Project : - Wave Cinemas at M3M Urbana
Cilent : - Multiplex Cinevision Private Limited
Contractor : - M/s HBN INFRACON
Nature of work :-
ABSTRACT
As Per Work Order Previous Bill This Bill Cummulative Bill
S.No. Item Description
Unit Rate Qty Amount Qty Amount Qty Amount Qty Amount
Fixing of Existing Actuator, Damper & Linkage with using required bolt etc. of
1 Nos. 600.00 5.00 3,000.00 5.00 3,000.00 5.00 3,000.00
AHU
- - -
2 Providing & Applying of insulation Sqmt 750.00 2.00 1,500.00 2.00 1,500.00 2.00 1,500.00
3 Removing & Installation of existing duct piece for fixing of damper of AHU Nos 1,000.00 2.00 2,000.00 2.00 2,000.00 2.00 2,000.00
- - - -
1 Lac Coating LO 1,200.00 1.00 1,200.00 1.00 1,200.00 1.00 1,200.00