FVCA-version-3-Janvier-2024
FVCA-version-3-Janvier-2024
FVCA-version-3-Janvier-2024
Synthesis
Self-Assessment
290W00020R/290W00033R/290W00036R/290W00037R/290W00
Firm/Plant : Valeo Saint quentin fallavier Reference/Index :
048R (série)
Designation :
EZ 1
Workshop : File # :
Assessment perimeter
Remarks : X
X
Assessor(s) Participants
action plan
evaluated
Partially
OK with
N.A.
OK
KO
No Theme Remarks
3 Tier-n capacity validation 3 IBSG GEN2 + IBSG GEN2 splined hub+Breather en cours de validation Renault audit mandatory + Supplier action plan
Decision GO 1 Remarks :
(Cross the
Go with action plan
coresponding
box)
NO go
Conclusions
Synthèse of customer audit 06-12-20223 : La cotation de l’audit ASPQR est K0 96% , un plan d’action est à mettre en place pour les 2 points NOK (non
bloquants)qui sera suivi pour atteindre le K0 100% avant PPC. (issue de customer audit de 06-12-2023-commented by Manuel Cascales)
290W00020R/290W00033R/290W00036
Firm/Plant : Valeo Saint quentin fallavier Reference/Index :
R/290W00037R/290W00048R (série)
Designation :
EZ 1
DCL Conditionnement non validé par RSA, en cours d'etude VALEO avec conditionnement
Logistics-Marion
1 renouvelable
Champetier
contenant 10 unités au lieu de Conditionnement carton avec 6 unités
Process engineer :
Franck Martin
2 qualification EOL for NVH spec (accoustics et vibration)
RD : Anhony lamarche
qualité : Ning TONG
290W00020R/290W00033R/290W00036R/290
Firm/Plant : Valeo Saint quentin fallavier Reference/Index :
W00037R/290W00048R (série)
Designation : EZ1
Site : Valeo Saint quentin fallavier Vehicle/Function : EZ1 direct drive
Workshop : File # :
Documentation
action plan
evaluated
Partially
OK with
N.A.
OK
KO
Crit. Libellé
Documentation x
At the time of the capacity assessment, the following support documentation should be available for review:
1.1 x
Process control plan, with reaction plan
1.2
Ramp-up control plan (if spe required) x
1.3
Operator/inspection instructions x
1.4
Packaging/labeling plan x
Note: All documentation must be complete and correct.
Manufacturing process
action plan
evaluated
Partially
OK with
N.A.
OK
KO
Crit. Libellé
2.1
Is the product being manufactured at the production site using the production tooling, gaging, process, materials, x
operators, environment, and process settings?
2.2 Does the actual process flow agree with the process flow diagram, as documented in PSW? (Review the facility x
plan and layout. Walk the process with the flow diagram.)
2.3 x
Are operator instructions/visual controls available and adhered to at each work station?
2.4
Is all in-process documentation, such as process control charts, in place at the time of the capacity self assessment x
and utilized to drive a defined reaction plan and corrective action process?
2.5 x
When required, are production boundary samples available at required work stations?
2.6 x
Are the boundary samples approved by Renault?
2.7 x
Are maintenance plans in place?
2.8 x
Are repair and maintenance parts available?
2.11 Do the parts produced off during the capacity assessment meet quality Renault's requirements, as stated in PSW? x
Suppliers management
action plan
evaluated
Partially
OK with
N.A.
OK
KO
Crit. Libellé
have the capacities of subcontractors (included directed suppliers) been evaluated by the supplier (tier-1) ?
3.2 x
3.3 Is the ramp-up plan communicated to the suppliers and confirmed. (taking into account lead time) x
evaluated
Partially
OK with
N.A.
