Rab Polsek Tikke Raya 2024

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 46

BIAYA BPJS KETENAGAKERJAAN

BPJS KETENAGAKERJAAN NILAI FISIK = Rp 1,200,000,000.00


Jumlah
NO. Uraian Program Koefisien Satuan Harga Satuan Harga
(%) Persen ( Rp ) ( Rp )

1 NKKK ≤ Rp. 100.000.000,- JKK 0.21% Persen 100,000,000.00 210,000.00


JKM 0.03% Persen 100,000,000.00 30,000.00

2 Rp. 100.000.000 > KKK ≥ Rp. 500.000.000,- JKK 0.17% Persen 400,000,000.00 680,000.00
JKM 0.02% Persen 400,000,000.00 80,000.00

;3. Rp. 500.000.000 > NKKK ≥ Rp. 1.000.000.000,- JKK 0.13% Persen 500,000,000.00 650,000.00
JKM 0.02% Persen 500,000,000.00 100,000.00

4. Rp. 1.000.000.000 > NKKK ≥ Rp. 5.000.000.000,- JKK 0.11% Persen 200,000,000.00 220,000.00
JKM 0.01% Persen 200,000,000.00 20,000.00

5. NKKK > Rp. 5.000.000.000,- JKK 0.09% Persen -


JKM 0.01% Persen -
Sub Total Biaya BPJS Ketenagakerjaan 1,990,000.00
REKAPITULASI ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN KANTOR POLSEK TIKKE RAYA
LOKASI KEC. TIKKE RAYA, KAB. PASANGKAYU

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

A PEKERJAAN PERSIAPAN Rp 6,000,000.00


B PEKERJAAN TANAH DAN PONDASI Rp 226,951,333.35
C PEKERJAAN STRUKTUR BETON Rp 174,189,064.83
D PEKERJAAN ARSITEKTUR Rp 630,543,089.73
E PEKERJAAN MEKANIKAL & ELETRIKAL Rp 33,811,602.00
G PEKERJAAN PLUMBING Rp 23,503,123.50

REAL COST : Rp 1,094,998,213.41


PPN 11% : Rp 120,449,803.48
JKM+JKK Rp 1,990,000.00
TOTAL : Rp 1,217,438,016.89
DIBULATKAN : Rp 1,217,400,000.00
TERBILANG :
SATU MILYAR DUA RATUS TUJUH BELAS JUTA EMPAT RATUS RIBU RUPIAH

DIBUAT OLEH
CV. ARLINDO KONSULTAN

EDHY P. PUTRA
DIREKTUR
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR POLSEK TIKKE RAYA
LOKASI : KEC. TIKKE RAYA, KAB. PASANGKAYU

NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A PEKERJAAN PERSIAPAN
1 Pekerjaan Mobilisasi dan Demobilisasi Ls 1.00 4,500,000.00 4,500,000.00
2 Pemasangan Bouwplank Ls 1.00 1,500,000.00 1,500,000.00
Jumlah A 6,000,000.00
B PEKERJAAN TANAH DAN PONDASI
1 Pondasi Poer
- Galian Pondasi Poer M3 49.50 81,675.00 4,042,912.50
- Bekisting Pondasi M2 12.50 190,278.00 2,378,475.00
- Pembesian Kg 1,359.38 19,549.75 26,575,588.03
- Beton K225 M3 6.25 1,361,014.02 8,506,337.65
2 Pondasi Garis -
- Galian tanah biasa M3 40.86 81,675.00 3,337,240.50
- Urugan Tanah Kembali M3 12.78 58,850.00 752,103.00
- Urugan Pasir M3 5.11 164,670.00 841,052.03
- Lantai kerja (K-125) M3 7.15 1,134,361.64 8,111,252.93
3 Pasangan Batu Kosong M3 23.48 382,849.50 8,989,306.26
4 Pondasi Batu Gunung M3 44.59 913,467.50 40,729,232.16
5 Urugan Tanah bawah Lantai M3 472.88 201,025.00 95,059,696.88
6 Urugan Pasir Bawah lantai M3 15.76 164,670.00 2,595,610.88
7 Rabat beton bawah lantai M3 22.07 1,134,361.64 25,032,525.55
Jumlah B 226,951,333.35
C PEKERJAAN STRUKTUR BETON
1 Pedestal Kolom
- Bekisting Kolom M2 12.50 342,955.25 4,286,940.63
- Pembesian Kg 395.79 19,549.75 7,737,654.20
- Beton K225 M3 1.56 1,361,014.02 2,126,584.41
2 Kolom K1
- Bekisting Kolom M2 61.25 342,955.25 21,006,009.06
- Pembesian Kg 628.34 19,549.75 12,283,827.36
- Beton K225 M3 10.72 1,361,014.02 14,588,369.07
3 Sloof (S1)
- Bekisting Sloof M2 45.75 190,278.00 8,705,218.50
- Pembesian Kg 1,173.32 19,549.75 22,938,167.41
- Beton K225 M3 13.14 1,361,014.02 17,883,724.27
4 Balok (B1) / Ringbalk
- Bekisting Balok M2 30.50 349,349.00 10,655,144.50
- Pembesian Kg 822.33 19,549.75 16,076,322.46
- Beton K225 M3 4.58 1,361,014.02 6,226,639.16
5 Dinding Beton
- Bekisting Dinding M2 16.00 383,861.50 6,141,784.00
- Pembesian Kg 263.11 19,549.75 5,143,756.44
- Beton K225 M3 1.92 1,361,014.02 2,613,146.93
6 Kanopy Beton Teas
- Bekisting Plat M2 3.90 452,955.25 1,766,525.47
- Pembesian Kg 98.67 19,549.75 1,928,908.67
- Beton K225 M3 0.72 1,361,014.02 979,930.10
7 Kolom Praktis M' 64.00 108,268.05 6,929,155.20
8 Balok Latai M' 36.00 115,868.25 4,171,257.00
Jumlah C 174,189,064.83
D PEKERJAAN ARSITEKTUR

1 Pekerjaan lantai
- Lantai keramik 60x60 M2 293.50 371,706.50 109,095,857.75
- Lantai Keramik 20x20 Toilet M2 27.75 169,499.00 4,703,597.25
2 Pekerjaan Dinding
- Pasangan 1/2 Bata 1:4 M2 452.52 160,050.00 72,425,826.00
- Plasteran T= 15mm M2 905.04 72,838.26 65,921,538.83
- Acian semen M2 841.84 42,625.00 35,883,430.00
- Keramik dnding 20x40 Toilet M2 63.20 291,681.50 18,434,270.80
- Pengecatan dinding M2 841.84 26,083.75 21,958,344.10
3 Pekerjaan Atap -
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

- Rangka Atap baja ringan M2 364.50 194,975.00 71,068,387.50


- Atap spandek M2 364.50 87,967.00 32,063,971.50
- List Plank woodplank 30 cm M 94.00 90,530.00 8,509,820.00
- Pengecatan Listplank M2 28.20 26,083.75 735,561.75
- Nok Atap Aluminium Zink M 97.00 127,396.50 12,357,460.50
4 Pekerjaan Plafon -
- Rangka Plafon M2 307.20 194,975.00 59,896,320.00
- Plafon Gypsum t=9mm M2 188.25 87,967.00 16,559,787.75
- Plafon kalsiboard T= 3mm M2 118.95 90,530.00 10,768,543.50
- Pengecatan Plafon M2 307.20 26,083.75 8,012,928.00
` 6 Pekerjaan Rabat Beton Keliling Bangunan
- Pasangan 1/2 Bata 1:4 M2 - 160,050.00 -
- Plasteran T= 15mm M2 - 72,838.26 -
- Rabat Beton K 225 Keliling Bangunan m3 - 1,361,014.02 -
- RAMP Beton K 225 Naik Teras m3 - 1,361,014.02 -
` 7 Pekerjaan Saluran Keliling 30x30
- Pasangan 1/2 Bata 1:4 M2 - 160,050.00 -
- Plasteran T= 15mm M2 - 72,838.26 -
- Rabat Beton K 225 m3 - 1,361,014.02 -
8 Pintu Type P1 Panil Kayu Unit 4.00 4,000,000.00 16,000,000.00
9 Pintu Type P2 Panil Kayu Unit 7.00 2,500,000.00 17,500,000.00
10 Pintu Aluminium kamar mandi Unit 2.00 1,623,722.25 3,247,444.50
11 Jeruji Besi Hollow Galvanis (4x4 & 2x4) + Pintu m2 - 2,000,000.00 -
12 Kuncian + Gembok Pintu Jeruji Set - 500,000.00 -
13 Rangka Pengaman Atas Plafond Hollow Galvanis (2x4) m2 - 1,500,000.00 -
14 Jendela alluminium 2 mata Powder coating Unit 19.00 2,350,000.00 44,650,000.00
15 Ventilasi Aluminium V1 Unit 1.00 750,000.00 750,000.00
Jumlah D 630,543,089.73
E PEKERJAAN MEKANIKAL & ELETRIKAL

1 Penyambungan listrik Watt - 1,500.00 -


2 Pemasangan titik nyala Titik 53.00 473,616.00 25,101,648.00
3 Downligt LED Titik 34.00 165,000.00 5,610,000.00
4 Pasangan Saklar Tunggal Titik 12.00 42,625.00 511,500.00
5 Pasangan Saklar Ganda Titik 11.00 48,400.00 532,400.00
6 Pasangan Stop Kontak Titik 19.00 44,935.00 853,765.00
7 Mesin Pompa Air+ accessories Ls - 2,500,000.00 -
8 Pasangan MCB Titik 3.00 400,763.00 1,202,289.00

