Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEXICON:

LINE OF WALL ABOVE

AREA OF SHEARWALL PER SCHEDULE


WHITNEY ARCHITECTURE

(Sistered)

(Sistered)

(Sistered)
(N)2x4's

(N)2x4's

(N)2x4's
INDICATES JOIST DIRECTION
11 7/8" TJI 110
(3) 2 x 10 HDR
@ 16" O.C. INDICATES EXTENT OF FRAMING

2x8 MIN. @
1537 NW Ballard Way Seattle WA 98107

24" O.C.
WhitneyArchitecture.com
X DETAIL REFERENCE, INDICATES

(2) 2 x 10 HDR
v. 206.789.3934 f. 206.789.1871
3'-113 4"
(2) 2x8's (2) 2x8's (2) 2x8's X0.00 DETAIL NUMBER & SHEET NUMBER

SW3 HA
NG

SHEARWALL LENGTH
HU ER
SHEARWALL LENGTH
412
(N) 2 x 6's INDICATES SIMPSON HANGER

11'-81 8"
(N) 2 x 6's OPEN OPEN OPEN

SW1
@ 24" O.C.
@ 24" O.C.
H D HOLD
U2 O
SD WN
S2
.5 INDICATES SIMPSON HOLDOWN
(2) 2 x 10 F.B. w/ (2) 2x8's (2) 2x8's (2) 2x8's
HANGER EACH END
7 S8.01
6 MS
ST
RA
T48
P
INDICATES SIMPSON FRAMING STRAP Archer-Graham

(5
S8.01

) 2 ST
Residence

P
x4
O
CONTINUOUS LSL 3 1/2"x
11 7/8" @ TOP OF WALL PSL 7x 11 7/8" DROPPED
FH. FLUSH HEADER
4 x6
2x ) 2 ST

SHEARWALL
) T FB. FLUSH BEAM

3'-101 2"
(5 POS (4 PO

LENGTH

(2) 2 x 8
SW1

HDR
SHEARWALL KEY - REFER TO
SW1 SHEARWALL SCHEDULE

PRE MFG. GIRDER TRUSS

SHEARWALL LENGTH
24" O.C.
2x4's @

3'-71 2"

SW1
TRUSSES

BOTTOM CHORD OF ATTIC TRUSSES


(2) 2 x 8 HDR

TRUSSES
(N) 2 x 4's
(Sistered) 2x8 @ WOOD FRAMING PLAN NOTES A remodel and addition to an existing

OF ATTIC
24" O.C. 2x10 @ 16" O.C. W/ HANGER EACH END single-family residence at:

(2) 2 x 8
1. All engineered lumber shall be protected from rain

HDR
OF ATTIC
and kept dry throughout the construction process. All
long spans and cantilevers shall be supported

24" O.C.
without deflection until the building is dried in.

2x4's @

CHORD
6556 21st Ave NW

CHORD
2. Joists, beams, and headers shall only be drilled, cut,

GIRDER TRUSS
or notched in strict accordance with the

BOTTOM
SHEARWALL LENGTH

PRE MFG.
manufacturer's specifications.

SHEARWALL LENGTH
BOTTOM
3. Roof sheathing shall be 15/32" APA rated sheathing

5'-11 4"

SW1

6'-10"

SW1
with a panel index of 24/0. Nail to framing with 8d
common nails at 6" o.c. at panel edges and 12" o.c.
in field unless noted otherwise on plans.
11 (2) 2 x 10 BEAM
S8.02 3 4. Typical floor sheathing shall be 23/32" APA

( 5 ST

ST
x4
PO
REGISTERED

PO
Sturd-I-Floor with a panel index of 40/20. Nail to

)2
S8.01
framing with 10d common nails at 6" o.c. at panel 6406

?
ARCHITECT

SHEARWALL LENGTH
3 edges and 12" o.c. in field unless noted otherwise on
S8.01 plans. Floors have not been designed for concrete

2'-105 8"
2x10 @ 16" O.C. topping.

SW1
W/ HANGER 3'-01 8" PAUL ALLEN WHITNEY
(2) 2 x 10
EACH END STAIR OPENING 5. All headers and beams shall be (2) 2x8 minimum,

(2) 2 x 10
SW2 unless noted otherwise on plans. Refer to note 4 for STATE OF WASHINGTON

BEAM
HDR
support requirements.

PRE MFG. GABLE END TRUSS

(2) 2 x 8
SHEARWALL

HDR
LENGTH
6. Hardware such as holdowns, straps, and hangers
are designed to be by Simpson Strong-Tie

CONTINUOUS LSL 3 1/2"x


11 7/8" @ TOP OF WALL
8'-23 4" (2) 2 x 10 BEAM Company, Inc.

