PO No.: PO DATE:
REVISION STATUS:
A 27-Jul-18 SR KQ PK
B 12-Dec-18 RT/SR KQ PK
DOCUMENT CODE
1 Approved
For Information only with/without any comment and/or Resubmit revised drawings/documents after
4 incorporating comment/modifications
C AS MANUFACTURED 23-Sep-22
1 2 3 4 5 6 7 8
© Copyright 2018 ABB
A A
B B
Customer : SARAWAK ENERGY
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C
Project : Control,Monitoring and Protection upgrading for Batang AI Power Generation Sdn, Bhd. C
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Title page +01YS
Print: 4/5/2021
A A
1 Title page C 21 VT Circuit Looping C
C
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
12 Synchronizing VT Circuit
D D
13 Heating and Lighting Circuit C
E E
17 REU615 F01 Binary Input Circuit-1 C
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR List of contents +01YS
Print: 4/5/2021
1 -CTD1 3 Phase Current PT-3 I/P CT Ratio: 250/1A, O/ PT643-15F SECURE PT643-15F 1 8
Transducer P: 4-20 mA
2 -D1 Fast recovery MDD26-08N1B Vrrm 1200V Ifav 36A MDD26-08N1B IXYS MDD26-08N1B 1 8
epitaxial diode
3 -D2 Fast recovery MDD26-08N1B Vrrm 1200V Ifav 36A MDD26-08N1B IXYS MDD26-08N1B 1 8
epitaxial diode
B B
4 -D3 Fast recovery MDD26-08N1B Vrrm 1200V Ifav 36A MDD26-08N1B IXYS MDD26-08N1B 1 8
epitaxial diode
5 -D4 Fast recovery MDD26-08N1B Vrrm 1200V Ifav 36A MDD26-08N1B IXYS MDD26-08N1B 1 8
epitaxial diode
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
6 -DF Frequency indicator DFP 144 2x45...50...55 Hz Scale: 45-55Hz DFP 144 GOSSEN Mueller & Weigert DFP 144 1 21
7 -DSY Synchronoscope SY 144 110VAC 50Hz 3290Q IL710 IK20 GOSSEN Mueller & Weigert 3290Q IL710 IK20 1 21
8 -DV Double voltmeter DVP 144 2x 0-250V 144x144mm DVP 144 GOSSEN Mueller & Weigert DVP 144 1 21
C C
9 -E100 Lamp SZ 4139.150 14W On/Off switch 4028177320741 Rittal 4028177320741 1 8,13
10 -E200 Outlet M1363-L 250VAC, 13A, RAL7035 2 pole and earth, BS ( 2CSM258163R0721 ABB 2CSM258163R0721 1 8,13
UK) standard, with
indicator light
11 -E300 Heating FLH 60 110-250 VAC. with 60W, fuse 4A 17006005007 PFANNENBERG 17006005007 1 8,13
terminal, 2x0.5-1.5
mm²
12 -E400 Temperature and ETF 012 100-240VAC, 50/60HZ 0-60°C, 50-90% 01230.0-00 Stego 01230.0-00 1 8,13
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
14 -F101 Miniature circuit S202M-B10 10A 2 pole, 400VAC/125VDC 2CDS272001R0105 ABB 2CDS272001R0105 1 8,13,29
E E
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
15 -F102 Residual Current F202 AC-25/0.03 25A 2 pole, 230VAC 2CSF202001R1250 ABB 2CSF202001R1250 1 8,13,29
Circuit Breaker
Auxiliary contact S2C-H6R 1CO 1st Auxilliary contact 2CDS200912R0001 ABB 2CDS200912R0001 1 8,29
block block
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Parts list +01YS
Print: 4/5/2021
16 -F201 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
17 -F202 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
B B
18 -F203 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
19 -F204 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
20 -F205 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
C breaker C
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
21 -F206 Miniature circuit S202M-C6UC 6A 2 pole, 400VAC/440VDC 2CDS272061R0064 ABB 2CDS272061R0064 1 8,14,29
breaker
Auxiliary contact S2C-H11L 1NO, 1NC 2CDS200936R0001 ABB 2CDS200936R0001 1 8,29
block