Jumlah E 33,811,602.00
F PEKERJAAN PLUMBING

1 Pipa Air bersih 3/4" M 76.00 24,420.00 1,855,920.00


2 Pipa Disposal PVC 3" M 46.00 73,367.25 3,374,893.50
3 Kloset Jongkok + accessories Set 1.00 1,095,655.00 1,095,655.00
4 Kloset Duduk + accessories Set 1.00 5,176,655.00 5,176,655.00
5 Watafel + accessories Set - 1,099,870.20 -
6 Tangki Air bersih 1 m3 Bh - 2,750,000.00 -
7 Tower Bak Air Tinggi 2,5m Ls - 6,500,000.00 -
8 Septick Tank Ls 2.00 6,000,000.00 12,000,000.00

Jumlah F 23,503,123.50
M3 Penggalian 1 m3 Tanah Biasa Sedalam 1 M 81,675.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 95,000.00 71,250.00
Mandor L.02 OH 0.025 120,000.00 3,000.00
JUMLAH HARGA TENAGA KERJA 74,250.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 74,250.00


E Overhead & Profit 10% x D 10% 7,425.00
F Harga Satuan Pekerjaan (D+E) 81,675.00

M3 Pengurugan kembali galian tanah 58,850.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH HARGA TENAGA KERJA 53,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,500.00


E Overhead & Profit 10% x D 10% 5,350.00
F Harga Satuan Pekerjaan (D+E) 58,850.00

Pengurugan 1 m3 sirtu padat


M3 201,025.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Mandor L.02 OH 0.025 120,000.00 3,000.00
JUMLAH HARGA TENAGA KERJA 26,750.00
B BAHAN
Sirtu m3 1.200 130,000.00 156,000.00
JUMLAH HARGA BAHAN 156,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 182,750.00


E Overhead & Profit 10% x D 10% 18,275.00
F Harga Satuan Pekerjaan (D+E) 201,025.00

M3 Pengurugan dengan pasir urug 164,670.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH HARGA TENAGA KERJA 29,700.00
B BAHAN
Pasir Urug m3 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,700.00


E Overhead & Profit 10% x D 10% 14,970.00
F Harga Satuan Pekerjaan (D+E) 164,670.00

Pemasangan batu kosong (anstamping)


M3 382,849.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 95,000.00 74,100.00
Tukang Batu L.02 OH 0.390 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.039 135,000.00 5,265.00
Mandor L.04 OH 0.039 120,000.00 4,680.00
JUMLAH HARGA TENAGA KERJA 130,845.00
B BAHAN
Batu belah m3 1.200 145,000.00 174,000.00
Pasir Urug m3 0.432 100,000.00 43,200.00
JUMLAH HARGA BAHAN 217,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 348,045.00


E Overhead & Profit 10% x D 10% 34,804.50
F Harga Satuan Pekerjaan (D+E) 382,849.50

M3 Pemasangan pondasi batu belah campuran 1SP : 4PP 913,467.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 95,000.00 142,500.00
Tukang Batu L.02 OH 0.750 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.075 135,000.00 10,125.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH HARGA TENAGA KERJA 251,625.00
B BAHAN
Batu belah m3 1.200 200,000.00 240,000.00
Semen portland Kg 163.000 1,600.00 260,800.00
Pasir Pasang (PP) m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 578,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 830,425.00


E Overhead & Profit 10% x D 10% 83,042.50
F Harga Satuan Pekerjaan (D+E) 913,467.50

m3 Beton mutu f’c = 21,7 Mpa 1,361,014.02

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 135,000.00 3,780.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH HARGA TENAGA KERJA 203,490.00
B BAHAN
Semen portland Kg 384.000 1,600.00 614,400.00
Pasir Beton (PB) kg 692.000 142.86 98,857.14
Kerikil (Maks 30 mm) kg 1039.000 303.33 315,163.33
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 1,033,795.48
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,237,285.48


E Overhead & Profit 10% x D 10% 123,728.55
F Harga Satuan Pekerjaan (D+E) 1,361,014.02

Pembesian 10 kg dengan besi polos atau besi ulir

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 95,000.00 6,650.00
Tukang Besi L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 135,000.00 945.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH HARGA TENAGA KERJA 16,475.00
B BAHAN
Besi beton Kg 10.500 15,000.00 157,500.00
Kawat Beton kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 161,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 177,725.00


E Overhead & Profit 10% x D 10% 17,772.50
F Harga Satuan Pekerjaan (D+E) 195,497.50

Kg Pembesian dengan besi polos atau besi ulir 19,549.75

M2 Pemasangan bekisting untuk pondasi 174,053.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 135,000.00 3,510.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH HARGA TENAGA KERJA 87,230.00
B BAHAN
Papan Kayu Kelas III m3 0.040 1,750,000.00 70,000.00
Paku kg 0.300 20,000.00
Minyak begisting liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 71,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 158,230.00


E Overhead & Profit 10% x D 10% 15,823.00
F Harga Satuan Pekerjaan (D+E) 174,053.00

M3 Lantai kerja beton mutu f’c = 7,4 Mpa 1,134,361.64

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 135,000.00 3,780.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH HARGA TENAGA KERJA 203,490.00
B BAHAN
Semen portland Kg 247.000 1,600.00 395,200.00
Pasir Beton (PB) kg 869.000 142.86 124,142.86
Kerikil (Maks 30 mm) kg 999.000 303.33 303,030.00
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 827,747.86
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,031,237.86


E Overhead & Profit 10% x D 10% 103,123.79
F Harga Satuan Pekerjaan (D+E) 1,134,361.64

M3 Rabat beton mutu f’c = 16,9 Mpa 1,308,153.26

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 95,000.00 156,750.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 135,000.00 3,780.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH HARGA TENAGA KERJA 203,490.00
B BAHAN
Semen portland Kg 352.000 1,600.00 563,200.00
Pasir Beton (PB) kg 731.000 142.86 104,428.57
Kerikil (Maks 30 mm) m3 1031.000 303.33 312,736.67
Air Liter 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 985,740.24
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,189,230.24


E Overhead & Profit 10% x D 10% 118,923.02
F Harga Satuan Pekerjaan (D+E) 1,308,153.26

M2 Pemasangan bekisting untuk kolom 342,955.25

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 110,715.00
B BAHAN
Papan Kayu kelas III m3 0.040 1,750,000.00 70,000.00
Paku kg 0.400 20,000.00 8,000.00
Minyak begisting Liter 0.200 10,000.00 2,000.00
Kayu Kelas II m3 0.015 1,937,500.00 29,062.50
Playwood Tebal 9mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø (8 -10) cm, Panjang btg 2.000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 201,062.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 311,777.50


E Overhead & Profit 10% x D 10% 31,177.75
F Harga Satuan Pekerjaan (D+E) 342,955.25

M2 Pemasangan bekisting untuk Balok 349,349.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 110,715.00
B BAHAN
Papan Kayu kelas III m3 0.040 1,750,000.00 70,000.00
Paku kg 0.400 20,000.00 8,000.00
Minyak begisting Liter 0.200 10,000.00 2,000.00
Kayu Kelas II m3 0.018 1,937,500.00 34,875.00
Playwood Tebal 9mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø (8 -10) cm, Panjang btg 2.000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 206,875.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 317,590.00


E Overhead & Profit 10% x D 10% 31,759.00
F Harga Satuan Pekerjaan (D+E) 349,349.00

M2 Pemasangan bekisting untuk sloof 190,278.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.026 135,000.00 3,510.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH HARGA TENAGA KERJA 87,230.00
B BAHAN
Papan Kayu kelas III m3 0.045 1,750,000.00 78,750.00
Paku kg 0.300 20,000.00 6,000.00
Minyak begisting liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 85,750.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 172,980.00
E Overhead & Profit 10% x D 10% 17,298.00
F Harga Satuan Pekerjaan (D+E) 190,278.00

Pemasangan bekisting untuk Plat 452,955.25

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 110,715.00
B BAHAN
Papan Kayu kelas III m3 0.040 1,750,000.00 70,000.00
Paku kg 0.400 20,000.00 8,000.00
Minyak begisting Liter 0.200 10,000.00 2,000.00
Kayu Kelas II m3 0.015 1,937,500.00 29,062.50
Playwood Tebal 9mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø (8 -10) cm, Panjang btg 6.000 25,000.00 150,000.00
JUMLAH HARGA BAHAN 301,062.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 411,777.50


E Overhead & Profit 10% x D 10% 41,177.75
F Harga Satuan Pekerjaan (D+E) 452,955.25

Pemasangan bekisting untuk Dinding 383,861.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.033 135,000.00 4,455.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH HARGA TENAGA KERJA 110,715.00
B BAHAN
Papan Kayu kelas III m3 0.030 1,750,000.00 52,500.00
Paku kg 0.400 20,000.00 8,000.00
Minyak begisting Liter 0.200 10,000.00 2,000.00
Kayu Kelas II m3 0.020 1,937,500.00 38,750.00
Playwood Tebal 9mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu Ø (8 -10) cm, Panjang btg 3.000 25,000.00 75,000.00
Formite/penjaga jarak bekisting/s bh 4.000 5,000.00 20,000.00
JUMLAH HARGA BAHAN 238,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 348,965.00