SHEARWALL LENGTH
SHEARWALL LENGTH 7. All columns shall be double stud minimum, unless

4'-37 8"
noted otherwise, with the beam or header bearing

SW1
SW2
1 (2) 2 x 10 HDR
fully on the column. Individual studs shall be nailed
together per the general structural notes.
8. Epoxy dowel all new horizontal reinforcing into
2 existing footings. Minimm embedment 4".
2x10 @ 16" O.C. W/ HANGER EACH END S8.01
9. See sheet S1.01 for general wood framing notes. Date Mark Issue Type
SHEARWALL LENGTH

FLOOR
FRAMING
5
SW1

(2) LVL 1 3/4"x 9 1/4" HDR


S8.01
2x4's @ SEISMIC HARDWARE NOTES
11'-71 2"

24" O.C.
1. All seismic hardware, holdowns, and framing straps
shall be installed per manufacturer's instructions &
specifications. Hardware is designed to be by
CONTINUOUS LSL 3 1/2"x Simpson Strong-Tie Corporation, Inc.
11 7/8" @ TOP OF WALL PSL 7x9 1/4" DROPPED
(2) 2 x 8 HDR 2. Simpson HDU2 holdown: Screwed to minimum (2)
x4 2x DF-L studs using (6) SDS 1/4" x 2 1/2" screws.
) 2 ST

2x8 @ 24" O.C.


PO 2x4
(5 PO Use 5/8" dia. all-thread to connect to framing below,

(5)
4

ST

2x8 @ 24" O.C.


S8.01 see structural details. At concrete foundation wall,
fasten to 5/8" dia. anchor bolt with min. 7"
2x4's @ embedment.
2x4's @ 24" O.C. 3. Simpson HDU5 holdown: Screwed to minimum (2)
24" O.C. 2x DF-L studs using (14) SDS 1/4" x 2 1/2" screws.
(2) 2 x 10 HDR Use 5/8" dia. all-thread to connect to framing below,
see structural details. At concrete foundation wall,
4 x 10 BEAM fasten to 5/8" dia. anchor bolt with min. 7"
ST 4 embedment.
PO 4

T
44
4 CQ

(Sistered)
4x4 POS

(N)2x4's
4 x /EC 4. Simpson HDU11 holdown: Screwed to minimum (1)

w/ECCQ
(Sistered)

(Sistered)

(Sistered)
(N)2x4's

(N)2x4's

(N)2x4's
w
6x DF-L post using (30) SDS 1/4" x 2 1/2" screws.
Use 5/8" dia. all-thread to connect to framing below,
see structural details. At concrete foundation wall, June 20, 2012
fasten to 1" dia. anchor bolt with min. 8 1/2"
2'-97 8" 8'-91 2" embedment.
SW1 SW1
5. Simpson MST48 strap tie: Nailed to min. (2) 2x 2010 template 2010-08-24.vwx
SHEARWALL LENGTH SHEARWALL LENGTH
DF-L studs or (1) 4x post above & below, with (34)
16d nails, half of the required nails in each member.
Install per manufacturer's instructions.
1110
6. Simpson MST60 strap tie: Nailed to min. (2) 2x DF-L
studs or (1) 4x post above & below, with (48) 16d
nails, half of the required nails in each member.
Install per manufacturer's instructions.
km
7. Simpson MSTC48B3 pre-bent strap: Nailed to min.
UPPER FLOOR 0 5 10 15 20 FT (2) 2x DF-L studs or (1) 4x post above and to beam
below. Use (38) 10d nails to fasten to framing
FRAMING PLAN above, (12) 10d nails to fasten to face of beam and
(4) 10d nails to fasten to bottom of beam below.
Scale: 1/4" = 1'-0" Install per manufacturer's instructions.
Permit Set

SHEARWALL SCHEDULE
Attachment to
Bottom plate attachment
Capacity (plf)
Upper Floor
Framing Plan
Mark Sheathing Blocking Panel Nailing [1] Anchor bolts to
top plate [3] LSL rim joist Nailing to wood below [4] seismic
concrete below
SW1 15/32" APA sheathing Yes 8d @ 6" o.c. Clip @ 16" o.c. 1 3/4 " LSL 16d @ 6" o.c. 5/8" @ 48" o.c. 240
SW2 15/32" APA sheathing Yes 8d @ 4" o.c. Clip @ 15" o.c. 1 3/4" LSL 16d @ 4.5" o.c. 5/8" @ 20" o.c. 355
15/32" APA sheathing (3) Rows 16d @ 4.25"
SW3 Yes 8d @ 2" o.c. [2] Clip @ 4.5" o.c. 1 3/4" LSL 5/8" @ 15" o.c. [3] 1190
EA Side o.c.

[1] Nails shall be 8d box. Nailing applies to all panel edges (block all unsupported panel edges), top & bottom plates and blocking. Nail to
intermediate framing members w/ 8d @ 12" o.c.
[2] Framing at adjoining panel edges shall be 3 inch nominal or wider and nails shall be staggered.
[3] Foundation sill plate shall be 3" nominal or wider and panel edge nails shall be staggered.
[4] Clip shall be either A35 or LTP4, or RBC.
1
S2.02
[5] Nails shall be 16d box. SHEET OF

[6] For shearwalls with a capacity exceeding 400 PLF, provide 1/2" max between edge of bottom plate and edge of anchor bolt plate washer.
[7] 3 x 3" x 1/4" plate washers are to be used at all anchor bolts. C O P Y R I G H T 2012
[8] For exterior walls not designated as shear walls: Provide 15/32" (NOM.) APA rated sheathing (span rating 24/0) on exterior surfaces nailed at all panel edges (block unsupported edges), P.A. WHITNEY ARCHITECTURE inc.
top and bottom plates with 8d nails @ 6" O.C. and to all intermediate studs and blocking with nails @ 12" O.C.

You might also like