22 -F301 Miniature circuit S202M-C2 2A 2 pole, 400VAC/125VDC 2CDS272001R0024 ABB 2CDS272001R0024 1 8,20,29
breaker
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
26 -K3 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,15,24,25,26,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1 29
E E
27 -K4 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,15,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1
28 -K5 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,16,25,26,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1 29
29 -K6 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,16,25,26,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Parts list +01YS
Print: 4/5/2021
30 -K7 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,16,25,26,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1
31 -K8 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,16,25,26,29
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1
B 33 -K10 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 8,16,17,25,26,29 B
Varistor RV-BC6/250 50-250VDC GHV2501903R0002 ABB GHV2501903R0002 1 29
34 -K11 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 16,26,29
35 -K12 Contactor KC 6-40 E-04 110-125VDC 4NO GJH1213001R0404 ABB GJH1213001R0404 1 16,26,29
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
36 -L1 Indicator light CL-515G 110-130VDC, 15mA Green 1SFA 619 402 R5152 ABB 1SFA 619 402 R5152 1 7,24
37 -L2 Indicator light CL-515R 110-130VDC, 15mA Red 1SFA 619 402 R5151 ABB 1SFA619402R5151 1 7,24
38 -PB01 Push button CP210G-20 Green Push Button 1SFA619101R1022 ABB 1SFA619101R1022 1 7,15,29
39 -PB02 Push button CP1-10B-20 250 V 2NO, black 1SFA619100R1026 ABB 1SFA619100R1026 1 7,24,29
C C
40 -SS1 Auxiliary contact MCBH-20 2NO Contact block with 1SFA611605R1102 ABB 1SFA611605R1102 1 7,15,29
block holder
Key Selector Switch M3SSK1-101 Compact Selector 1SFA611283R1001 ABB 1SFA611283R1001 1 15,29
Switch, 3-pos
45 -XA Feed-through terminal UT 4 1000V, 41A 0.25-4mm², max 2 3044102 Phoenix Contact 3044102 4 8,13
wires, grey
46 -XB1 Feed-through terminal UT 4 1000V, 41A 0.25-4mm², max 2 3044102 Phoenix Contact 3044102 18 8,14
wires, grey
E E
47 -XB2 Disconnect terminal UT 4-MT 500V, 16A 0.25-4mm², max 2 3046139 Phoenix Contact 3046139 113 8,15,16,17,18,19,25,26
wires, grey
48 -XB3 Disconnect terminal UT 4-MTD-DIO/L-R 500V, 20A 0.14-6mm², max 2 3046210 Phoenix Contact 3046210 4 8,24
wires, grey
49 -XB4 Disconnect terminal UT 4-MT 500V, 16A 0.25-4mm², max 2 3046139 Phoenix Contact 3046139 2
wires, grey
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Parts list +01YS
Print: 4/5/2021
50 -XB5 Disconnect terminal UT 4-MT 500V, 16A 0.25-4mm², max 2 3046139 Phoenix Contact 3046139 25 8,22,23
wires, grey
51 -XCT Transducer terminal URTK 6 400V, 57A 0.5-6mm², max 2 wires, 3026272 Phoenix Contact 3026272 5 8,23
grey
52 -XV Transducer terminal URTK 6 400V, 57A 0.5-6mm², max 2 wires, 3026272 Phoenix Contact 3026272 17 8,20
grey
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
D D
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Parts list +01YS
Print: 4/5/2021
Front view hinged frame (+U) Back view hinged frame (+V)
A A
U V
0 0
1 1
2 2
3 3 Push Button Service description-
4 4
PB01 - Synchro Release
5 5
-L1 -L2 -L2 PB02 - Lamp Test
B 6 6 X1 X2
-L1
X1 X2
B
7 7
-DF -DSY -DV
8 Indication Lamp Service description-
8 -DV -DSY -DF