E Overhead & Profit 10% x D 10% 34,896.50
F Harga Satuan Pekerjaan (D+E) 383,861.50

M kolom praktis beton bertulang (11 x 11) cm 108,268.05

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.180 95,000.00 17,100.00
Tukang Batu L.02 OH 0.020 120,000.00 2,400.00
Tukang Kayu L.02 OH 0.020 120,000.00 2,400.00
Tukang Besi L.02 OH 0.020 120,000.00 2,400.00
Kepala Tukang L.03 OH 0.006 135,000.00 810.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH HARGA TENAGA KERJA 26,190.00
B BAHAN
Papan Kayu kelas III m3 0.002 1,750,000.00 3,500.00
Paku kg 0.010 20,000.00 200.00
Minyak begisting Liter 0.100 10,000.00 1,000.00
Besi beton kg 3.000 15,000.00 45,000.00
Kawat beton kg 0.450 25,000.00 11,250.00
Semen Portland kg 4.000 1,600.00 6,400.00
Pasir Beton m3 0.006 200,000.00 1,200.00
Kerikil m3 0.009 409,500.00 3,685.50
JUMLAH HARGA BAHAN 72,235.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,425.50


E Overhead & Profit 10% x D 10% 9,842.55
F Harga Satuan Pekerjaan (D+E) 108,268.05

M Ring balok beton bertulang (10 x 15) cm 134,076.25

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.297 95,000.00 28,215.00
Tukang Batu L.02 OH 0.033 120,000.00 3,960.00
Tukang Kayu L.02 OH 0.033 120,000.00 3,960.00
Tukang Besi L.02 OH 0.033 120,000.00 3,960.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH HARGA TENAGA KERJA 43,245.00
B BAHAN
Papan Kayu kelas III m3 0.003 1,750,000.00 5,250.00
Paku kg 0.020 20,000.00 400.00
Minyak begisting Liter 0.100 10,000.00 1,000.00
Besi beton kg 3.600 15,000.00 54,000.00
Kawat beton kg 0.050 25,000.00 1,250.00
Semen Portland kg 5.500 1,600.00 8,800.00
Pasir Beton m3 0.009 200,000.00 1,800.00
Kerikil m3 0.015 409,500.00 6,142.50
JUMLAH HARGA BAHAN 78,642.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 121,887.50


E Overhead & Profit 10% x D 10% 12,188.75
F Harga Satuan Pekerjaan (D+E) 134,076.25

M2 Pemasangan lantai keramik 40x40 Polished 275,456.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Keramik 40 x 40 cm Doss 1.050 90,000.00 94,500.00
Semen Portland Kg 14.150 1,600.00 22,640.00
Pasir pasang (PP) M3 0.039 150,000.00 5,850.00
Semen warna Kg 0.667 15,000.00 10,000.00
JUMLAH HARGA BAHAN 132,990.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 250,415.00


E Overhead & Profit 10% x D 10% 25,041.50
F Harga Satuan Pekerjaan (D+E) 275,456.50

M2 Pemasangan Granit 60x60 371,706.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Granit 60/60 Bh 2.800 65,000.00 182,000.00
Semen Portland Kg 14.150 1,600.00 22,640.00
Pasir pasang (PP) M3 0.039 150,000.00 5,850.00
Semen warna Kg 0.667 15,000.00 10,000.00
JUMLAH HARGA BAHAN 220,490.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 337,915.00


E Overhead & Profit 10% x D 10% 33,791.50
F Harga Satuan Pekerjaan (D+E) 371,706.50

M2 Pemasangan lantai keramik ukuran 40 cm x 40 cm, Unpolish 297,456.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Keramik 40 x 40 cm Bh 1.050 90,000.00 94,500.00
Semen Portland Kg 14.150 1,600.00 22,640.00
Pasir pasang (PP) M3 0.039 150,000.00 5,850.00
Semen warna Kg 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 152,990.00

D Jumlah (A+B+C) 270,415.00


E Overhead & Profit 10% x D 10% 27,041.50
F Harga Satuan Pekerjaan (D+E) 297,456.50

M2 Pemasangan keramik dinding 20 cm x 40 cm 291,681.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Keramik 20 x 40 cm Doos 1.050 85,000.00 89,250.00
Semen Portland Kg 14.150 1,600.00 22,640.00
Pasir pasang (PP) M3 0.039 150,000.00 5,850.00
Semen warna Kg 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 147,740.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 265,165.00


E Overhead & Profit 10% x D 10% 26,516.50
F Harga Satuan Pekerjaan (D+E) 291,681.50

M2 Pemasangan lantai keramik ukuran 20 cm x 20 cm, Unpolish 169,499.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Ubin Keramik 20/20 doos 1.050 5,500.00 5,775.00
Semen Portland Kg 10.400 1,600.00 16,640.00
Pasir pasang (PP) M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 36,665.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 154,090.00


E Overhead & Profit 10% x D 10% 15,409.00
F Harga Satuan Pekerjaan (D+E) 169,499.00

M2 Dinding bata merah cm tebal 1/2 Batu Campuran 1SP : 4PP 160,050.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH HARGA TENAGA KERJA 43,650.00
B BAHAN
Bata Merah Buah 70.000 1,100.00 77,000.00
Semen Portland Kg 11.500 1,600.00 18,400.00
Pasir pasang (PP) M3 0.043 150,000.00 6,450.00
JUMLAH HARGA BAHAN 101,850.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 145,500.00


E Overhead & Profit 10% x D 10% 14,550.00
F Harga Satuan Pekerjaan (D+E) 160,050.00

M2 Plesteran 1SP : 3PP tebal 15 mm 72,838.26

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.150 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.015 135,000.00 2,025.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH HARGA TENAGA KERJA 50,325.00
B BAHAN
Semen Portland kg 7.776 1,600.00 12,441.60
Pasir pasang (PP) m3 0.023 150,000.00 3,450.00
JUMLAH HARGA BAHAN 15,891.60
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,216.60
E Overhead & Profit 10% x D 10% 6,621.66
F Harga Satuan Pekerjaan (D+E) 72,838.26

M2 Acian Semen 42,625.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH HARGA TENAGA KERJA 33,550.00
B BAHAN
Semen portland kg 3.250 1,600.00 5,200.00
JUMLAH HARGA BAHAN 5,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,750.00


E Overhead & Profit 10% x D 10% 3,875.00
F Harga Satuan Pekerjaan (D+E) 42,625.00

Drainase Saluran Terbuka Volume Sat Harga Total


Galian 0.09 m3

M2 Rangka Atap baja Ringan 194,975.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Tukang Kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.050 135,000.00 6,750.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH HARGA TENAGA KERJA 117,250.00
B BAHAN
Baja Ringan C.75 m 3.000 20,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 177,250.00


E Overhead & Profit 10% x D 10% 17,725.00
F Harga Satuan Pekerjaan (D+E) 194,975.00

M2 Pemasangan Atap Soka 87,967.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang Kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH HARGA TENAGA KERJA 32,470.00
B BAHAN
Atap Soka Lembar 0.700 65,000.00 45,500.00
Skrup Bh 8.000 250.00 2,000.00
JUMLAH HARGA BAHAN 47,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 79,970.00


E Overhead & Profit 10% x D 10% 7,997.00
F Harga Satuan Pekerjaan (D+E) 87,967.00

M Pemasangan 1 m’ nok alumunium 127,396.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.007 135,000.00 945.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH HARGA TENAGA KERJA 24,315.00
B BAHAN
Bubungan Atap Spandek m 1.050 85,714.29 90,000.00
Skrup bh 6.000 250.00 1,500.00
JUMLAH HARGA BAHAN 91,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 115,815.00


E Overhead & Profit 10% x D 10% 11,581.50
F Harga Satuan Pekerjaan (D+E) 127,396.50

M2 Rangka Plafon Hollow modul 60 x 60 cm 161,562.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang Kayu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.017 120,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 82,075.00
B BAHAN
Hollow Galvalum 4x4cm m 4.000 12,000.00 48,000.00
Assesoris (perkuatan, Ls 35%
las dll) 48,000.00 16,800.00
JUMLAH HARGA BAHAN 64,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 146,875.00


E Overhead & Profit 10% x D 10% 14,687.50
F Harga Satuan Pekerjaan (D+E) 161,562.50
M2 Rangka Paritisi Kanal C.75 180,482.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.017 120,000.00 2,100.00
JUMLAH HARGA TENAGA KERJA 82,075.00
B BAHAN
Baja Ringan C.75 m 4.000 20,000.00 80,000.00
Skrup Bh 8.000 250.00 2,000.00
JUMLAH HARGA BAHAN 82,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 164,075.00


E Overhead & Profit 10% x D 10% 16,407.50
F Harga Satuan Pekerjaan (D+E) 180,482.50

M2 Langit-langit gypsum board 9 mm 51,449.75

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH HARGA TENAGA KERJA 16,775.00
B BAHAN
Gypsum board 9 mm Lembar 0.364 80,000.00 29,120.00
Skrup kg 0.110 250.00 27.50
Plamir tembok kg 0.100 8,500.00 850.00
JUMLAH HARGA BAHAN 29,997.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,772.50


E Overhead & Profit 10% x D 10% 4,677.25
F Harga Satuan Pekerjaan (D+E) 51,449.75

