Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

JOB SAFETY AND ENVIRONMENTAL ANALYSIS WORKSHEET

Work Activity: CAMERA INSTALLATION AROUND PLANT JSA Protocol No: -JSA-01-24-395
Issued Date: 02/01/2024
CONTRACTOR Name: Revalidation Date: 01/04/2024
(To be Reviewed after 90 days)
JSA Work Team: Const. and HSE
JSA Team Members: Project Site
Task Location:
Area:
➢ Is a site visit to the job location required - Yes/No (*)Yes ➢ Is everyone trained qualified to do the work - Yes/No (*)Yes
➢ If it is confined space entry job they have all issues as per confined space (*) Need to answer to these questions!!!
procedure been considered / addressed? Yes/No (*) No
Sequence of Basic Job steps Potential Incidents or Hazards Way to Eliminate or reduce potential Hazards
List the task required to perform Against each task list the hazards that could List the control measures required to eliminate or minimize the risk of injury arising from the
S.N.
the activity in the sequence they cause injury when the task is performed identified hazard
are carried out
Mobilization of site ➢ Unauthorized entry to site/TCF ➢ Verified medically fit, EHS induction trained, Issued with CONTRACTOR Site ID Card
personnel, vehicle, and ➢ Incident related to COVID-19 ➢ Ensure SDF (Self Declaration documented/vaccinated, perform daily thermal scan
equipment’s. infection ➢ Follow the protocol on COVID-19 EHS Procedure and the local regulations
➢ Interference from site works ➢ Ensure to obtain PTW, apply with this JSA and conduct STARRT card
➢ Incident with unauthorized driving ➢ Ensure to use contact and emergency numbers, copy of site layout and directions.
➢ Incident with unauthorized vehicle ➢ Ensure all vehicles an3d drivers are verified by Contractor, certification as competent,
➢ Incident involving substandard identified.
1. 1 hygiene practice risk on health ➢ Rescue plan to be included in PTW, when required.
➢ Injury on unprotected persons ➢ Competent person checked, verified with valid inspection sticker, daily checklist done
➢ Lack of communication ➢ Provision of portable toilet, hand wash area, control of eating on site by arrangement
➢ Non-compliance with project ➢ Provision of temporary facilities with power supply for AC, food area, and water,
procedure ➢ Fire control assigned a smoking area approved by CONTRACTOR
➢ Unawareness of emergency ➢ Provision of portable toilets of adequate size and capacity
procedures. ➢ Provision of prayer area
Camera installation around Plant Page 1 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Incompetent Personnel ➢ Presence of close supervision, supervisor and EHS stay in worksite
➢ Lack of Access or Egress ➢ All people on site shall wear and use the mandatory standard PPE such as
➢ Poor housekeeping • White helmet for supervisor/foreman/engineers/managers with chin straps
• Yellow helmet with chin strap -workers, skills, non-skill, drivers, visitors, vendors
• Red helmet with chin strap - EHS personnel
• Long sleeve coverall with high visibility reflectors
• Safety boots Class S3
• Safety Glasses (dark lens for outdoor/ clear lenses for indoor activity)
• Appropriate type of hand gloves (see PPE Matrix, consult SDS)
• Respiratory protection (non-surgical mask for COVID-19 and as work requires)
• Hearing Protection as required in noisy area above 85dBA
• Appropriate Personal Fall Arrest Equipment as required (No safety belt)
➢ Ensure all personnel have attended the Project Safety Orientation and required
Safety awareness training prior to mobilization at site.
➢ Ensure Method statement and JSA has been reviewed and approved by / PMC
➢ JSA content shall be explained to the work crew by the supervisor and ensure they
clearly understand it prior commencement of the work
➢ Everyone must know the emergency assembly point and emergency contact
numbers to be posted in the work area.
➢ Ensure that competency of all personnel is verified prior to performing the operation
and ensure that the operators are having the valid third-party and appropriate
certification with them.
➢ Selection of adequate equipment for the operation, ensure that the required
certification and inspection is valid and available, and equipment is used as per
Manufacturers recommendation
➢ Ensure that they have an adequate welfare facility (Rest shelter, drinking water
station and toilet etc.)
➢ Work Area shall have adequate barricade with safety signage’s board for awareness
➢ The area shall be cordoned off with red and white barriers and post warning signs to
avoid unauthorized entry
➢ Adequate housekeeping shall be done prior to starting the work
➢ Ensure the provision of adequate PPE for risk reduction.