9 9
L1 - Sync Ok (Green Color)
10 I V II I Hz II 10
L2 - Bus Coupler Closed (Red Color)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
11 f 11
12 -F01
12
-F01
ABB
13
-X100
13
-X105 -X130
Ready Start Trip 1 1
2 2
-X1 3 3
LAN
4 4 1
5 5 2
6 6 3
14
7 7 4
14 8
10
11
8
10
11
5
8
Selector Switch Service description-
12 12 9
13 13 10
14 14 11
16
17
18
15
16
17
18
12
13
14
15
19
20
21
19
20
21
16
17
18
SS1 - Local/Remote Selector
16
R R
16
22 22
L L ? 23
24
PE
23
24
C 17 17 C
18 -SS1 18
-PB01 -PB02 -SS1 -PB02 -PB01
19 19 13 23
14 13
24
14
23
13
Meter Service description-
24 23
14 24
20 20
DV - Double Voltmeter
21 21
DF - Double Frequency meter
22 22
DSY - Synchronoscope
23 23
24 24
2000
25 25
26 26
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
27 27
D 28 28 D
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
E E
40 40
100
800
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Front and Back View Hinged Frame +01YS
Print: 4/5/2021
A A
L N PE
75x125x250
-F101
-F102
-D1
-D2
-D3
-D4
75x125x250
Internal
-CTD1
75x75x1600
75x75x1600
External
B 1 1 1 1
21 20 2 5
13
21 1 3 2/1 4/3 12
14
B
25A
10A
2 2 2 2
3 3 3 3
-13 +12
22 2 4 1/2 3/4 11
14
-F201
-F202
-F203
-F204
-F205
-F206
-F301
-F302
75x50x500
13 13 13 13 13 13 13 13
21 1 3 21 1 3 21 1 3 21 1 3 21 1 3 21 1 3 21 1 3 21 1 3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
6A
6A
6A
6A
6A
6A
2A
2A
22 2 4 22 2 4 22 2 4 22 2 4 22 2 4 22 2 4 22 2 4 22 2 4
14 14 14 14 14 14 14 14
Internal
External 75x50x500
13 23 33 43 13 23 33 43 13 23 33 43
13 23 33 43 A1 13 23 33 43 A1 13 23 33 43 A1 13 23 33 43 A1
53 63 73 83 53 63 73 83 53 63 73 83
54 64 74 84 54 64 74 84 54 64 74 84
14 24 34 44 A2 14 24 34 44 A2 14 24 34 44 A2 14 24 34 44 A2
14 24 34 44 14 24 34 44 14 24 34 44
C C
Internal
External 75x50x500
2 4 6 8
14 24 34 44 A2 14 24 34 44 A2 14 24 34 44 A2
External
External 75x50x500
External
-XV -XCT
-XA -XB1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 3 4 5
1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
E E E E E E E E E E E E E E E E E E E E E E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 3 4 5
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
E E E E E E E E E E E E E E E E E E E E E E
75x50x500 External
D D
External 75x50x500
-XB2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 53 54 55 56 57 58 59 60 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 53 54 55 56 57 58 59 60 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
75x50x500 External
External 75x50x500
-E300
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
P N
1 2 3 4 5
N L PE
E E
75x75x1600
75x75x1600
External
Internal
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR GA Internal Arrangement +01YS
Print: 4/5/2021
60
60
NP NP
A A
PAD LOCKABLE
B HANDLE FRONT FRONT B
2200
2100
EQUIPEMENT FRAME EQUIPEMENT FRAME
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
LOUVERS
LOUVERS
C C
100
BASE FRAME
800
800 800800 26 800748 26
26 800748 26
FRONT VIEW REAR VIEW SIDE VIEW (LEFT) SIDE VIEW (RIGHT)
NOTES;-
1. FRONT DOOR OPENING ANGLE :120.
2. * : PROTECTIVE COVER TO BE PROVIDED FOR 240V AC TERMINAL BLOCK.
3. ** : ELECTRO GALVANIZED STEEL POCKETS FOR A4 SIZE DOCUMENT.
REAR CUBICLE DETAILS
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
TERMINAL BLOCKS : DISCONNECTING TYPE FOR VT CKT. NON-DISCONNECTING TYPE FOR OTHER CKTS & ON ALL INTERPANEL WIRING.
