMENT bags 19.00 bags

VOL. OF SCREENED SAND m3 1.60 m3


SEPTIC TANK REINFORCEMENT
150mm THK CHB
Enter Wall Height H (m) 2.00 m
Enter Wall Length L (m) 17.60 m
Enter Constant Factor Vertical 2.13 60 cm
Enter Constant Factor Horizontal 2.15 3 layers
TOTAL WALL AREA 35.20 m2
# OF VERTICAL 10mm REBARS USED 2.00 lengths @ 6m
# OF HORIZONTAL 10MM BARS USED 2.00 lengths @ 6m
#16 TIE WIRE USED 1.70 kgs
SEPTIC VAULT SLAB
FORMULA: VOLUME=AREA*T
W 2.30
L 6.50
Area A(m )
2
14.95 m2
Thickness T(m) 0.15 m
Volume of Concrete V(m )
3
2.24 m3
Number of Slabs unit 2.00 unit/s
TOTAL VOLUME OF CONCRETE V(m3) 4.48 m3
NUMBER OF CEMENT BAGS Bags 41.00 bags
VOLUME OF SAND m3 2.30 m3
VOLUME OF 3/4" GRAVEL m3 4.50 m3
SEPTIC VAULT - GROUND SLAB REINFORCEMENT
Enter Slab Width W (m) 2.30 m
Enter Slab Length LT (m) 6.50 m
Enter Spacing of Temperature Bars
(cm) 40.00 cm
(L)
Enter Spacing of Temperature Bars
(cm) 40.00 cm
(W)
# OF STEEL BARS USED PARALLEL TO L 8.00 lengths
# OF STEEL BARS USED PARALLEL TO W 8.00 lengths
Overall Total # of 12mm Reinforcing Bars used 16.00 lengths
#16 Tie Wire Used 1.00 kgs
SEPTIC VAULT - SLAB REINFORCEMENT
Enter Slab Width W (m) 1.60 m
Enter Slab Length LT (m) 5.00 m
Enter Spacing of Temperature Bars
(cm) 150.00 cm
(L)
Enter Spacing of Temperature Bars
(cm) 150.00 cm
(W)
# OF STEEL BARS USED PARALLEL TO L 2.00 lengths
# OF STEEL BARS USED PARALLEL TO W 2.00 lengths
Overall Total # of 10mm Reinforcing Bars used 4.00 lengths
#16 Tie Wire Used 1.00 kgs

RAINCOLLECTOR TANK MASONRY


Enter wall height H (m) 2.50 m
Enter wall total wall length L (m) 8.20 m

Total Wall Area A (m2) 20.50 m2


Breakage Allowance % 10.00 %
TOTAL NUMBER OF CHB 4" units 282.00 pcs
MORTAR USING 4" CHB
# OF CEMENT bags 11.00 bags

VOL. OF SCREENED SAND m3 0.90 m3


RAINWATER COLLECTOR TANK DETAILS
W 1.30
L 3.00
H 1.49
RAINCOLLECTOR TANK REINFORCEMENT
150mm THK CHB
Enter Wall Height H (m) 1.49 m
Enter Wall Length L (m) 8.60 m
Enter Constant Factor Vertical 2.13 60 cm
Enter Constant Factor Horizontal 2.15 3 layers
TOTAL WALL AREA 12.81 m2
# OF VERTICAL 10mm REBARS USED 1.00 lengths @ 6m
# OF HORIZONTAL 10MM BARS USED 1.00 lengths @ 6m
#16 TIE WIRE USED 0.70 kgs
RAINCOLLECTOR TANK SLAB
FORMULA: VOLUME=AREA*T
Area A(m2) 3.90 m2
Thickness T(m) 0.15 m
Volume of Concrete V(m3) 0.59 m3
Number of Slabs unit 2.00 unit/s
TOTAL VOLUME OF CONCRETE V(m3) 1.17 m3
NUMBER OF CEMENT BAGS Bags 11.00 bags
VOLUME OF SAND m3 0.60 m3
VOLUME OF 3/4" GRAVEL m3 1.20 m3
RAINCOLLECTOR - GROUND SLAB REINFORCEMENT
Enter Slab Width W (m) 1.30 m
Enter Slab Length LT (m) 3.00 m
Enter Spacing of Temperature Bars
(cm) 40.00 cm
(L)
Enter Spacing of Temperature Bars
(cm) 40.00 cm
(W)
# OF STEEL BARS USED PARALLEL TO L 3.00 lengths
# OF STEEL BARS USED PARALLEL TO W 3.00 lengths
Overall Total # of 10mm Reinforcing Bars used 6.00 lengths
#16 Tie Wire Used 1.00 kgs
RAINCOLLECTOR - SLAB REINFORCEMENT
Enter Slab Width W (m) 1.30 m
Enter Slab Length LT (m) 3.00 m
Enter Spacing of Temperature Bars
(cm) 200.00 cm
(L)
Enter Spacing of Temperature Bars
(cm) 200.00 cm
(W)
# OF STEEL BARS USED PARALLEL TO L 1.00 lengths
# OF STEEL BARS USED PARALLEL TO W 1.00 lengths
Overall Total # of 10mm Reinforcing Bars used 2.00 lengths
#16 Tie Wire Used 1.00 kgs
CATCH BASIN MASONRY
W -
L -
H -
Number of Catch Basin -
CATCH BASIN MASONRY
Enter wall height H (m) 0.00 m
Enter wall total wall length L (m) 0.00 m
Number of Catch Basin 6.00

Total Wall Area A (m2) 0.00 m2


Breakage Allowance % 10.00 %
TOTAL NUMBER OF CHB 4" units 0.00 pcs
MORTAR USING 4" CHB
# OF CEMENT bags 0.00 bags

VOL. OF SCREENED SAND m3 0.00 m3

SUMMARY
CHB 4" 766.00 pcs
CEMENT 82.00 bags
SAND 5.40 cu m
GRAVEL 5.70 cu m
10mm REINFORCING BARS 34.00 lengths
NO. 16 TIE WIRE 6.40 kgs
BILL OF MATERIALS

ROOFING WORKS COMPUTATION


https://www.jacintocolor.com/price-estimator

LONG SPAN (RIB)

Side Lapping 2 1/2 1 1/2


Effective width 0.60 0.70
End Lapping 25cm - 30cm
Span m 16.00 m
Projection (Bolada) m 1.00 m
Height m 2.40 m
Determining the number of roof sheets
Enter roofing total width m 10.00 m
Enter effective width m 10.50 m
Number of roof sheets on two
sheets 2.00 sheets
sides of gable roof

Determining the number of roof accessories


Item Effective Length in Meters
Gutter 2.35
Flashing 2.30
Ridge Roll 2.20
Valley Roll 2.30
Hipped Roll 2.20
Gutter
Enter total covered Length 40.00 m
Enter Effective Length 2.35 m
Number of gutter 18.00 pcs
Flashings
Enter total covered Length 40.00 m
Enter Effective Length 2.30 m
Number of Flashing 18.00 pcs
Ridge
Enter total covered Length 42.20 m
Enter Effective Length 2.20 m
Number of ridge 20.00 pcs

Steel Truss (Fabrication)


A) MATERIALS: COST/UNIT UNIT QUANTITY UNIT RATE TOTAL COST

Structural Steel Framing including cross bracings, - 1.000 60.00 60.00


purlins,anchor bolts,and incidentals to complete
Consumable (5%of material cost) 3.00

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp


BILL OF MATERIALS

COMPUTATIONS BY: MA. VENUS KIM S.CARLON, uap, rmp