Professional Documents
Culture Documents
9204-BP12A-MMJV-SDW-FE-P2-000-02035_230615_042035
9204-BP12A-MMJV-SDW-FE-P2-000-02035_230615_042035
9204-BP12A-MMJV-SDW-FE-P2-000-02035_230615_042035
Rope access
bracket
1500
LVL +31.53 m
1500
6210
KEY PLAN
NOTES:-
1500
5
4
1500
2
1500
LVL +27.03 m
1500
9000
COURTYARD Drawing Approval Status
1500
A - APPROVED
(Consultant / Contractor May Proceed)
Name :
ARCHITECTURAL
COMPANY
MMJV
INITIAL SIGNATURE DATE
ELECTRICAL
MMJV
MMJV
AE 8 8 MECHANICAL
OTHERS
MMJV
1500
REFERENCES
PHASE DRAWING NUMBER TITLE Rev. DATE
IFC
9204-BP12A-MMJV-REP-FE-NS-000-01801
9204-BP12A-MMJV-IFCD-FE-NS-000-01500
PODIUM FACADE ACCESS AND MAINTENANCE REPORT
R.000
08-03-2022
21-12-2021
325
1500
6210
LVL +31.36 m Rope access bracket REVISIONS:
1500
760
160 001 19-06-2022 ISSUED FOR APPROVAL NZ FVG KCH
1500
435
Stage:
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 5001000 1500 1500 1500 65x65x10
SHOP DRAWING
800
PM/CM :
365
1 : 40 05 06
Main Contractor :
9204-BP12A-MMJV-CAL-FE-NS-000-00411
4 4 Insulation (indicative)
Sub-Consultant:
LVL +31.12 m
SECTION-1
94 94 4 1:5
435
Project Name:
LUSAIL PLAZA TOWERS PLOT A (BP12A)
Drawing Title:
200
Bracket Finish : Hot dip galvanized, C5M protection system Approved: KCH Date: 30/05/2022
5 1:5 Sheet : 1 of 1