FRONT GLAND PLATE : GALVANIZED STEEL 3mm, UNDRILLED
NOT TO SCALE
ALL DIMENSIONS ARE IN mm
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR General Arrangement +01YS
Print: 4/5/2021
B B
STATION CMS SYSTEM
OPERATOR
STATION
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
REU 615
SYNCHROCHECK
-PB01
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
D D
SYNCHRONIZING INSTRUMENTS
V1 f1
V2 f2
E E
110V DC POWER SUPPLY FROM
STATION DCDB
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Synchronizing Block Diagram +01YS
Print: 4/5/2021
A A
START
ACTIVATION LOCATION
B B
REMOTE
LOCAL/REMOTE SYNC. PANEL
SELECTION
LOCAL
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C NO C
NO SYNC
SYNC OK REU 615
OK
YES
YES
D D
SYNCHRONIZED
SYNC. PANEL
STOP
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Synchronizing Flow Chart +01YS
Print: 4/5/2021
MCB MCB
Y Y
VT-B VT-A
Refer Sheet 19.B5 Refer Sheet 19.B3
N N
U1W6 U1W4
B B
U1W0
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
D D
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Synchronizing VT Circuit +01YS
Print: 4/5/2021
Hygrostat and
Door Switch
Socket outlet
Lamp with
AC Supply
230 VAC
Heating
A A
+ACDB
-F101
-XA
# 1 /29.A1
1 2
240V AC
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
-E400
Hygrotherm
ETF 012
C 1 C
<ϑ
2 <φ
≥1
3
4
5
E E
-XA
2 /29.A1
3 4
240V AC
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Heating and Lighting Circuit +01YS
Print: 4/5/2021
DC Supply - 1
DC Supply - 2
A A
-D1
+110V DCDB -F201
-XB1 2 1 3
1 /29.A3
1 2
-XB1
5 6 7 8
B B
-F203
/29.A4 K+
/15.B2
1 2 -SS1:14 Power Supply to
-D2 Aux. Relay
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
/29.A4
/15.F2
3 4 -K1:A2
-XB1 2 1 3 6A
2 /29.A3
3 4
6A
-F204
C C
/29.A5
/17.B2
1 2 -F01:1 (-X100)
Power Supply to
/29.A5 REU 615
/17.F2
3 4 -F01:2 (-X100)
6A
-F205
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
/29.A5
/24.B2
1 2 -PB02:13
D Power Supply to D
-D3 /29.A5 Indication Circuit
/24.F2
+110V DCDB -F202 3 4 -L1:X2
6A
-XB1 2 1 3
3 /29.A3
1 2 -F206
/29.A6
/22.A8
1 2 Power Supply to
/29.A6 Transducer Circuit
/22.A8
3 4
6A
-XB1
E 9 10 11 12
E
-D4
-XB1 2 1 3
4 /29.A3
3 4
6A
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR 110 V DC Supply Circuit +01YS
Print: 4/5/2021
A A
Remote Selected
Local Selected
Sync. Release
Sync Ok
K+ K+
/14.B7 /16.B2
-F203:2 -XB2:5
B B
A Remote
-F01
C Local
-X100 6
/29.C4
/29.C4
B 0
24
14
-SS1
13
23
P1#P01
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
/27.B3
-XB2
1
C C
/29.C3
/29.B2
23
24
-K2
-PB01
-F01
-X100
23
24
13
-XB2
+Station CMS
P1#S02 3
/29.B1
24
/27.D3
-K1
14
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
+Station CMS
23
D D
-XB2
2
-XB2
4
A1 A1 A1 A1
-K3
-K1
-K4
E -K2 E
/29.B1
/29.B2
/29.B3
A2
/29.B3
A2 A2 A2
/14.B7 /16.F2
-F203:4 -K5:A2
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Aux. Relay Circuit-1 +01YS
Print: 4/5/2021
Isolator closed
Isolator closed
Isolator Open
Isolator open
Reserve Bus
Reserve Bus
Main Bus
Main Bus
Spare
Spare
K+
/15.B7
-F01:6 (-X100)
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
-XB2 -XB2 -XB2 -XB2 -XB2 -XB2 -XB2 -XB2
5 6 9 10 13 14 17 18
+Switching Station MKD
LP100
11
3 2 5 4 7 6
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
D -XB2 -XB2
D
-XB2 -XB2 -XB2 -XB2 -XB2 -XB2
7 8 11 12 15 16 19 20
A1 A1 A1 A1 A1 A1 A1 A1
-K12
-K11
-K10
-K5
-K6
-K7
-K8
-K9
/29.C2
/29.C1
/29.B5
/29.B6
/29.B4
/29.B4
/29.B7
/29.B7
A2 A2 A2 A2 A2 A2 A2 A2
E E
/15.F7
-K4:A2
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Aux. Relay Circuit-2 +01YS
Print: 4/5/2021
Spare
/14.C7 /18.B2
-F204:2 -XB2:25
B B
/29.B7
/29.B7
14
14
-K10
-K9
13
13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
-XB2 -XB2
21 23
-XB2 -XB2
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
22 24
D D
-F01
-X100 1 -X130 1 -X130 3 -X130 5 -X130 7
+ + + + +
100-240VAC, 50/60Hz