M2 Langit-langit Kalsi board 3,5 mm 50,514.75

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH HARGA TENAGA KERJA 16,775.00
B BAHAN
Calsiboard 120 x 240 x 3,5 mm Lembar 0.364 80,000.00 29,120.00
Skrup kg 0.110 250.00 27.50
JUMLAH HARGA BAHAN 29,147.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,922.50


E Overhead & Profit 10% x D 10% 4,592.25
F Harga Satuan Pekerjaan (D+E) 50,514.75

M2 Partisi gypsum 9 mm 50,514.75

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala Tukang L.03 OH 0.005 135,000.00 675.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH HARGA TENAGA KERJA 16,775.00
B BAHAN
Gypsum board 9 mm Lembar 0.364 80,000.00 29,120.00
Skrup kg 0.110 250.00 27.50
JUMLAH HARGA BAHAN 29,147.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,922.50


E Overhead & Profit 10% x D 10% 4,592.25
F Harga Satuan Pekerjaan (D+E) 50,514.75

M2 Pemasangan Pintu Multipleks, rangka kayu Kelas II 319,038.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang Kayu L.02 OH 0.450 120,000.00 54,000.00
Kepala Tukang L.03 OH 0.045 135,000.00 6,075.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH HARGA TENAGA KERJA 75,285.00
B BAHAN
Tripleks 6 mm m2 2.100 75,000.00 157,500.00
Kayu Kelas II m3 0.028 1,937,500.00 54,250.00
Paku m3 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 214,750.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 290,035.00


E Overhead & Profit 10% x D 10% 29,003.50
F Harga Satuan Pekerjaan (D+E) 319,038.50

M2 Pemasangan 1 m2 HPL

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 95,000.00 1,900.00
Tukang cat L.04 OH 0.200 120,000.00 24,000.00
Kepala tukang L.01 OH 0.020 135,000.00 2,700.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH HARGA TENAGA KERJA 28,900.00
B BAHAN
HPL Taco m2 1.200 100,779.36 120,935.23
Lem Kayu Kg 0.200 25,000.00 5,000.00
JUMLAH HARGA BAHAN 125,935.23
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 154,835.23


E Overhead & Profit 10% x D 10% 15,483.52
F Harga Satuan Pekerjaan (D+E) 170,318.76

Unit pekerjaan Pintu 210x80 cm, Rangka Kayu Kelas II Finishing HPL 1,516,255.70
Item pekerjaan Volume Satuan Harga Satuan Jumlah Harga
Pintu Multipleks kayu Kelas II 1.68 m2 319,038.50 535,984.68
Finishing HPL 3.36 m 2
170,318.76 572,271.02
Kunci Tanam 1 Slag 1 Bh 173,000.00 173,000.00
Engsel Pintu 7" 2 Bh 30,000.00 60,000.00
Door Close ex. Gerber 1 Bh 175,000.00 175,000.00
Total : 1,516,255.70

M Pemasangan Kusen Alluminium 4" 223,281.85

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 95,000.00 4,085.00
Tukang Besi L.02 OH 0.043 120,000.00 5,160.00
Kepala Tukang L.03 OH 0.004 135,000.00 580.50
Mandor L.04 OH 0.002 120,000.00 258.00
JUMLAH HARGA TENAGA KERJA 10,083.50
B BAHAN
Kusen Aluminium 4" m 1.100 150,000.00 165,000.00
Skrup fixer Buah 2.000 13,500.00 27,000.00
Sealant Tube 0.060 15,000.00 900.00
JUMLAH HARGA BAHAN 192,900.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 202,983.50


E Overhead & Profit 10% x D 10% 20,298.35
F Harga Satuan Pekerjaan (D+E) 223,281.85

M2 Pemasangan lantai keramik ukuran 30 cm x 30 cm 257,730.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Keramik 30 x 30 cm doos 1.050 82,500.00 86,625.00
Semen Portland Kg 10.000 1,600.00 16,000.00
Pasir pasang (PP) M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 116,875.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 234,300.00


E Overhead & Profit 10% x D 10% 23,430.00
F Harga Satuan Pekerjaan (D+E) 257,730.00

M2 Pemasangan Keramik dinding 20 cm x 40 cm 260,617.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 95,000.00 66,500.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala Tukang L.03 OH 0.035 135,000.00 4,725.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH HARGA TENAGA KERJA 117,425.00
B BAHAN
Keramik 20 x 40 cm doos 1.050 85,000.00 89,250.00
Semen Portland Kg 10.000 1,600.00 16,000.00
Pasir pasang (PP) M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 119,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 236,925.00


E Overhead & Profit 10% x D 10% 23,692.50
F Harga Satuan Pekerjaan (D+E) 260,617.50

Titik Pemasangan titik lampu 369,600.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah % 50.00 112,000.00
JUMLAH HARGA TENAGA KERJA 112,000.00
B BAHAN
Pipa Listrik btg 3.000 24,500.00 73,500.00
Kabel NYM 3X2.5mm m 7.000 14,500.00 101,500.00
Tee Doos buah 3.000 8,000.00 24,000.00
Elbow buah 4.000 1,500.00 6,000.00
Las Doop buah 3.000 6,000.00 18,000.00
Mangkok Listrik buah 1.000 1,000.00 1,000.00
JUMLAH HARGA BAHAN 224,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 336,000.00


E Overhead & Profit 10% x D 10% 33,600.00
F Harga Satuan Pekerjaan (D+E) 369,600.00

Lampu RM 4x18 Watt 400,000.00


Downlight LED 165,000.00
Lampu LED Bulat 95,000.00

m Pemasangan pipa PVC tipe AW diameter ¾ ” 24,420.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 95,000.00 3,420.00
Tukang batu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 135,000.00 810.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH HARGA TENAGA KERJA 11,670.00
B BAHAN
Pipa PVC AW 3/4" M 1.200 6,500.00 7,800.00
Perlengkapan % 0.350 7,800.00 2,730.00
JUMLAH HARGA BAHAN 10,530.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,200.00


E Overhead & Profit 10% x D 10% 2,220.00
F Harga Satuan Pekerjaan (D+E) 24,420.00

m Pemasangan pipa PVC tipe AW diameter 3” 73,367.25

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang batu L.02 OH 0.135 120,000.00 16,200.00
Kepala tukang L.03 OH 0.014 135,000.00 1,822.50
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH HARGA TENAGA KERJA 26,197.50
B BAHAN
Pipa PVC AW 3" M 1.200 25,000.00 30,000.00
Perlengkapan % 0.350 30,000.00 10,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,697.50


E Overhead & Profit 10% x D 10% 6,669.75
F Harga Satuan Pekerjaan (D+E) 73,367.25

Pipa PVC tipe AW diameter 2 ½ ” 64,457.25

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang batu L.02 OH 0.135 120,000.00 16,200.00
Kepala tukang L.03 OH 0.014 135,000.00 1,822.50
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH HARGA TENAGA KERJA 26,197.50
B BAHAN
Pipa PVC AW 2,5" M 1.200 20,000.00 24,000.00
Perlengkapan % 0.350 24,000.00 8,400.00
JUMLAH HARGA BAHAN 32,400.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,597.50


E Overhead & Profit 10% x D 10% 5,859.75
F Harga Satuan Pekerjaan (D+E) 64,457.25
Pek. Pas. Stop kontak Tunggal Rp 44,935.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 95,000.00 Rp 2,375.00
Tukang L.02 OH 0.025 120,000.00 Rp 3,000.00
Kepala Tukang L.03 OH 0.017 135,000.00 Rp 2,295.00
Mandor L.04 OH 0.014 120,000.00 Rp 1,680.00
JUMLAH TENAGA KERJA Rp 9,350.00
B BAHAN
Stop Kontak Tunggal bh 1.000 30,000.00 Rp 30,000.00
Perlengkapan Instalasi % 5.000 30,000.00 Rp 1,500.00
JUMLAH TENAGA KERJA Rp 31,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 40,850.00


E Overhead & Profit 10% x D 0.10 Rp 4,085.00
F Harga Satuan Pekerjaan (D+E) Rp 44,935.00

BH Pek. Pas. Stop Kontak AC Rp 91,135.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 95,000.00 Rp 2,375.00
Tukang L.02 OH 0.025 120,000.00 Rp 3,000.00
Kepala Tukang L.03 OH 0.017 135,000.00 Rp 2,295.00
Mandor L.04 OH 0.014 120,000.00 Rp 1,680.00
JUMLAH TENAGA KERJA Rp 9,350.00
B BAHAN
Stop Kontak AC bh 1.000 70,000.00 Rp 70,000.00
Perlengkapan Instalasi % 5.000 70,000.00 Rp 3,500.00
JUMLAH TENAGA KERJA Rp 73,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 82,850.00


E Overhead & Profit 10% x D 0.10 Rp 8,285.00
F Harga Satuan Pekerjaan (D+E) Rp 91,135.00

BH Pek. Pas. Saklar Tunggal Rp 42,625.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 95,000.00 Rp 2,375.00
Tukang L.02 OH 0.025 120,000.00 Rp 3,000.00
Kepala Tukang L.03 OH 0.017 135,000.00 Rp 2,295.00
Mandor L.04 OH 0.014 120,000.00 Rp 1,680.00
JUMLAH TENAGA KERJA Rp 9,350.00
B BAHAN
Saklar Tunggal bh 1.000 28,000.00 Rp 28,000.00
Perlengkapan Instalasi % 5.000 28,000.00 Rp 1,400.00
JUMLAH TENAGA KERJA Rp 29,400.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 38,750.00