OK
KO
Crit. Libellé
4.4 Are the logistics internal flow described and effective as planned? x
4.5 Is the workstation layout definitive, including incoming and outcoming parts packaging ? x
OK
KO
Firm/Plant : Reference/Index : No Theme Remarks
Designation :
Tier 1 Process capacity Not
2 1
validation applicable
310 Site : Vehicle/Function :
Nominal capacity required by RNPO (Weekly) [parts]
Laurent petithjean
Assessor
Wilfried PAYS
(Supplier responsible) Ehsan Dehnaviyylagh
Yellow boxes are to be filled, white boxes can be either filled or calculated CAPACITY ASSESSMENT RUN
Time Number of parts
downtime (mn)
downtime (mn)
Operation average practical This operation This Observed
directly good
Number Downstream (Confirmed)
unplanned
Number operational Number of cycle time Forecasted scrap rate Estimated operation cumulated
reworked
planned
of parts scraps [%] Estimated planned Observed
rework
(see efficiency Percentage of part (from Current during OEE [%] Assessed observed Downstream
per cycle (this op. practical weekly OEE (without
example (based on cumulated nb hours production this Weekly capacity (without capacity scrap rate scraps [%]
included) capacity (p/h) working time scrap) (%)
below or production This Downstream per shift Total allocated to operation) capacity assessment scrap) (%) (Forecast (p/week) [%] (this op.
(confirm) (Forecast (h/w)
use Name of the part list of final standard Nb results) [%] operation scraps [%] Effective (same base Weekly thisRenault-Niss used per (equivalent run serial life) included)
serial life)
flowchert Next Machine type and produced by this product using cycle time parts/ (not including scrap rate (this op. capacity per as OEE nb shifts working Number of an parts final final product final (s)
numbers) operation Process operation Identification operation Ref this Ref. [sec] cycle scraps) [%] included) hour calculation) per week time machines product [%] (coefficient) product)
OP10 OP20 Differential preparation OP10 1 300 1 76.0% 1.00% 0.10% 8 5 40.0 1.0 100.0% 1.0 364 4.3 0.2 0.0 1 0 0 246.0 1 76.0% 0.10% 0.1% 11.1 40.0 444 100.0% 0.0% 0.0%
9
OP20 OP30 Shafts preparation OP20 1 300 1 76.0% 1.00% 0.10% 8 5 40.0 1.0 100.0% 1.0 364 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 11.0 40.0 441 100.0% 0.0% 0.0%
9
OP30 OP40-50 Cover Preparation OP30 1 300 1 76.0% 1.00% 0.10% 8 5 40.0 1.0 100.0% 1.0 364 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 11.0 40.0 441 100.0% 0.0% 0.0%
9
Carrier preparation and 300 1 76.0% 0.10% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
OP40-50 OP60 Shimming OP40-50 1 1.00% 9 364 11.0 441 100.0% 0.0%
300 1 76.0% 0.10% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
OP60 OP70 Plasma and Glue OP60 1 0.50% 9 364 11.0 441 100.0% 0.0%
300 1 76.0% 0.10% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
OP70 OP80 Reducer closing OP70 1 0.50% 9 364 11.0 441 100.0% 0.0%
Air Leak test and Laser 300 1 76.0% 0.10% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
OP80 OP90 engraving OP80 1 1.00% 9 364 11.0 441 100.0% 0.0%
300 1 76.0% 0.10% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
OP90 EOL iBSG screwing OP90 1 0.50% 9 364 11.0 441 100.0% 0.0%
300 1 76.0% 8 5 40.0 1.0 100.0% 1.0 4.3 0.2 0.0 1 0 0 247.8 1 76.0% 0.10% 0.1% 40.0 0.0%
EOL Testing EOL 1 2.00% 0.10% 9 364 11.0 441 100.0% 0.0%