48-250VDC #BI.01 #BI.02 #BI.03 #BI.04
E /27.B1 24-250VDC 24-250VDC 24-250VDC 24-250VDC E
- /27.B6 - /27.B6 - /27.B6 - /27.B6 -
PE 2 2 4 6 8
-PE1 9
/14.C7 /18.F2
-F204:4 -F01:2 (-X105)
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR REU615 F01 Binary Input Circuit-1 +01YS
Print: 4/5/2021
A A
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
/17.B8
-XB2:23
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
33 34 35 36 37 38 39 40
D D
-F01
-X105 1 -X105 3 -X105 5 -X105 7 -X105 8 -X105 10 -X105 11 -X105 13
+ + + + + + + +
2 4 6 9 12
/17.F8
-F01:8 (-X130)
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR REU615 F01 Binary Input Circuit-2 +01YS
Print: 4/5/2021
Spare
Spare
Spare
/20.E3
/20.E5
/20.E6
/20.E4
B B
-K1:13, -DSY:1
N
-K1:33, -DSY:2
-K1:43, -DSY:3
Y
-K1:53, -DSY:4
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
D D
-F01
-X130 9 -X130 11 -X130 13 -X130 15 -X130 17
10 12 14 16 18
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR REU615 F01 Analouge Input Circuit +01YS
Print: 4/5/2021
A A
-VTA -VTB
Voltage transformer Voltage transformer
275kV/√3: 110V, -VA, 275kV/√3: 110V , -VA,
B Class - Class -
B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Y Y
C C
/29.A7
/29.A7
/29.A7
/29.A7
3
3
1
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
-F301 -F302
2
4
D D
2
4
/29.B1
/29.B1
/29.B1
/29.B2
/29.B2
/29.B2
/29.B2
/29.B1
44
44
34
34
14
54
54
14
-K1
-K1
-K1
-K2
-K2
-K2
-K2
-K1
43
13
33
33
43
53
53
13
-F01:12 (-X130)
-F01:10 (-X130)
-F01:11 (-X130)
-F01:9 (-X130)
E E
-DSY:1
-DSY:2
-DSY:3
-DSY:4
N
N
N
Y
/19.B4
/22.A2
/22.A2
/19.B3
/19.B3
/22.D2
/22.D2
/21.D7
/21.D7
/19.B4
/21.E7
/21.E7
To Voltage Transducer To Voltage Transducer
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR VT Supply for Synchronizing +01YS
Print: 4/5/2021
A A
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Synchronoscope
Double Voltmeter Double Freqency Meter
C 1 3 1 3 1 3 C
2 4 2 4 2 4
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
D D
Y
/20.E3
-F01:9 (-X130)
N
/20.E4
-F01:10 (-X130)
Y
/20.E5
-F01:11 (-X130)
N
E /20.E6 E
-F01:12 (-X130)
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR VT Circuit Looping +01YS
Print: 4/5/2021
3
17
SPARE OUTPUT-2
4 4-20mA PT-1
B 18 SECURE PT611-15F B
-VFTD2
MAIN BUS FREQUENCY TRANSDUCER
1 13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C 7 C
17
SPARE OUTPUT-2
8 4-20mA PT-1
18 SECURE PT611-15F
-VFTD3
RESERVE BUS VOLTAGE TRANSDUCER
-XV:7
/20.E7 1 13
FROM RESERVE BUS VOLTAGE INPUT VOLTAGE AUX. POWER
275kV / 110V AC -XV:8 0-110V AC 110V DC
/20.E7 3 14
-XB5
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
9
15
D TO CMS OUTPUT-1 D
10 4-20mA
16
11
17
SPARE OUTPUT-2
12 4-20mA PT-1
18 SECURE PT611-15F
-VFTD4
RESERVE BUS FREQUENCY TRANSDUCER
1 13 /23.A8
INPUT VOLTAGE AUX. POWER
0-110V AC 110V DC
E 3 14 /23.A8 E
-XB5
13
15
TO CMS OUTPUT-1
14 4-20mA
16
15
17
SPARE OUTPUT-2
16 4-20mA PT-1
18 SECURE PT611-15F
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Transducer Circuit +01YS
Print: 4/5/2021
BUSCOUPLER CT 4
RATIO 250/1A 32 2 INPUT Y PH CURRENT
B 7 B
33 3 INPUT B PH CURRENT
9
34 4
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
-XB5
17
21
OUTPUT-1 R PH CURRENT
18 4-20mA
22
19
23
C TO CMS OUTPUT-2 Y PH CURRENT
C
20 4-20mA
24
21
25
OUTPUT-3 B PH CURRENT
22 4-20mA
26
23
27
SPARE OUTPUT-4
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
24 4-20mA
28
D D
SECURE
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Transducer Circuit +01YS
Print: 4/5/2021
Lamp Test
Sync Ok
/14.D7
-F205:2
B B
/29.C3
/29.B3
/29.B7
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
13
14
54
-PB02
-K3
-K9
13
53
14
C C
3
-XB3
-XB3
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
4
2
D D
X1 X1
-L1 -L2
X2 X2
E E
/14.D7
-F205:4
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR Lamp Indication Circuit +01YS
Print: 4/5/2021
F
E
B
C
A
B
C
A
Rev.