Camera installation around Plant Page 2 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Suspended trauma strap is required for scaffolding activities where is the risk of
suspension.
Provide adequate access and egress and make sure all unwanted materials are
removed from the access
Manual Handling Activities. ➢ Repetitive lifting ➢ Follow manual handling techniques and maintain proper body posture while doing
➢ In adequate access manual handling activity of 25 kg max.
➢ Sharp Edges ➢ Wherever possible, a reduction in the amount of heavy manual handling must be
➢ Lifting and carrying on uneven and / sought by providing adequate mechanical means.
or slippery ground conditions ➢ Rotate tasks between workers.
➢ Home-made tools ➢ Practice routine and repetitive breaks.
➢ Inadequate supervision
➢ Pinch Point ➢ All involved workers shall attend manual handling training.
➢ Wear leather hand gloves when handling any materials or objects. Where an object
requires two or more employees to handle it, one employee should give the
direction for lifting and lowering the object in unison. Never attempt to lift beyond
2. your capacity. If in doubt test the objects’ weight before handling it: if it appears too
heavy or bulky, obtain a mechanical lifting aid and/or somebody to help.
➢ Adequate access shall be provided and make sure access is clear from any
obstruction.
➢ Do not use any homemade tools.
➢ Continuous supervision and safety coverage shall be ensured throughout the
operation
➢ Identify the possible pinch point.
➢ Keep the body part out of line of fire

Mobilization and used of ➢ Improper arrangement of materials/ ➢ Designate areas for materials and equipment’s / tools
hand tools & tools ➢ Only approved equipment’s and color-coded tolls shall be utilized
Power tools ➢ Sharp edges ➢
3. Maximum care shall be taken while handling sharp edged materials by using leather
➢ Incompetent workers
gloves and train persons to avoid pinch points.
➢ Defective tools
➢ Untrained worker

Camera installation around Plant Page 3 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Home-made tools ➢ Proper barricade with signs to be provided around the materials storage area to
➢ Defective tools protect from injury.
➢ Electrocution ➢ Trained and certified flagman should be assigned to guide and control trailer truck
➢ Rotating parts movements.
➢ Not trained to operate power tools
➢ Vibration ➢ Flagman must wear a red high visible jacket and to have a red and green flag with
➢ Noise him during the daytime and a red and green glow sticks must be used at nighttime
➢ Flying objects/particles ➢ Ensure Safe work platform is provided & tagged correction
➢ Inspect tools before use
➢ Defective hand tool shall be removed from the site
➢ Kept the minimum required material in elevated platforms. Storage to be done on
ground level.
➢ Use proper tools and never use home-made tools
➢ Never play with tools and use tools for what it made for.
➢ Ensure that the hand tools are free from any defects and color coded as per the
procedure
➢ Ensure that the power tools are certified inspected by a competent person and color
coded as per the project procedure
➢ Ensure that the cables are free from any defects and the power source shall be
equipped with ELCB or GFCI
➢ Ensure that the dead-man switch is working properly
➢ The cables shall be elevated at least 2.1-meter height to avoid tripping hazard
➢ Kept the minimum required material in elevated platforms. Storage to be done on
ground level.
Work preparation ➢ No clear access to work area ➢ Provide proper access to work area. Secure proper scaffolding platform to all work
➢ No proper work platform area accessible to work locations.
➢ Insufficient lighting ➢ Clear access walkways do not block access with materials.
➢ Work at heights ➢ Provide gin wheel to transfer materials to elevated platform.
4. ➢ Incomplete tools ➢ Provide barricade to work area.
➢ Incorrect PPE available ➢ Check all required tools for the work
➢ Untrained workers ➢ Ensure to provide all necessary PPE requirements for the work.
➢ SIMOPS ➢ Involved workers with full experienced and trained workers to perform the work.
Camera installation around Plant Page 4 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Work related hazards ➢ Plan the work and coordinate with other Supervisor working around the area.
➢ Conduct STARRT meeting, discuss work related hazards and recommendations to
eliminate all identified hazards.
Camera installation ➢ Fall of materials and tools ➢ Ensure to secure all tools and equipment
➢ Pinch points ➢ Always keep hands away from stationary objects
➢ Work at heights ➢ Always secure harness to correct anchorage points
5. ➢ Property damaged ➢ Provide flagman to control the traffic when working along the road
➢ Traffic ➢ Barricade the working area