E Overhead & Profit 10% x D 0.10 Rp 3,875.00
F Harga Satuan Pekerjaan (D+E) Rp 42,625.00

BH Pek. Pas.Saklar Ganda Rp 48,400.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 95,000.00 Rp 2,375.00
Tukang L.02 OH 0.025 120,000.00 Rp 3,000.00
Kepala Tukang L.03 OH 0.017 135,000.00 Rp 2,295.00
Mandor L.04 OH 0.014 120,000.00 Rp 1,680.00
JUMLAH TENAGA KERJA Rp 9,350.00
B BAHAN
Saklar Ganda bh 1.000 33,000.00 Rp 33,000.00
Perlengkapan Instalasi % 5.000 33,000.00 Rp 1,650.00
JUMLAH TENAGA KERJA Rp 34,650.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 44,000.00


E Overhead & Profit 10% x D 0.10 Rp 4,400.00
F Harga Satuan Pekerjaan (D+E) Rp 48,400.00

BH Pek. Pas. MCB Rp 400,763.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah % 100.000 182,165.00 Rp 182,165.00
JUMLAH TENAGA KERJA Rp 182,165.00
B BAHAN
Pipa Listrik Btg 3.000 24,500.00 Rp 73,500.00
Kabel m 15.000 14,500.00 Rp 2,175.00
Tee Doos Bh 1.000 8,000.00 Rp 8,000.00
L bow Bh 2.000 1,500.00 Rp 30.00
Klem Biasa Bh 24.000 4,000.00 Rp 96,000.00
Box MCB Bh 1.000 96,000.00 Rp 960.00
MCB Bh 2.000 75,000.00 Rp 1,500.00
JUMLAH TENAGA KERJA Rp 182,165.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 364,330.00


E Overhead & Profit 10% x D 0.10 Rp 36,433.00
F Harga Satuan Pekerjaan (D+E) Rp 400,763.00

BH Pek. 1 Buah Titik Lampu Rp 473,616.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah % 100.000 215,280.00 Rp 215,280.00
JUMLAH TENAGA KERJA Rp 215,280.00
B BAHAN
Pipa Listrik Btg 3.000 24,500.00 Rp 73,500.00
Kabel m 24.000 14,500.00 Rp 3,480.00
Tee Doos Bh 3.000 8,000.00 Rp 24,000.00
L bow Bh 4.000 1,500.00 Rp 60.00
Las Doop Bh 3.000 6,000.00 Rp 18,000.00
Klem Biasa Bh 24.000 4,000.00 Rp 96,000.00
Mangkok Bh 1.000 1,000.00 Rp 10.00
Saklar Bh 1.000 23,000.00 Rp 230.00
Fitting Bh 1.000 25,000.00 Rp 250.00
JUMLAH TENAGA KERJA Rp 215,280.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 430,560.00


E Overhead & Profit 10% x D 0.10 Rp 43,056.00
F Harga Satuan Pekerjaan (D+E) Rp 473,616.00

Dinding bata merah cm tebal 1/2 Batu Campuran 1SP : 2PP 172,337.00

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 1,350.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH HARGA TENAGA KERJA 43,650.00
B BAHAN
Bata Merah Buah 70.000 1,100.00 77,000.00
Semen Portland Kg 18.950 1,600.00 30,320.00
Pasir Pasang (PP) M3 0.038 150,000.00 5,700.00
JUMLAH HARGA BAHAN 113,020.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 156,670.00


E Overhead & Profit 10% x D 10% 15,667.00
F Harga Satuan Pekerjaan (D+E) 172,337.00

M1 Pek Pasangan Saluran Air Terbuka Uk. 30x30 cm' Rp 156,906.16


Pek. Galian Tanah Biasa 0.120 Rp 81,675.00 Rp 9,801.00
Pek. Pasangan Batu Bata 1pc : 2ps 0.600 Rp 172,337.00 Rp 103,402.20
Pek. Plesteran 1pc : 2ps 0.600 Rp 72,838.26 Rp 43,702.96

M2 Pemasangan 1 m² Bingkai Jendela aluminium Rp 351,752.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 95,000.00 Rp 8,075.00
Tukang L.02 OH 0.085 120,000.00 Rp 10,200.00
Kepala Tukang L.03 OH 0.009 135,000.00 Rp 1,215.00
Mandor L.04 OH 0.005 120,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 20,090.00
B BAHAN
Alumunium frame Jendela 3" m 4.400 37,500.00 Rp 165,000.00
Profil Kaca bh 4.500 27,500.00 Rp 123,750.00
Sealant Tube 0.270 40,500.00 Rp 10,935.00
JUMLAH TENAGA KERJA Rp 299,685.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 319,775.00


E Overhead & Profit 10% x D 0.10 Rp 31,977.50
F Harga Satuan Pekerjaan (D+E) Rp 351,752.50

M2 Pek. Pas Kaca Polos 5 mm' Rp 171,128.10


A.4. Pemasangan 1 m kaca tebal 5 mm
2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 95,000.00 Rp 1,425.00
Tukang kayu L.02 OH 0.150 120,000.00 Rp 18,000.00
Kepala Tukang L.03 OH 0.015 135,000.00 Rp 2,025.00
Mandor L.04 OH 0.001 120,000.00 Rp 96.00
JUMLAH TENAGA KERJA Rp 21,546.00
B BAHAN
Kaca Bening 5 mm m2 1.100 120,000.00 Rp 132,000.00
Sealent Tube 0.050 40,500.00 Rp 2,025.00
JUMLAH TENAGA KERJA Rp 134,025.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 155,571.00


E Overhead & Profit 10% x D 0.10 Rp 15,557.10
F Harga Satuan Pekerjaan (D+E) Rp 171,128.10

BH Pas. Engsel Jendela Rp 40,200.60


A.4. Pemasangan 1 buah engsel pintu

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 95,000.00 Rp 1,425.00
Tukang kayu L.02 OH 0.150 120,000.00 Rp 18,000.00
Kepala Tukang L.03 OH 0.015 135,000.00 Rp 2,025.00
Mandor L.04 OH 0.001 120,000.00 Rp 96.00
JUMLAH TENAGA KERJA Rp 21,546.00
B BAHAN
Engsel Jendela Bh 2.000 7,500.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 15,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 36,546.00


E Overhead & Profit 10% x D 0.10 Rp 3,654.60
F Harga Satuan Pekerjaan (D+E) Rp 40,200.60

Set Bingkai Jendela Alluminium Rp 560,307.32


Pemasangan 1 m² Bingkai Jendela aluminium 0.870 Rp 351,752.50 Rp 306,024.68
Pek. Pas Kaca Polos 5 mm' 0.870 Rp 171,128.10 Rp 148,881.45
Pas. Engsel Jendela 2.000 Rp 40,200.60 Rp 80,401.20
Kuncian 1.000 Rp 15,000.00 Rp 15,000.00
Hak Angin 2.000 Rp 5,000.00 Rp 10,000.00

M2 Pengecatan Dengan Cat Tembok Rp 26,083.75


A.4. Pengecatan 1m2 tembok/plafon (mowilex/setara)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 95,000.00 Rp 4,750.00
Tukang Cat L.02 OH 0.075 120,000.00 Rp 9,000.00
Kepala Tukang L.03 OH 0.008 135,000.00 Rp 1,012.50
Mandor L.04 OH 0.003 120,000.00 Rp 300.00
JUMLAH TENAGA KERJA Rp 15,062.50
B BAHAN
Cat Tembok Mutu menengah Kg 0.300 25,000.00 Rp 7,500.00
Plamir Tembok Kg 0.100 8,500.00 Rp 850.00
Amplas Lbr 0.100 3,000.00 Rp 300.00
JUMLAH TENAGA KERJA Rp 8,650.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 23,712.50


E Overhead & Profit 10% x D 0.10 Rp 2,371.25
F Harga Satuan Pekerjaan (D+E) Rp 26,083.75

bh Pas. Kunci Tanam Pintu KM/WC Rp 206,343.50


A.4. Pemasangan 1 buah kunci kamar mandi

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 95,000.00 Rp 475.00
Tukang kayu L.02 OH 0.500 120,000.00 Rp 60,000.00
Kepala Tukang L.03 OH 0.050 135,000.00 Rp 6,750.00
Mandor L.04 OH 0.003 120,000.00 Rp 360.00
JUMLAH TENAGA KERJA Rp 67,585.00
B BAHAN
Kunci Tanam 1 x eks Yale Bh 1.000 120,000.00 Rp 120,000.00
JUMLAH TENAGA KERJA Rp 120,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 187,585.00


E Overhead & Profit 10% x D 0.10 Rp 18,758.50
F Harga Satuan Pekerjaan (D+E) Rp 206,343.50

M2 Pemasangan 1 m² Bingkai Pintu aluminium Rp 533,252.50

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 95,000.00 Rp 8,075.00
Tukang L.02 OH 0.085 120,000.00 Rp 10,200.00
Kepala Tukang L.03 OH 0.009 135,000.00 Rp 1,215.00
Mandor L.04 OH 0.005 120,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 20,090.00
B BAHAN
Alumunium ambang pintu m 4.400 75,000.00 Rp 330,000.00
Profil Kaca bh 4.500 27,500.00 Rp 123,750.00
Sealant Tube 0.270 40,500.00 Rp 10,935.00
JUMLAH TENAGA KERJA Rp 464,685.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 484,775.00