1/ updated xx/xx/xx
Supply chain investigation : Tier-2 and more Firm/Plant : Valeo Saint quentin fallavier Reference/Index : 290W00020R/290W00033R/290W00036R/290W00037R/290W00048R (série)
Designation :
EZ 1
Weekly Capacity Process - Request of RNPO - [parts] 310 Site : Valeo Saint quentin fallavier Vehicle/Function : EZ direct drive
Input dynamic seal OP30 France Joint France seal >1000 2 500 >=1 70% >1000 2 500 >1 70% Visit YES 2 weeks 2
Chongqing
Input shaft hub OP70 Fuchuan Chine forging >1000 1 1000 >=1 70% >1000 1 1000 >1 70% Visit YES 11 weeks 11
HEX NUT OP70 Agrati Italy mouting and fitting >1000 1 1000 >=1 70% >1000 1 1000 >1 70% Visit YES 2 weeks 5
Coupling O-Ring OP70 France Joint France Rubber parts >1000 1 1000 >=1 <1% >1000 1 1000 >1 <1% Visit YES 2 weeks 2
Hub O-Ring OP20 France Joint France Rubber parts >1000 1 1000 >=1 <1% >1000 1 1000 >1 <1% Visit YES 2 weeks 2
Intermediate shaft Chongqing
sub-Assembly OP20 Fuchuan Chine machining >1000 1 1000 >=1 70% >1000 1 1000 >1 70% Visit YES 11 weeks 11
C&U Europe
Ball bearing Ø62 OP20 GmbH Germany bearing >2000 2 500 >=1 <1% >2000 2 500 >1 <1% Visit YES 2 weeks 5
Chongqing
Differential Sub-assembly OP10 Ocean Driveline Chine diff >1000 1 1000 >=1 <1% >1000 1 1000 >1 <1% Visit YES 11 weeks 11
Chongqing
Final gear OP10 Fuchuan Chine machining >1000 1 1000 >=1 70% >1000 1 1000 >1 70% Visit YES 11 weeks 11
Hexagon head bolt Solvera Gawel
M8x25-black OP10 Technology Poland mounting and fitting >5000 6 833 >=1 <1% >5000 6 833 >1 <1% Visit YES 2 weeks 5
C&U Europe
Tapered bearing Ø62 OP10 GmbH Germany bearing >1000 2 500 >=1 70% >1000 2 500 >1 70% Visit YES 2 weeks 5
Output dynamic seal OP30 France Joint France seal >1000 2 500 >=1 80% >1000 2 500 >1 80% Visit YES 2 weeks 2
SEEGER-ORBIS
Bearing shim Ø52 OP40 GmbH Germany shims >1000 1 1000 >=1 <1% >1000 1 1000 >1 <1% Visit YES 2 weeks 5
SEEGER-ORBIS
Bearing shim Ø62 OP40 GmbH Germany shims >1000 1 1000 >=1 <1% >1000 1 1000 >1 <1% Visit YES 2 weeks 5
Permanent
Breather OP50 Magnets Ltd Inde mounting and fitting >1000 1 1000 >=1 30% >1000 1 1000 >1 30% Visit YES 2 weeks 11
Permanent
Drain plug OP110 Magnets Ltd Inde mounting and fitting >1000 1 1000 >=1 30% >1000 1 1000 >1 30% Visit YES 2 weeks 11
Permanent
Filler plug OP40 Magnets Ltd Inde mounting and fitting >1000 1 1000 >=1 30% >1000 1 1000 >1 30% Visit YES 2 weeks 11
HENKEL
Glue OP60 TECHNOLOGIES France glue > 5 tubes (330 ml/tube) 3 ml 550 >=1 <1% > 5 tubes (330 ml/tube) 3 ml 550 >1 <1% Visit YES 2 weeks 2
Total Energie
Oil OP100 Lubrifiants France oil >720 L 50 ml+-10% 14400 >=1 <1% >720 L 50 ml+-10% 14400 >1 <1% Visit YES 2 weeks 2
Total Energie
Grease OP90 Lubrifiants France grease >1000 1.5ml 667 >=1 <1% >1000 1.5ml 667 >1 <1% Visit YES 2 weeks 2
Output protective plug OP100 Marmillon France plastics part >1000 2 500 >=1 70% >1000 2 500 >1 70% Visit YES 2 weeks 2
Solvera Gawel
Hexagon flange M8x25 OP70 Technology Poland mounting and fitting >7000 11 636 >=1 <1% >7000 11 636 >1 <1% Visit YES 2 weeks 5
Solvera Gawel
Hexagon flange M8x30 OP90 Technology Poland mounting and fitting >5000 3 1667 >=1 <1% >5000 3 1667 >1 <1% Visit YES 2 weeks 5
IBSG OP90 Valeo France intra >1000 1 1000 >=1 70% >1000 1 1000 >1 70% Visit YES 2 weeks 2
OK
KO
No Theme Remarks
1/ Updated xx/xx/xx