1
1
Revision note
-X100
-XB2
5
3
47
REU615
4
Internal Relay Fail
Date
/27.B3
12.12.18
27.07.18
05.04.21
#IRF
2
2
-K10
48
-XB2
23 24 Bus Coupler Opened
RT/TR
RT/TR
RP/TR
Prep.
/29.B7
SR
SR
SR
Check.
-K9
49
-XB2
23 24
KQ
KQ
Bus Coupler Closed
App.
AK/KQ
/29.B7
Owner
-K3
-XB2
50
3
23 24
3
Sync Ok
/29.B3
-K1
51
-XB2
63 64 Local Selected
/29.C1
SARAWAK ENERGY
-K2
52
-XB2
63 64 Remote Selected
4
4
/29.C2
Checked
Prepared
53
-XB2
Approved 27.07.18
27.07.18
27.07.18
-K6
54
-XB2
23 24 Main Bus
/29.B5 Isolator Open
5
5
-K5
55
-XB2
23 24 Main Bus
AK/KQ
SR
/29.B4 Isolator closed
Doc. no.
-K8
56
-XB2
23 24 Reserve Bus
/29.B6 Isolator open
-K7
57
6
-XB2
6
23 24 Reserve Bus
Station CMS Circuit
-F301
59
-XB2
-F302
60
-XB2
/29.B7 Tripped
61
-XB2
8
8
Sheet
Ref.Des.
Next sheet
26
25 of 29
+01YS
=BC01 F
E
B
C
A
D
Print: 4/5/2021 C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. © Copyright 2018 ABB
F
E
B
C
A
B
C
A
Rev.
1
1
Revision note
62
-XB2
33 34
63
-XB2
-K7
64
-XB2
43 44 Reserve Bus
Date
/29.B5 Isolator closed
12.12.18
27.07.18
05.04.21
65
-XB2
2
2
RT/TR
RT/TR
RP/TR
-K8
Prep.
66
-XB2
33 34 Reserve Bus
/29.B6 Isolator open
SR
SR
SR
Check.
67
-XB2
KQ
KQ
App.
AK/KQ
-K8
68
-XB2
43 44 Reserve Bus
Owner
/29.B6 Isolator open
69
-XB2
3
3
-K9
70
-XB2
-K9
72
-XB2
SARAWAK ENERGY
73
-XB2
4
4
-K10
Checked
Prepared
74
-XB2
Approved 27.07.18
27.07.18
27.07.18
-K10
76
-XB2
5
5
-K3
78
-XB2
33 34 Sync Ok
/29.B3
AK/KQ
SR
79
-XB2
Doc. no.
-K5
80
-XB2
33 34 Main Bus
/29.B4 Isolator closed
81
-XB2
6
6
-K5
82
-XB2
43 44 Main Bus
/29.B4 Isolator closed
Spare Signals Circuit-1
17007-ABB-SYN-0003
83
-XB2
-K6
84
-XB2
33 34 Main Bus
/29.B5 Isolator Open
85
-XB2
-K6
7
86
-XB2
43 44 Main Bus
/29.B5 Isolator Open
87
-XB2
-K11
88
-XB2
13 14
Spare
/29.C1
89
-XB2
-K12
90
-XB2
13 14
Spare
8
8
/29.C2
Sheet
Ref.Des.