Lifting, shifting, loading, and ➢ Defective/Uninspected equipment ➢ Ensure compliance with 0000000133 (rev B) - HSE Crane and Lifting Procedure –
unloading and installation of ➢ Incompetent operator & Rigger IS00 and fulfill checklists in appendices.
solar panel and other ➢ Defective/uninspected Lifting gears ➢ In the case of a Standard-lift with wind speed superior to 10m/s within the
materials and tackles maximum wind speed “No activity to continue unless permit meets the
➢ Damaged or defective ladder requirements & is countersigned by Lifting supervisor”. In case of winds superior
➢ Pinch point to 10 m/s, Lifting Supervisor will inform lifting Engineer regarding # cranes that
➢ Adverse weather condition suspend activities; # cranes that are holding/ in retrieving process (waiting to
➢ Uncontrolled movement of load have the load in safe condition); and # number of cranes that will continue and
➢ Unstable ground condition activities that are performing. lifting Engineer can come to site to check
➢ Poor communication conditions and countersign the Lifting PTW but isn’t a requirement to proceed
➢ Unauthorized entry
with the activity.
6. ➢ Lifting besides the road
➢ Required Lifting Assessment Form properly filled by crane operator and Rigger
➢ Obstructed access
Level 1 or 2
➢ Working under the load
➢ Not trained operator ➢ (Rigger Level 2 needs to understand and write in English)
➢ Overloading the transport vehicle ➢ No Heavy Lifts or Critical lifts will be done with more than 10m/s or maximum
➢ Failure to follow rigging approved wind speed recommended by manufacture (most restrictive will be applied)
rigging plan. ➢ If Crane Operator will not be able to see either the load or the signal man
➢ Unsecured load. due to adverse weather affected by fog, sandstorms, heavy rain etc crane
➢ Fall from trailer or ladder operation will be stopped or suspended.
➢ Fall of equipment Hight wind speed. The first rule is that each type of crane is specific; therefore,
➢ Unexpected movement of load the limitations due to wind velocity are to be checked for each crane inside the
during lifting manufacturer's manual. Crane operations shall be suspended when the wind