E Overhead & Profit 10% x D 0.10 Rp 48,477.50
F Harga Satuan Pekerjaan (D+E) Rp 533,252.50

Set Pek. Pintu Kamar Mandi Rp 1,623,722.25


Pemasangan 1 m² Bingkai Pintu aluminium 1.500 Rp 533,252.50 Rp 799,878.75
Spandrell Alluminium 1.500 175,000.00 Rp 262,500.00
Pas. Kunci Tanam Pintu KM/WC 1.000 Rp 206,343.50 Rp 206,343.50
Pas. Engsel Pintu 3.000 Rp 35,000.00 Rp 105,000.00
Perakitan 1.000 Rp 250,000.00 Rp 250,000.00

M1 Pek. Lisplank Kalsiboard 2 x 20 Motif Urat Rp 90,530.00


Pemasangan 1 m' Lisplank Wood Plank

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 95,000.00 Rp 14,250.00
Tukang kayu L.02 OH 0.300 120,000.00 Rp 36,000.00
Kepala Tukang L.03 OH 0.020 135,000.00 Rp 2,700.00
Mandor L.04 OH 0.005 120,000.00 Rp 600.00
JUMLAH TENAGA KERJA Rp 53,550.00
B BAHAN
List Plank Calciboard 20 cm urat m' 2.000 14,375.00 Rp 28,750.00
JUMLAH BAHAN Rp 28,750.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 82,300.00


E Overhead & Profit 10% x D 0.10 Rp 8,230.00
F Harga Satuan Pekerjaan (D+E) Rp 90,530.00

Pemasangan paving block tebal 8 cm 196,851.60

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.050 135,000.00 6,750.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH HARGA TENAGA KERJA 90,656.00
B BAHAN
Paving block 8 cm buah 1.010 80,000.00 80,800.00
Pasir Pasang (PP) m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 88,300.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 178,956.00


E Overhead & Profit 10% x D 10% 17,895.60
F Harga Satuan Pekerjaan (D+E) 196,851.60

Pemasangan Grass block 213,516.60

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang Batu L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.050 135,000.00 6,750.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH HARGA TENAGA KERJA 90,656.00
B BAHAN
Grass Block buah 1.010 95,000.00 95,950.00
Pasir Pasang (PP) m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 103,450.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 194,106.00


E Overhead & Profit 10% x D 10% 19,410.60
F Harga Satuan Pekerjaan (D+E) 213,516.60

BH Pek. Pas. Closet duduk lengkap Rp 5,176,655.0000


A.5. Pemasangan 1 buah closet duduk/ monoblock'

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 95,000.00 Rp 313,500.00
Tukang L.02 OH 1.100 120,000.00 Rp 132,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 Rp 1,350.00
Mandor L.04 OH 0.1600 120,000.00 Rp 19,200.00
JUMLAH TENAGA KERJA Rp 466,050.00
B BAHAN
Kloset Duduk Ex. Toto Unit 1.000 4,000,000.00 Rp 4,000,000.00
Perlengkapan Ls 0.060 4,000,000.00 Rp 240,000.00
JUMLAH TENAGA KERJA Rp 4,240,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 4,706,050.00


E Overhead & Profit 10% x D 10% Rp 470,605.00
F Harga Satuan Pekerjaan (D+E) Rp 5,176,655.00

BH Pek. Pas. Kloset Jongkok Biasa Rp 1,095,655.0000


A.5. Pemasangan 1 buah closet Jongkok

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 95,000.00 Rp 313,500.00
Tukang L.02 OH 1.100 120,000.00 Rp 132,000.00
Kepala Tukang L.03 OH 0.010 135,000.00 Rp 1,350.00
Mandor L.04 OH 0.1600 120,000.00 Rp 19,200.00
JUMLAH TENAGA KERJA Rp 466,050.00
B BAHAN
Kloset Duduk Biasa Unit 1.000 500,000.00 Rp 500,000.00
Perlengkapan Ls 0.060 500,000.00 Rp 30,000.00
JUMLAH TENAGA KERJA Rp 530,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 996,050.00


E Overhead & Profit 10% x D 10% Rp 99,605.00
F Harga Satuan Pekerjaan (D+E) Rp 1,095,655.00

BH Pek. Pas. Pintu Kaca Temper Lebar 1,8m Rp 12,638,450.0000

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.600 95,000.00 Rp 627,000.00
Tukang L.02 OH 2.200 120,000.00 Rp 264,000.00
Kepala Tukang L.03 OH 1.100 135,000.00 Rp 148,500.00
JUMLAH TENAGA KERJA Rp 1,039,500.00
B BAHAN
Pintu Kaca Temper Deckson l=18cm Unit 1.000 9,500,000.00 Rp 9,500,000.00
Perlengkapan Ls 0.100 9,500,000.00 Rp 950,000.00
JUMLAH TENAGA KERJA Rp 10,450,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 11,489,500.00


E Overhead & Profit 10% x D 10% Rp 1,148,950.00
F Harga Satuan Pekerjaan (D+E) Rp 12,638,450.00

BH Pek. Pas. Washtafel Rp1,099,870.20


A.5. Pemasangan 1 buah wastafel

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 95,000.00 Rp 114,000.00
Tukang L.02 OH 1.450 120,000.00 Rp 174,000.00
Kepala Tukang L.03 OH 0.150 135,000.00 Rp 20,250.00
Mandor L.04 OH 0.060 120,000.00 Rp 7,200.00
JUMLAH TENAGA KERJA Rp 315,450.00
B BAHAN
Wastafel Unit 1.200 500,000.00 Rp 600,000.00
Semen portland Kg 6.000 1,600.00 Rp 9,600.00
Pasir pasang (PP) m3 0.010 150,000.00 Rp 1,500.00
Perlengkapan % 12% 611,100.00 Rp 73,332.00
JUMLAH TENAGA KERJA Rp 684,432.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 999,882.00


E Overhead & Profit 10% x D 10% Rp 99,988.20
F Harga Satuan Pekerjaan (D+E) Rp 1,099,870.20

M2 Pekerjaan Furnitur Multipleks Tebal 60 cm Tinggi 210 cm 1,241,605.05

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang L.02 OH 0.500 120,000.00 60,000.00
Kepala Tukang L.03 OH 0.500 135,000.00 67,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH HARGA TENAGA KERJA 157,250.00
B BAHAN
Tripleks 9 mm Lembar 7.740 125,000.00 967,481.86
Paku Cacing Kg 0.200 20,000.00 4,000.00
Paku Tembak Kg 0.100 20,000.00 2,000.00
JUMLAH HARGA BAHAN 971,481.86
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,128,731.86


E Overhead & Profit 10% x D 10% 112,873.19
F Harga Satuan Pekerjaan (D+E) 1,241,605.05

M2 Pemasangan 1 m2 HPL

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 95,000.00 11,875.00
Tukang L.04 OH 0.250 120,000.00 30,000.00
Kepala tukang L.01 OH 0.250 135,000.00 33,750.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH HARGA TENAGA KERJA 78,625.00
B BAHAN
HPL Taco m2 1.200 100,779.36 120,935.23
Lem Kayu Kg 0.200 25,000.00 5,000.00
JUMLAH HARGA BAHAN 125,935.23
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 204,560.23


E Overhead & Profit 10% x D 10% 20,456.02
F Harga Satuan Pekerjaan (D+E) 225,016.26

M2 Furniture Tinggi 2,1m tebal 60 cm Finishing HPL 3,336,007.89

Nama Pekerjaan sat. Koef Harga satuan Jumlah harga


Rangka Multipleks t= 210cm m 1 1,241,605.05 1,241,605.05
Finishing HPL m2 7.96 225,016.26 1,791,129.40
Accessories % 10% 3,032,734.44 303,273.44
3,336,007.89
PEKERJAAN POER
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Galian 1.20 1.10 1.5 25.00 49.50
total Volume galian : 49.50
Volume Galian Volume Poer Volume
Item pekerjaan
m3 m3 m3
Timbunan kembali 49.50 6.25 43.25
total Volume Urugan kembali : 43.25
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 1.00 1.00 0.25 25.00 6.25
total Volume Beton K-250 : 6.25
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Lantai Kerja 1.00 1.00 0.07 25.00 1.75
total Volume Rabat Beton : 1.75
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Urugan Pasir 1.00 1.00 0.07 25.00 1.75
total Volume Rabat Beton : 1.75
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 1.00 0.25 4 25.00 25.00
1.00total Volume Bekisting Poer : 25.00
Pemakaian 2x : 12.50
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit m3
Tulangan D.14 2.50 1.21 18 25.00 1359.38
total Volume Pembesian Poer : 1359.38
PEKERJAAN KOLOM PEDESTAL
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 0.25 0.25 1 25.00 1.56
total Volume Beton K-250 : 1.56
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 0.25 1 4 25.00 25.00
total Volume Bekisting : 25.00
Pemakaian 2x : 12.50
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit m3
Tulangan D.14 1.00 1.21 8 25.00 241.67
Beugel Ø.10 1.00 0.62 10 25.00 154.13
total Volume Pembesian Poer : 395.79
PEKERJAAN KOLOM K1
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 0.35 0.35 3.5 25.00 10.72
total Volume Beton K-250 : 10.72
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 0.35 3.5 4 25.00 122.50
total Volume Bekisting : 122.50
Pemakaian 2x : 61.25
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit m3
Tulangan D.12 3.50 0.89 4 25.00 310.72
Beugel Ø.8 1.40 0.39 23 25.00 317.62
total Volume Pembesian Poer : 628.34
PEKERJAAN KOLOM PRAKTIS (KP)
Panjang Jumlah Panjag
Item pekerjaan
m unit m
Kolom Praktis 4 16 64.00
Panjang total : 64.00
BALOK LATAI
Panjang Jumlah Panjag
Item pekerjaan
m unit m
Balok Latai 36 1 36.00
Panjang total : 36.00