91
-XB2
Next sheet
27
26 of 29
+01YS
=BC01 F
E
B
C
A
D
1 2 3 4 5 6 7 8
© Copyright 2018 ABB
8 22 9 + 8
Spare Main Bus Voltage Spare /18.E5
/19.E3
9 20 10 -
P1#P02 #U_SYN VT: 110-120V P2#BI.05 24-250VDC
C 10 23 11 + 10 C
Spare Reserve Bus Voltage Spare
/19.E4 /18.E6
11 24 12 - 9
Spare P1#P04 #U1 VT: 110-120V P2#BI.06 24-250VDC
12 13 + 11
P1#S01 Spare Spare Spare /18.E6
TCS /19.E5
13 14 -
Sync Ok P1#P04 #U2 VT: 110-120V P2#BI.07 24-250VDC
/15.D4
14 15 + 13
P1#S02 Spare Spare
/19.E6 /18.E7
16 - 12
#U3 VT: 110-120V P2#BI.08 24-250VDC
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
17
D Spare D
/19.E7
18
#U0 VT: 110-120V
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR F01 Overview-1 +01YS
Print: 4/5/2021
-F01
A Communication interface module A
COM0001
100Base-TX
-X1
LAN
#LAN 100Base-TX
B B
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
C:\Users\inshsha14\Documents\SheSha\2. Projects\1. Batang AI\Asbuilt Drg_30.03.2021\Buscoupler_Rev C.e3s
D D
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR F01 Overview-2 +01YS
Print: 4/5/2021
A -F101 -F102 -F201 -F202 -F203 -F204 -F205 -F206 -F301 -F302 A
2 1 1/2 2/1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1
/13.B3 /13.D5 /14.B2 /14.D3 /14.B6 /14.C6 /14.D6 /14.D6 /20.D3 /20.D5
4 3 3/4 4/3 4 3 4 3 4 3 4 3 4 3 4 3 4 3 4 3
/13.E3 /13.D5 /14.C2 /14.E3 /14.B6 /14.C6 /14.D6 /14.E6 /20.D4 /20.D6
13 14 14 11 13 14 13 14 13 14 13 14 13 14 13 14 13 14 13 14
12
21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22 21 22
/25.E7 /25.E7
AC MCB Fail DC Supply - 1 DC Supply - 2 DC Supply - 2 Power Supply to Power Supply to Power Supply to
RCCB for AC Socket Healthy Healthy REU615 Sync 5500 Transducer Circuit
B -K1 -K2 -K3 -K4 -K5 -K6 -K7 -K8 -K9 -K10 B
/15.E2 /15.E3 /15.E4 /15.E5 /16.E3 /16.E3 /16.E4 /16.E4 /16.E5 /16.E6
13 14 13 14 13 14 13 14 13 14 13 14 13 14 13 14 13 14 13 14
/20.D3 /20.D4 /24.C4 /17.B6 /17.B5
23 24 23 24 23 24 23 24 23 24 23 24 23 24 23 24 23 24 23 24
/15.D5 /15.C6 /25.E3 /25.E5 /25.E5 /25.E6 /25.E6 /25.E3 /25.E2
33 34 33 34 33 34 33 34 33 34 33 34 33 34 33 34 33 34 33 34
/20.D4 /20.D4 /26.E5 /26.E6 /26.E7 /26.E1 /26.E2 /26.E3 /26.E4
43 44 43 44 43 44 43 44 43 44 43 44 43 44 43 44 43 44 43 44
/20.D5 /20.D5 /26.E6 /26.E7 /26.E2 /26.E3 /26.E4 /26.E5
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
53 54 53 54 53 54
/20.D6 /20.D6 Sync Ok Sync. Release Main Bus Main Bus Reserve Bus Reserve Bus /24.C5 Bus Coupler Opened
63 64 63 64 Isolator closed Isolator Open Isolator closed Isolator open 63 64
/25.E4 /25.E4
73 74 73 74 73 74
83 84 83 84 83 84
C C
D D
E E
Ref.Des.
F
Rev. Revision note Date Prep. Check. App. Owner Prepared 27.07.18 RP/TR Title Bus Coupler Synchrocheck Panel GA & Schematic Drawing =BC01 F
Checked 27.07.18 SR List of Aux. Contacts +01YS
Print: 4/5/2021