Camera installation around Plant Page 5 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Incorrect attachment for lifting speed reaches the maximum wind speed as per manufacture; lifting above
shackles restrictions of percentage of weight / wind speed or 14m/s (the most restrictive to
➢ Un controlled load be applied)
➢ Damaged to equipment ➢ Crane and lifting equipment shall have a valid all certificates as per Law and project
➢ Defective/Uninspected equipment requirements.
➢ Incompetent operator & Rigger ➢ Ensure ground condition is proper compacted and leveled prior to position the crane.
➢ Defective/uninspected Lifting gears ➢ Keep distance from excavation and powerlines.
and tackles ➢ Crane to be inspected and approved by prior mobilization at site
➢ Damaged or defective ladder ➢ Follow daily crane inspection checklist prior commencing work.
➢ Pinch point ➢ All warning devices to be checked
➢ Adverse weather condition ➢ Defective or damage to be reported and not to be use.
➢ Uncontrolled movement of load ➢ Regular maintenance and servicing to be carried out in accordance with
➢ Unstable ground condition manufacturer’s specification and project requirements.
➢ Poor communication ➢ Operator shall possess valid Saudi Arabian operating license along with 3rd party
➢ Unauthorized entry certificate.
➢ Lifting besides the road ➢ Riggers shall have a valid third-party certification according to Project Procedure
➢ Obstructed access ➢ Use as maximum 80% capacity of the crane and lifting accessories as per SWL and
➢ Poor judgment leads to accident specific configuration.
➢ Failure of lifting operation ➢ Make sure that lifting gears and tackles are in good condition, inspected and color
➢ Fall injury coded.
➢ Line of fire ➢ Conduct visual inspection for all lifting gears and tackles prior using it. Do not used
➢ High Wind velocity defective lifting gears and tackles.
➢ Hit to adjacent equipment ➢ Employees climbing the trailer truck shall use inspected ladder and maintain three-
➢ Toppling point contact while ascending and descending the ladder
➢ Failure of operation ➢ Ladder shall be in good condition, inspected and color coded.
➢ Slip/trip/fall ➢ Identify all pinch point hazard and wear adequate leather hand gloves to eliminate
➢ SIMOPS the hazard.
➢ Blind spot ➢ Tag lines of no less than 16mm natural fiber rope or equivalent are to be used as
➢ Oil leakage necessary to control load sway.
➢ Vehicle collision ➢ Loads should have attached 2 taglines with 2 tagline controllers.
➢ Lifting near excavation ➢ Make sure the load is balanced and not top heavy.
➢ Lifting near building and existing ➢ The area shall be levelled and compacted prior positioning the crane.
equipment
Camera installation around Plant Page 6 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Means of adequate communication shall be implemented in between rigger and


crane operator.
➢ Use whistle to vigilant nearby workers before commencing lifting operation.
➢ Do not use curtain in operator cabin. Make sure that a clear visibility available in
between operator and rigger
➢ Lifting radius shall be barricaded and to avoid unauthorized entry and post warning
signs like “DANGER: CRANE LIFTING IN PROGRESS”
➢ If the lifting activity is carrying near an adjacent road, barricade the area and assign
a trained and certified flagman for controlling the vehicle.
➢ Adequate access shall be provided and make sure the access is clear from any
obstruction.
Work at lower height activity ➢ Fall below 1.8-meter height ➢ Ensure assigned supervisor identified all the risk of fall on their work area.
➢ Fall from uneven surface ➢ Provide proper working platform to execute the work safely.
➢ Fall from unsecured platform ➢ Provide steps to access platform.
➢ Provide protection railing.
7. ➢ Work on level ground
➢ Clean work area.
➢ Clear access from obstruction.
➢ In case that the potential of the consequence its high; follow Work at Heights
procedure.
Simultaneous Operations ➢ Work interference / clash ➢ Identify the additional hazards introduced by the SIMOPS.
(SIMOPS) ➢ Overhead ➢ Assess the relevant level of risk.
8. ➢ Road closure ➢ Verify the adequacy of the planned control measure
➢ Area not properly barricaded ➢ Identify additional risk reduction measures.
➢ Provide input to Permit-To-Work process for embedding additional controls
Work at height activity ➢ Fall of men and material ➢ All the job steps included in JSA and all hazard associated with that job must be
➢ Structural collapse discussed with the involved crew
➢ Untrained workers ➢ Used of inertia reel / YOYO / retractable lanyard to limit the fall and to reduce the
9. ➢ In adequate supervision fall arrest forces during fall as required in work condition.
➢ Tripping hazard ➢ All workers must be used inspected and color-coded safety harness above 1.8 MT
➢ Obstructed access height
➢ Unsecured tools
Camera installation around Plant Page 7 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Un secured drop zone ➢ 100% tie off policy shall be followed working at elevated area with proper fall
protection.
➢ Elevated work shall be suspended if the temperature reaches above 50˚C and with a
wind speed of 9 m/s.
➢ Inertia reel (Self retractable fall arrestor) shall be in good condition, having valid 3rd
party certificate, inspected and color coded by authorized person.
➢ Ensure proper anchor points are available for both full body harness and inertia reel
and anchored it properly.
➢ Ensure only trained and competent workers are performing activity on the top of
scaffold.
➢ All employees Involve in job must have working at height and hand and power tool
➢ Adequate supervision required by a competent supervisor
➢ Avoid keeping of unwanted/ excessive material on the top of platform to avoid
tripping hazard.
➢ Make sure the access is clear from any obstruction
➢ Tool belt and lanyard shall be used and ensure all tools are properly secured to
prevent from fall.
➢ All tools must be inspected and color coded by a competent person.
➢ Adequate signs shall place for the information to nearby workers.
➢ Use 3rd party certified Gin wheel (pulley), rope and bucket to get the material on the
top of scaffold and lowering.
➢ Maintain 3 point of contact while ascending and descending
➢ Ensure ladder is in in good condition and color coded as per project standard .
➢ Drop zone must be barricade and post warning signage’s.
Extended working hours ➢ Shadows due to improper ➢ Arranged sufficient light to eliminate shadows. (Not less than 100 lux)
(work after dark) positioning ➢ Illumination plan shall be submitted to 24 hrs. before and obtain the approval prior
➢ Lack of proper illumination. performing extended hours
Note: No heavy lifts forecasted Visibility, glare, and other lighting ➢ Position light in sufficient distance to avoid glare.
10. to be done in dark hours issues ➢ Supervisor and safety personnel must check the illumination to ensure proper
➢ Insufficient light visibility.
➢ Presence of Wildlife. ➢ Obtain extended hours work permit. Coordinate all activities TCM Supervision.
➢ Used of dark safety glasses ➢ Keep distance. Keeping the area clear of food. Maintain good housekeeping.