PEKERJAAN SLOOF S1
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 292.00 0.15 0.3 1.00 13.14
total Volume Beton K-250 : 13.14
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 152.50 0.3 2 1.00 91.50
total Volume Bekisting : 91.50
Pemakaian 2x : 45.75
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit m3
Tulangan Ø.12 152.50 0.89 6 1.00 812.30
Beugel Ø.8 0.90 0.39 1017 1.00 361.02
total Volume Pembesian: 1173.32

PEKERJAAN BALOK B1 / RINGBALK


Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 152.50 0.15 0.2 1.00 4.58
total Volume Beton K-250 : 4.58
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 152.50 0.2 2 1.00 61.00
total Volume Bekisting : 61.00
Pemakaian 2x : 30.50
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit m3
Tulangan Ø.12 152.50 0.89 4 1.00 541.53
Beugel Ø.8 0.70 0.39 1017 1.00 280.80
total Volume Pembesian Poer : 822.33

PEKERJAAN DINDING BETON


Panjang Tinggi Tebal Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 4.00 4.00 0.12 1.00 1.92
total Volume Beton K-250 : 1.92
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 4.00 4.00 2 1.00 32.00
total Volume Bekisting : 32.00
Pemakaian 2x : 16.00
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit kg
Tulangan Ø.10 4.00 0.62 ### 2.00 131.56
Tulangan Ø.10 4.00 0.62 27 2.00 131.56
total Volume Pembesian Poer : 263.11
PEKERJAAN PLAT KANOPI BETON
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Beton K-250 4.00 0.50 0.12 1.00 0.24
Beton K-250 4.00 0.50 0.12 1.00 0.24
Beton K-250 4.00 0.50 0.12 1.00 0.24
total Volume Beton K-250 : 0.72
Panjang Tinggi Jumlah sisi Jumlah Volume
Item pekerjaan
m m Unit Unit m3
Bekisting 5.00 0.12 1 1.00 0.60
Bekisting 4.00 0.50 1 1.00 2.00
Bekisting 5.00 0.12 1 1.00 0.60
Bekisting 4.00 0.50 1 1.00 2.00
Bekisting 5.00 0.12 1 1.00 0.60
Bekisting 4.00 0.50 1 1.00 2.00
total Volume Bekisting : 7.80
Pemakaian 2x : 3.90
Panjang Koef. jumlah besi Jumlah Volume
Item pekerjaan
m kg/m Unit Unit kg
Tulangan Ø.10 4.00 0.62 ### 2.00 16.44
Tulangan Ø.10 0.50 0.62 27 2.00 16.44
Tulangan Ø.10 4.00 0.62 ### 2.00 16.44
Tulangan Ø.10 0.50 0.62 27 2.00 16.44
Tulangan Ø.10 4.00 0.62 ### 2.00 16.44
Tulangan Ø.10 0.50 0.62 27 2.00 16.44
total Volume Pembesian Poer : 98.67

PEKERJAAN PONDASI GARIS


Panjang Jumlah Volume
Item pekerjaan
m Unit m3
Pondasi Type P1 106.50 1 106.50
total Panjang P1 106.500

Pondasi Type P2 46.00 1 46.00


total Panjang P2 46.000
total Panjang Sloof 152.500
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Galian P1 106.50 0.7 0.4 1 29.82
Galian P2 46.00 0.6 0.4 1 11.04
Total Volume Galian Pondasi garis : 40.86
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Urugan Tanah Kembali P1 106.50 0.3 0.4 1.00 12.780
Urugan Tanah Kembali P2 46.00 0.3 0.4 1.00 5.520
Total Volume urugan tanah kembali : 12.780
Panjang Lebar Tinggi Jumlah Volume
Item pekerjaan
m m m Unit m3
Pasangan Batu Kosong P1 106.50 0.8 0.2 1.00 17.04
Pasangan Batu Kosong P2 46.00 0.7 0.2 1.00 6.44
Total Volume Pas. Batu Kosong: 23.48
Panjang Atas Bawah Tinggi Volume
Item pekerjaan
m m m m m3
Pondasi Batu Kali P1 106.50 0.3 0.6 0.70 33.55
Pondasi Batu Kali P2 46.00 0.3 0.5 0.60 11.04
Total Volume Pondasi Batu Kali: 44.59
Panjang Atas Bawah Tinggi Volume
Item pekerjaan
m m m m m3
Urugan Pasir P1 106.50 0.7 0.7 0.05 3.73
Urugan Pasir P2 46.00 0.6 0.6 0.05 1.38
Total Volume Lantai Kerja: 5.11
Panjang Atas Bawah Tinggi Volume
Item pekerjaan
m m m m m3
Lantai Kerja P1 106.50 0.7 0.7 0.07 5.22
Lantai Kerja P2 46.00 0.6 0.6 0.07 1.93
Total Volume Lantai Kerja: 7.15

PEKERJAAN LANTAI
Luas Jumlah Luas
Item pekerjaan
m2 m2
Banngunan utama 299.25 1 299.25
Teras 16.00 1 16.00
Luas total : 315.25
Luas Tebal Luas
Item pekerjaan
m2 m m3
Timbunan Tanah Bawah Lantai 315.25 1.5 472.88
Urugan Pasir BawahLantai 315.25 0.05 15.76
Rabat Beton Lantai 315.25 0.07 22.07

Panjang Lebar Jumlah Luas


Item pekerjaan
m m Unit m2
Keramik 20x20 Toilet 1 5.00 2.00 1 10.00
Kermik 20x20 toilet sel 2.00 1.50 3 9.00
Keramik 20x20 Toilet 2 2.50 2.00 1 5.00
Kermik 20x20 toilet kapolsek 2.50 1.50 1 3.75
Luas total keramik 25x25 : 27.75
Luas total Luas kamar mandi Luas
Item pekerjaan
m2 m2 m2
Keramik 40X40 299.25 27.75 271.50
Teras Depan 40 x 40 16.00 0.00 16.00
Teras Belakang 40 x 40 6.00 0.00 6.00
Luas total keramik 40x40 : 293.50

PEKERJAAN ATAP
Lebar Atas Lebar bawah Miring Jumlah sisi Luas
Item pekerjaan
m m m unit m2
Depan / Belakang 0.00 17.00 9 2 153.00
0.00
0.00
Kiri / Kanan 3.50 20.00 9 2 211.50
0.00

Luas total : 364.50


Panjang Jumlah Luas
Item pekerjaan
m Unit m2
Nok Atap 11.00 3 33.00
Nok Atap 9.00 3 27.00
Nok Atap 4.00 1 4.00
Nok Atap 6.00 4 24.00
Nok Atap 9.00 1 9.00

total : 97.00
Panjang Jumlah Luas
Item pekerjaan
m Unit m2
List Plank 22.00 2 44.00
List Plank 20.00 2 40.00
Listplank 5 2 10.00

Luas total : 94.00


PEKERJAAN DINDING
Panjang Tinggi Jumlah sisi Luas
Item pekerjaan
m m unit m2
Pasangan 1/2 Bangunan 152.50 3.70 1 564.25
Luas total : 564.25
Panjang Tinggi Jumlah sisi Luas
Item pekerjaan
m m unit m2
Dinding Beton 4.00 4.00 1 16.00
Dinding Beton 16.00
Panjang Tinggi Jumlah sisi Luas
Item pekerjaan
m m unit m2
P1 1.50 2.50 4 15.00
P2 0.90 2.50 7 15.75
P3 0.75 2.10 4 6.30
P4 3.00 2.00 1 6.00
P5 2.00 2.00 2 8.00
P6 1.00 2.00 2 4.00
J1 1.20 1.60 21 40.32
V1 0.60 0.60 1 0.36
Luas Bukaan 95.73
Pekerjaan Tembok 1/2 Bata : 452.52
Pekerjaan Plasteran : 905.04
Panjang Tinggi Jumlah sisi Luas
Item pekerjaan
m m unit m2
Toilet 1 11.50 1.60 1 18.40
Toilet 2 6.00 1.60 1 9.60
Toilet Kapolsek 7.00 1.60 1 11.20
Toilet Sel 5.00 1.60 3 24.00
Pekerjaan Keramik Dinding : 63.20
Pekerjaan Acian : 841.84
Pengecatan Dinding Tembok : 841.84
PEKERJAAN PARTISI
Panjang Tinggi Jumlah sisi Luas
Item pekerjaan
m m unit m2
partisi 1.80 1.25 3 6.75
0.70 1.25 4 3.50
Luas total : 10.25

