DETAILED LINIT PRICE ANALYSIS (DUPA)

Itern No.lDescription : 100(1) Ciearing & Grubbing (with Stripping)


Unit cf Measurement : sq.m.
Ci;tput per hour : 500.00

Designation No. of Person No. of Hours Hourly Rate Amount


Labor

a. Construction Foreman 1 09.1 I


b. Laborer 6"1 44 t// t-\6

Sub - Total for A 23? 07

Narrre and Capacity Itlo of units No. of Hours Hourly $tate Arnourut

Equipment

a. Dump Truck (10 cu.rn.) I 1 1,352 00 2,744.4C


b. Payloader (1.50 cu.m.) 1 1 1,733.00 1,733 00
c. Bulldozer (155 Hp), D65A-8 1 I 2.299.00 2,299.00

Sub - Total for B 6,736.00


Total (A + B) 6,968.07
a. ]utput per hour = 500.00 sq.rn.
E Direct Unit Cost (C * D) 13.94

Name and Specification Unit Quantity Unit Cost Amcunt


tr Materials

Sub - Total for F 0.00


Direct Unit Cost (E + F) 13.94
H. Overhead, Contingencies & Miscellaneous (OCM) 9% ofG 1.25
[. Contractor's Profit {CP) B% ofG 1.11
J. Value Added Tax (VAT) 124/oof(G+H+!) 1.96
K. otal Unlt Cost G+H+l+J) 18.26