Camera installation around Plant Page 8 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Lifting activity ➢ Ensure to secure clear safety glasses for all workers working on extended hours.

Working on night shift. ➢ Poor or improper Illumination/ Low ➢ Sufficient illumination shall be provided.
visibility ➢ Position light coherently to eliminate shadows.
➢ Working against the normal ➢ Position light in sufficient distance to avoid glare.
biological cycle (Sleep
➢ The lighting / illumination shall be marked on a plot plan and work shall be stopped
deprivations,fatigue, etc.)
➢ Lack of supervision, Lack of PPE, if sufficient illumination is below 100 lux.
Poor judgment. ➢ Check cables and connectors for damage and insulation
➢ Presence of Wildlife ➢ Remove all flammable materials from near to the light point
➢ Provide trained banks men/flagman to direct the movement of vehicles &
equipment’s
➢ Ensure High visibility reflective vest and light sticks shall be used to signal the
11.
vehicles
➢ Reflective visibility vest shall be mandatory to all involved personnel.
➢ Clear safety glasses are mandatory to be worn by all involved personnel during
extended time of work.
➢ Good adequate lighting shall be provided to the pedestrian access
➢ Plot plan shall be followed according to the position for all illumination.
➢ Sufficient warning lights shall also be allocated in specific areas to warn the works
being carried out in the area.
➢ Keep distance from wildlife. Be alert from snake, scorpion and wild dogs.

Waste management and ➢ Poor housekeeping ➢ Reference made to section 10.3 of the Method Statement submitted, provisions for
Housekeeping ➢ Obstructed access a temporary holding tank and the preparation of a temporary evaporation must be in
➢ Contaminated Water place.
➢ Waste disposal.
12. ➢ Oil spillage/leaks from equipment.
➢ Any water intended to be reused for any reasons must be sent for analysis first for
Flying objects viability and if found not acceptable shall be transferred to a wastewater treatment
➢ material package label facility. Disposal records must be recorded and supporting documents uploaded to
SharePoint on a monthly basis. NOTE: Under no circumstance shall hydrotesting
Camera installation around Plant Page 9 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

