Sab

e b a Xa
TRANSFORMER,
25kVA
Se
1 PB
2 PB Z=1.2%
2-3.5mm² THHN Cu.
C=617
2-3.5mm²
THHN
Cu.
LOAD
C=617

Sc

E SHORT CIRCUIT DIAGRAM


06 01

d c

Sd
*PEC 2017; 2.10.1.11
FOR DWELLIING UNITS HAVING
A FLOOR AREA NOT MORE 50
E GROUND FLOOR LIGHTING LAYOUT
01 01 02
E
01
GROUND FLOOR POWER LAYOUT
SQ. METERS AND
NOT MORE THAN 3680VA.

GENERAL NOTES AND SPECIFICATIONS


1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PHILIPPINE ELECTRICAL CODE,
SERVICE ENTRANCE 25m
WITH THE RULES AND REGULATIONS OF NATIONAL AND LOCAL AUTHORITIES CONCERNED IN THE ENFORCEMENT 47m
230V, SINGLE PHASE 60HZ
OF ELECTRICAL LAWS AND WITH THE RULES AND REGULATION OF THE UTILITY COMPANY CONCERNED. SERVICE
ENTRANCE
2. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF THE CONCRETE TERMINAL 230v,60HZ, 1Ø
POLE FOR CONNECTION TO THE POWER SUPPLY AND TELEPHONE SERVICE. 0.36%
0.15%
3. ALL INSTALLATION SHALL BE CONCEALED FROM VIEW, WIRING SHALL BE ENCASED IN PB FARTHEST OUTLET
2-3.5mm² THHN Cu. WIRE POLYVINYL CHLORIDE (PVC) SCHEDULE 40 EXCEPT POWER AND TELEPHONE SERVICE ENTRANCE
20mmØ PVC WHICH SHALL BE IN RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.
4. MINIMUM WIRE AND CONDUIT SHALL BE 2.0 sq.mm THHN FOR LIGHTINGS OUTLETS AND 3.5 sq.mm THHN
for POWER OUTLETS IN 20mm TRADE SIZE, RESPECTIVELY UNLESS OTHERWISE SPECIFIED.
5. PULL BOXES OF APPROPRIATE SIZES SHALL BE PROVIDED, EVEN IF NOT INDICATED IN DRAWINGS TO
ACCOMODATE THE NUMBER OF SPLICES OR WIRES.
THE COMPUTED VOLTAGE DROP OF PROPOSED "PROPOSED
6. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE FOR BOTH
LOCATION AND INTENDED USE.
RESIDENTIAL DWELLING" WITH THE TOTAL OF 0.51 PERCENT
(%) OF VOLTAGE DROP MEET THE REQUIRED ALLOWABLE VD
7. ELECTRICAL INSTALLATION SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY
LICENSED ELECTRICAL ENGINEER. OF THE PHILIPPINE ELECTRICAL CODE 2017 EDITION {2.15.1.2
3.5mm² THHN (A)(1)(b) FPN No. 2} PP.51
Cu. CONDUCTOR

E SINGLE LINE DIAGRAM E VD LINE DIAGRAM


03 01
05 01

SIGNED AND SEALED: SUPERVISION IN CHARGE: DRAWN BY: CHECKED BY: DATE: PROJECT TITLE: OWNER: SHEET CONTENT: SHEET NO.
SHEET DWG. NO. PAGE NO.
KYLE RENZO V. GALAPON
ELECTRICAL ENGINEER ELECTRICAL ENGINEER "AS-BUILT OF A RESIDENTIAL DWELLING" Erica Dolor Tabigne Reyes
N : PTR No.: N : PTR No.: NV REVISED BY: CHECKED BY: DATE:
AS SHOWN REVISION NO. REVISION DATE
VALID UNTIL: ISSUED ON: VALID UNTIL: ISSUED ON: SCOPE OF WORK: ELECTRICAL
TIN No.: ISSUED AT: TIN No.: ISSUED AT: A N NU VI USE/CHARACTER OF OCCUPANCY: RESIDENTIAL
LOCATION: SALCEDO, ILOCOS SUR ADDRESS: SALCEDO, ILOCOS SUR
SIGNED AND SEALED: SUPERVISION IN CHARGE: DRAWN BY: CHECKED BY: DATE: PROJECT TITLE: OWNER: SHEET CONTENT: SHEET NO.
SHEET DWG. NO. PAGE NO.
KYLE RENZO V. GALAPON
ELECTRICAL ENGINEER ELECTRICAL ENGINEER "AS-BUILT OF A RESIDENTIAL DWELLING" Erica Dolor Tabigne Reyes
N : PTR No.: N : PTR No.: NV REVISED BY: CHECKED BY: DATE:
AS SHOWN REVISION NO. REVISION DATE
VALID UNTIL: ISSUED ON: VALID UNTIL: ISSUED ON: SCOPE OF WORK: ELECTRICAL
TIN No.: ISSUED AT: TIN No.: ISSUED AT: A N NU VI USE/CHARACTER OF OCCUPANCY: RESIDENTIAL
LOCATION: SALCEDO, ILOCOS SUR ADDRESS: SALCEDO, ILOCOS SUR