Professional Documents
Culture Documents
PITOT A320
PITOT A320
WARNING: MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
OPENED, SAFETIED AND TAGGED.
1. Reason for the Job
Refer to the MPD TASK: 341300-11
CLEANING OF 1 OUT OF 3 PITOT PROBES.
This procedure gives the instructions necessary to clean one of the three pitot probes to prevent a blockage.
Clean the pitot probes in this sequence:
- Pitot probe 1 (2 or 3)
- Pitot probe 2 (3 or 1)
- Pitot probe 3 (1 or 2).
2. Job Set-up Information
QT
REFERENCE DESIGNATION
Y
No specific 1 ACCESS PLATFORM 2M (6 FT)
No specific AR NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY
No specific AR SAFETY CLIP - CIRCUIT BREAKER
No specific AR WIRE - NYLON
98D34103004001 1 CLEANER-PITOT PROBE
98F34103003000 1 FLUSHING TOOL-PITOT PROBE
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 1 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
812
C. Referenced Information
REFERENCE DESIGNATION
Ref. 10-11-00-555-013-A Installation of the Aircraft Protection Equipment
Ref. 10-11-00-555-014-A Removal of the Aircraft Protection Equipment
Ref. 24-42-00-861-001-A Energize the Ground Service Network from the External Power
Ref. 24-42-00-862-001-A De-energize the Ground Service Network Supplied from the
External Power
Ref. 34-11-00-040-802-A Deactivation of the Air Data Probes
Ref. 34-11-00-440-801-A Reactivation of the Air Data Probes
Ref. 34-11-15-000-001-A Removal of the Pitot Probe
Ref. 34-11-15-400-001-A Installation of the Pitot Probe
Ref. 52-41-00-010-002-A Open the Avionics Compartment Doors for Access
Ref. 52-41-00-410-002-A Close the Avionics Compartment Doors after Access
Ref. Fig. Connection of the Pitot Probe Flushing-Tool
Ref. Fig. Check of the Quick-Disconnect Coupling
3. Job Set-up
SUBTASK 34-10-00-861-063-A
A. Energize the ground service network
Ref. AMM TASK 24-42-00-861-001.
SUBTASK 34-10-00-040-055-A
B. Deactivation of the Air Data Probes
WARNING: BEFORE YOU OPEN THE PHC CIRCUIT BREAKERS, OPEN THE PROBE HEATER
CIRCUIT-BREAKERS. IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE
PERSONNEL.
(1) Do the deactivation of the air data probes for maintenance
Ref. AMM TASK 34-11-00-040-802.
SUBTASK 34-10-00-865-084-A
C. Open, safety and tag the circuit breaker(s) that follow(s). Use the SAFETY CLIP - CIRCUIT BREAKER
as necessary.
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 2 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
** ON A/C FSN 001-012, 014-017, 019-028, 034-038, 201-209, 254-262, 301-301, 305-306, 310-311,
318-350, 601-650, 652-700, 851-863, 868-874, 877-879, 891-892, 895-900
121VU COM NAV/RADAR/2 5SQ2 K14
** ON A/C FSN ALL
121VU COM NAV/RADAR/1 5SQ1 K13
FOR FIN 9DA1(PROBE-PITOT, 1)
49VU ANTI ICE/PROBES/PHC/1 2DA1 D03
FOR FIN 9DA2(PROBE-PITOT, 2)
122VU ANTI ICE/PROBES/PHC/2 2DA2 Y12
FOR FIN 9DA3(PROBE-PITOT, 3)
122VU ANTI ICE/PROBES/PHC/3 2DA3 Y16
SUBTASK 34-10-00-010-067-A
D. Get access to the avionics compartment.
(1) Put the ACCESS PLATFORM 2M (6 FT) in position:
- At zone 125 to get access to pitot probe 1 (9DA1) and pitot probe 3 (9DA3)
- At zone 126 to get access to pitot probe 2 (9DA2).
(2) Open the applicable access door Ref. AMM TASK 52-41-00-010-002:
(a) FOR 9DA1 (PROBE-PITOT, 1)
- 812.
(b) FOR 9DA3 (PROBE-PITOT, 3)
- 812.
(c) FOR 9DA2 (PROBE-PITOT, 2)
- 822.
SUBTASK 34-10-00-860-079-A
E. Connection of the Dry Nitrogen Source
Ref. Fig. Connection of the Pitot Probe Flushing-Tool
4. Procedure
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 3 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
SUBTASK 34-10-00-170-061-A
A. Cleaning of the Pitot Probe-Drain Holes (for the Thales Pitot Probes)
(1) Use the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY to blow the nitrogen gas
for approximately three minutes through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5
psi or +5 psi). At the same time:
(a) Clean the drain holes of pitot probe 1(2, 3) with the CLEANER-PITOT PROBE (
98D34103004001) and:
- The WIRE - NYLON diameter 0.7 MM (0.0276 IN.)