water be discharged to storm water channels, coastal receiving waters or harbor


receiving water without prior authorization from the Royal Commission. This
complies to Royal Commission Environmental Regulations of 2015, Volume I
(Section 3.3.3
➢ Use of appropriate PPE’s.
➢ Material must be kept clear from access (material storage area)
➢ Make sure proper housekeeping is done after completion (housekeeping to be
maintained before work starts alternatively for during the work and after work)
➢ Supervisor and safety personnel must closely monitor the work crew.
➢ After the work completion, clean the waste/ spill of concrete from the project area.
➢ Gradually depressurize the line
➢ Separate skip bins only for chemical waste & hazardous substances must be
available.
➢ Implement full segregation & collection of waste materials.
➢ Provide spill skits. Collected oil waste and rugs to be disposed properly.
➢ All empty baggage is collected in garbage bag and disposed of it at waste bin
➢ Removed all package labels prior to disposal.
➢ Disposed of all waste materials as per project requirements.
Working in Extreme Weather ➢ Heat related illness ➢ Foreman/Supervisor shall conduct TBT, explain about heat related illness and
➢ High Humidity ➢ Working under direct sunlight syndromes, ensure that workers are understood.
➢ Fog ➢ Unmanaged work personnel. ➢ Provide adequate number of rest shelters for the employees, provide pedestal fans
➢ Rain ➢ Insufficient fluid intake inside the heat stress rest shelter
➢ Thunderstorm ➢ Visibility (Sandstorm / Fogs /
➢ Strong Winds ➢ Cool drinking water shall be provided at the workplace and advise workers to drink
Rain)
13. ➢ Lightning strike plenty of cool water at short intervals
➢ Flooding ➢ Educate the workers that avoid drinking of Alcohol, Carbonated and Caffeinated
beverages during summer season.
➢ Wear loose cotton cloth
➢ Elevated work shall be suspended if the temperature reaches above 50˚C and
strong wind speed of 9 m/s.

Camera installation around Plant Page 10 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ At emergency contact the concerned person and shift the victim to the clinic as
early as possible.
➢ Follow the flag system
➢ Job rotation of personnel to be planned on summer vacation
➢ Report all incidents, accidents and near misses.
➢ 12 pm to 3 pm no work permitted under direct sunlight from 15 June to 15
September
➢ Lifting activities are suspended during strong winds reaching to 10 m/s
➢ Stopped / suspend work during zero visibility. No lifting and elevated works
➢ Ensure all working at heights and crane operations are suspended during
thunderstorm
➢ Head lights ON in case of low visibility
➢ Foreman/Supervisor shall conduct TBT, explain about cold related illness and
syndromes, and ensure that workers are understood.

Health ➢ Sleep deprivation ➢ Workers must be urged to develop a regular sleep pattern including at least seven
(Including Night Work) ➢ Fatigue/Stress. to eight hours sleep. Workers that are about to start/end night shift activities shall
Note: No heavy lifts forecasted ➢ Covid19 and project health have to
to be done in dark hours requirements included in
➢ Have a short sleep before their first night shift.
Mobilization) point
➢ Heat related illness ➢ Have a short sleep after coming off night shifts and go to bed early that night.
14. Working under direct sunlight ➢ Rotation in shifts each 2 weeks
➢ Unmanaged allotted work personal ➢ Allow workers to have regular rests throughout their shift
➢ Insufficient fluid intake ➢ Rest days should be distributed throughout the roster cycle to allow recovery and
recuperation before fatigue becomes acute.
➢ Comply with Labor Law with respect to working hours.

Waste management ➢ Flying objects ➢ All empty baggage is collected in garbage bag and disposed of it at waste bin
15. ➢ material package label ➢ Removed all package labels prior to disposal.
➢ Waste materials.