, then
- The WIRE - NYLON diameter 0.8 MM (0.0315 IN.).
1 Use the WIRE - NYLON with a length of minimum 5 mm (0.1969 in.) to make sure
that the metal tool element does not touch and cause damage to pitot probe 1(2, 3).
(2) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot
probe 1(2, 3):
(a) Make sure that pressurized nitrogen gas comes out of the pitot probe inlet (there is no
internal blockage).
(b) If the nitrogen gas does not come out of the pitot probe inlet, replace the pitot probe Ref.
AMM TASK 34-11-15-000-001 and Ref. AMM TASK 34-11-15-400-001.
(3) Stop the flow of the nitrogen gas.
(4) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(5) Disconnect the FLUSHING TOOL-PITOT PROBE (98F34103003000) from pitot probe 1(2, 3).
(6) Connect the quick-disconnect coupling to pitot probe 1(2, 3).
(7) Make sure that you can see the blue ring on the quick-disconnect coupling.
(8) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(9) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-
disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Ref. Fig. Check of the Quick-Disconnect Coupling
SUBTASK 34-10-00-170-062-A
B. Cleaning of the Pitot Probe-Drain Holes (for the Rosemount Aerospace and Goodrich Pitot Probes)
(1) Use the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY to blow the nitrogen gas
for approximately three minutes through the hose at a pressure of 2 -0.35 bar or +0.35 bar (29 -5
psi or +5 psi). At the same time:
(a) Clean the drain holes of pitot probe 1(2, 3) with the CLEANER-PITOT PROBE (
98D34103004001) and:
- The WIRE - NYLON diameter 0.6 mm (0.024 in.)
, then
- The WIRE - NYLON diameter 0.7 MM (0.0276 IN.).
1 Use the WIRE - NYLON with a length of minimum 5 mm (0.1969 in.) to make sure
that the metal tool element does not touch and cause damage to pitot probe 1(2, 3).
(2) Make sure that there is no contamination in the pressurized nitrogen gas at the outlet of pitot
probe 1(2, 3):
(a) Make sure that pressurized nitrogen gas comes out of the pitot probe inlet (there is no
internal blockage).
(b)
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 4 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
If the nitrogen gas does not come out of the pitot probe inlet, replace the pitot probe Ref.
AMM TASK 34-11-15-000-001 and Ref. AMM TASK 34-11-15-400-001.
(3) Stop the flow of the nitrogen gas.
(4) Disconnect the NITROGEN COMPRESSED SOURCE 2 BAR (29 PSI) - DRY.
(5) Disconnect the FLUSHING TOOL-PITOT PROBE (98F34103003000) from pitot probe 1(2, 3).
(6) Connect the quick-disconnect coupling to pitot probe 1(2, 3).
(7) Make sure that you can see the blue ring on the quick-disconnect coupling.
(8) Pull the quick-disconnect coupling to make sure that it is correctly attached.
(9) Make sure that the quick-disconnect coupling is correctly engaged (the pin on the quick-
disconnect male part is fully engaged into the groove in the quick-disconnect female part).
Ref. Fig. Check of the Quick-Disconnect Coupling
SUBTASK 34-10-00-170-058-A
C. After the Cleaning Procedure
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 5 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
SUBTASK 34-10-00-440-053-A
E. Reactivation of the Air Data Probes
WARNING: BEFORE YOU CLOSE THE PROBE HEATER CIRCUIT-BREAKERS, CLOSE THE
LGCIU, EIU AND PHC CIRCUIT BREAKERS.
IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE
PERSONNEL.
(1) Do the reactivation of the air data probes after maintenance
Ref. AMM TASK 34-11-00-440-801.
5. Close-up
SUBTASK 34-10-00-410-067-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access door Ref. AMM TASK 52-41-00-410-002:
(a) FOR 9DA1 (PROBE-PITOT, 1)
- 812.
(b) FOR 9DA3 (PROBE-PITOT, 3)
- 812.
(c) FOR 9DA2 (PROBE-PITOT, 2)
- 822.
(3) Remove the access platform(s).
SUBTASK 34-10-00-862-064-A
B. De-energize the ground service network
Ref. AMM TASK 24-42-00-862-001.
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 6 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 7 of 8
CONFIDENTIAL AND PROPRIETARY DOCUMENT. PRINT DATE: May 11/2024
AMM - AVA - A318/A319/A320/A321 REV DATE: May 01/2024
Tail Number - MSN - FSN: N930AV - 11685 - 879
34-10-00-170-004-A - Cleaning of 1 out of 3 Pitot Probes
JCP Title: PITOT 930 © AIRBUS S.A.S. ALL RIGHTS RESERVED. Page 8 of 8