Camera installation around Plant Page 11 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ Poor housekeeping. ➢ Disposed of all waste materials as per project requirements. Material must be kept
➢ Obstructed access clear from access (material storage area)
➢ Water used from leak testing and ➢ Make sure proper housekeeping is done after completion (housekeeping to be
hydrotesting activity maintained before work starts alternatively for during the work and after work)
➢ Supervisor and safety personnel must closely monitor the work crew.
➢ After the work completion, clean the waste/ spill of concrete from the project area.
➢ Segregation of waste as per classification must be observed at all times.
➢ Follow MS procedure for water disposal used during testing activity
Waste management and ➢ Poor housekeeping ➢ Reference made to section 10.3 of the Method Statement submitted, provisions for
Housekeeping ➢ Obstructed access a temporary holding tank and the preparation of a temporary evaporation must be in
➢ Contaminated Water place.
➢ Waste disposal.
➢ Any water intended to be reused for any reasons must be sent for analysis first for
➢ Oil spillage/leaks from equipment.
➢ Flying objects viability and if found not acceptable shall be transferred to a wastewater treatment
➢ material package label facility. Disposal records must be recorded and supporting documents uploaded to
SharePoint on a monthly basis. NOTE: Under no circumstance shall hydrotesting
➢ water be discharged to storm water channels, coastal receiving waters or harbor
receiving water without prior authorization from the Royal Commission. This
complies to Royal Commission Environmental Regulations of 2015, Volume I
16. (Section 3.3.3
➢ Use of appropriate PPE’s.
➢ Material must be kept clear from access (material storage area)
➢ Make sure proper housekeeping is done after completion (housekeeping to be
maintained before work starts alternatively for during the work and after work)
➢ Supervisor and safety personnel must closely monitor the work crew.
➢ After the work completion, clean the waste/ spill of concrete from the project area.
➢ Gradually depressurize the line
➢ Separate skip bins only for chemical waste & hazardous substances must be
available.
➢ Implement full segregation & collection of waste materials.
➢ Provide spill skits. Collected oil waste and rugs to be disposed properly.

Camera installation around Plant Page 12 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

➢ All empty baggage is collected in garbage bag and disposed of it at waste bin
➢ Removed all package labels prior to disposal.
➢ Disposed of all waste materials as per project requirements.
Actions during emergency ➢ Sandstorm / storm ➢ In any case, activate and follow the project Emergency response plan.
➢ Injury or cute illness ➢ all the emergency number 055-502-0348 and seek help. Report to EHS Manager
➢ Plant evacuation and emergency and Supervisor.
➢ Rescue of person.
➢ Stop all the activity during inclement weather, sandstorm, high wind, rain and
➢ Asset damage
thunderstorm with lightning, use wet weather gear when required to perform urgent
➢ Declare Emergency at site
17. rescue actions during the wet weather,
➢ In case of injury / health issue, First Aider is activated. Call for help to activate the
ambulance to reach the location.
➢ Leave the equipment and materials in safe condition.
➢ Stop all activities and follow evacuation procedure
➢ Proceed to Muster point

Notes:
❖ Any changes in the working condition that are not mentioned to this JSA, work should be suspended, reassessed the hazards and identified the recommendation to eliminate it. Conduct
STARRT Meeting among workers.
❖ In case of any unsafe condition, suspend the activity and inform Supervisor and reassess the findings.

Camera installation around Plant Page 13 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395
CONTRACTOR IDENTIFICATION CODE

Job Safety Analysis REV.00


OWNER IDENTIFICATION CODE

LOCATION: PROJECT:
JUBAIL, KINGDOM OF SAUDI ARABIA

Specific prevention and protection measures:


All Hazards and the Mitigation measures reported in the JSA shall be discussed with the working crew by Supervisor/ Foreman and attendance sheet to be signed only at beginning of the work
activity. Later, on daily basis, the STARRT Meeting shall be done prior to the activity start and card to be signed by all participants.

Task Supervisor HSSE Representative CONTRACTOR HSSE Manager


Issued Checked Approved

Signature
Name

ID. No: IT / Supervisor HSE Manager

Specific prevention and protection measures:


All Hazards and the Mitigation measures reported in this JSA has been discussed with the working crew by Supervisor/ Foreman and the below reported attendance sheet has been signed
(only at beginning of the work activity). Later, on daily basis, the STARRT Meeting shall be done prior to the activity begin and Card to be signed by all participants.

Pos. # Attendant Name & Surname Trade Signature


1
2
3
4
5
6
7

Supervisor Name & Signature Date:

Camera installation around Plant Page 14 of 14 | Date: 02/01/2023 JSA Protocol No: JSA-01-24-395

You might also like