PEKERJAAN PLAFON
Panjang Lebar Jumlah sisi Luas
Item pekerjaan
m m unit m2
Plafon Kalsibaord teras 4.00 4.00 1 16.00
Plafon Kalsiboard Toilet 1 5.00 2.00 1 10.00
Plafon Kalsiboard Toilet 2 2.50 2.00 1 5.00
Plafon Kalsiboard Toilet kapols 2.50 1.50 1 3.75
Plafon Kalsiboard Toilet sel 1.50 2.00 3 9.00
Plafon keliling 94.00 0.80 1 75.20
Luas total : 118.95
Luas Bangunan 20.00 12.00 1 240.00
Total Plafon Kalsiboard Toilet 27.75
Ruang Terbuka 4.00 6.00 1 24.00
Luas Gypsum : 188.25
DAFTAR HARGA SATUAN UPAH DAN BAHAN

A. DAFTAR HARGA SATUAN UPAH


NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Pemecah Batu OH Rp 80,000.00


2 Pekerja OH Rp 95,000.00
3 Tukang Batu OH Rp 120,000.00
4 Kepala Tukang OH Rp 135,000.00
5 Tukang Kayu OH Rp 120,000.00
6 Kepala Tukang Kayu OH Rp 150,000.00
7 Tukang Besi OH Rp 120,000.00
8 Kepala Tukang Besi OH Rp 135,000.00
9 Tukang Las OH Rp 120,000.00
10 Kepala Tukang Las OH Rp 135,000.00
11 Tukang Cat OH Rp 120,000.00
12 Kepala Tukang Cat OH Rp 135,000.00
13 Tukang Politur OH Rp 120,000.00
14 Kepala Tukang Politur OH Rp 135,000.00
15 Tukang OH Rp 120,000.00
16 Mandor OH Rp 120,000.00 2.00

B. DAFTAR HARGA SATUAN BAHAN

1. Bahan Pasangan dan Tanah

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Batu belah M3 Rp 200,000.00


2 Bata Merah Buah Rp 1,100.00
3 Batako Buah Rp 4,200.00
4 Paving block type bata tebal 8 cm pres mesin Bh Rp 3,000.00
5 Batu Paras M2 Rp 85,000.00
6 Batu Tempel Hitam M2 Rp 125,000.00
7 Batu Pecah 1/2 cm M3 Rp 270,000.00
8 Batu Pecah 2/3 cm M3 Rp 270,000.00
9 Batu Pecah 3/5 cm M3 Rp 270,000.00
10 Batu Pecah 5/7 cm M3 Rp 270,000.00
11 Kapur M3 Rp 100,000.00
12 Kerikil alam (KR) M3 Rp 409,500.00
13 Kerikil M3 Rp 409,500.00
13 Kerikil (Maks 30 mm) M3 Rp 303.33
14 Pasir Beton M3 Rp 200,000.00
14 Pasir Beton (PB) M3 Rp 142.86
15 Pasir Pasang (PP) M3 Rp 150,000.00
16 Pasir Urug M3 Rp 100,000.00
17 Semen Portland Kg Rp 1,600.00 Harga Per-Kg
18 Semen Warna Kg Rp 15,000.00 (1 zak = 50 Kg)
19 Sirtu M3 Rp 130,000.00
20 Tanah Urug M3 Rp 41,875.00
21 Rooster Bh Rp 3,000.00
22 Tanah Liat M3 Rp 50,000.00
23 Air Liter Rp 25.00
2. Bahan Atap

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Sirap Kalimantan Buah Rp 1,500.00


2 Asbes Gelombang 92 x 180 Lembar Rp 35,000.00
3 Asbes Gelombang 105 x 240 Lembar Rp 120,000.00
4 Atap Cahayadeck m2 Rp 61,800.00
5 Atap Spandek T. 0.4 mm m2 Rp 80,000.00
6 Atap Soka Lembar Rp 65,000.00
6 Bubungan Atap Spandek m' Rp 85,714.29
7 Atap Polycarbonate m2 Rp 70,000.00
8 Bubungan Asbes Gelombang 92 cm Lembar Rp 28,250.00
9 Bubungan Asbes Gelombang 105 cm Lembar Rp 35,000.00
10 Bubungan Atap Cahayadeck m' Rp 45,000.00
11 Bubungan Genteng Beton Buah Rp 5,350.00
12 Bubungan Genteng Keramik Buah Rp 16,900.00
13 Bubungan Genteng Kodok Buah Rp 1,800.00
14 Bubungan Genteng Lokal Buah Rp 1,860.00
15 Bubungan Genteng Pejaten Buah Rp 2,700.00
16 Bubungan Karang Pilang Buah Rp 11,500.00
17 Bubungan Genteng Metal Lembar Rp 75,000.00
17 Genteng Kaca Buah Rp 10,100.00
18 Genteng Karang Pilang Buah Rp 7,500.00
19 Genteng Keramik Buah Rp 8,450.00
20 Genteng Pejaten Buah Rp 1,500.00
21 Genteng Beton Buah Rp 4,500.00
22 Genteng Kodok Buah Rp 1,500.00
23 Genteng Lokal Buah Rp 1,000.00
24 Genteng Metal Lembar Rp 76,000.00
25 Ijuk Kg Rp 15,000.00
26 Seng Gelombang BJLS 20 Lembar Rp 42,500.00
27 Seng Gelombang BJLS 25 Lembar Rp 48,000.00
28 Seng Gelombang BJLS 30 Lembar Rp 75,000.00
29 Seng Plat BJLS 20 Lembar Rp 44,000.00
30 Seng Plat BJLS 25 Lembar Rp 53,000.00
31 Seng Plat BJLS 28 Lembar Rp 53,000.00
32 Seng Plat BJLS 30 Lembar Rp 55,750.00
33 Multi Roof Colour 2x5 Rp 92,500.00
34 Fancy Batuna 2 Susun Rp 85,500.00
35 Fancy Polasco 2 Susun Rp 71,500.00
36 Surya Stone 2x4 Rp 74,200.00
1x4 Rp 41,000.00
Surya Roof/Color 2x4 Rp 53,500.00
Sakura Garuda 2x4 Rp 30,000.00
Sakura Elang (Tebal 0,30 mm) 2x4 Rp 51,500.00
1x4 Rp 22,500.00
Sakura Merpati(Tebal 0,25 mm) 2x4 Rp 37,000.00
1x4 Rp 22,500.00
Sakura Jazz Kenari Extra(Tebal 0,28 mm) 2x4 Rp 38,000.00
Sakura Merpati Royal Jazz Rp 37,000.00
Soka Jempol Ceria (2 Susun) 2 susun Rp 44,500.00
Nok Raja Multi Color 3 Ruas 1m Rp 60,500.00
Nok Raja Sakura Color 3 Ruas Rp 39,500.00
Tutup Nok Raja Multi Rp 26,500.00
Nok Sakura 4 Ruas 80 cm Rp 39,500.00
Tutup Nok Ratu Sakura Rp 17,000.00
3. Bahan Kayu

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Bambu >= Dia 10 cm - 6 m Batang Rp 25,000.00


2 Bambu >= Dia 7 cm - 6 m Batang Rp 20,000.00
3 Bambu >= Dia 12,5 cm – 6 m Batang Rp 30,000.00
4 Dolken kayu Ø (8 -10) cm, Panjang 4 m Batang Rp 25,000.00
5 Kayu Kelas I Lokal (simponi) M3 Rp 8,500,000.00
6 Kayu Kelas II M3 Rp 1,937,500.00
7 Kayu Kelas III M3 Rp 1,500,000.00
8 Kayu Papan Begesting M3 Rp 2,000,000.00
9 Papan Kayu Kelas I Lokal (Simponi) M3 Rp 3,250,000.00
10 Papan Kayu Kelas II M3 Rp 2,500,000.00
11 Papan Kayu Kelas III M3 Rp 1,750,000.00
12 Parquet M2 Rp 650,000.00
13 Formite/penjaga jarak bekisting/spacer BH Rp 5,000.00
14 Bilik bambu M2 Rp 25,000.00
15 List kayu 2/4 M3 Rp 2,500,000.00

4. Bahan Lantai

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Granit 60/60 Buah Rp 65,000.00


2 Granit 30/60 Buah Rp 31,500.00
5 Keramik 40 x 40 cm Doos Rp 90,000.00
5 Keramik 20 x 40 cm Doos Rp 85,000.00
5 Keramik 60 x 60 cm Doos Rp 175,000.00
3 Ubin Keramik 40/40 Buah Rp 12,000.00
4 Ubin Keramik 20/40 Buah Rp 8,500.00
5 Ubin Keramik 30/30 Buah Rp 7,500.00
5 Keramik 30 x 30 cm Buah Rp 82,500.00
6 Ubin Keramik 20/20 Buah Rp 5,500.00
7 Keramik 20/25 Buah Rp 6,250.00
8 Hospital Granit Plin Buah Rp 35,000.00

5. Bahan Besi

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Besi Beton Kg Rp 15,000.00


2 Besi Beton Ulir Kg Rp 15,500.00
3 Besi Black steel (S40) Kg Rp 10,200.00
4 Kusen Aluminium 4" m Rp 150,000.00
4 Kusen Aluminium 4" warna coklat m Rp 150,000.00
5 Profil Alluminium m Rp 15,000.00
6 Kawat Beton Kg Rp 25,000.00
7 Besi strip tebal 5 mm Kg Rp 12,500.00
8 Sunscreen alluminium M2 Rp 175,000.00
9 Rolling door alluminium M2 Rp 600,000.00
10 Alumunium strip M Rp 15,000.00
11 Hollow 4 x 4 cm Btng Rp 120,000.00
12 Hollow 2 x 4 cm Btng Rp 100,000.00
13 Rangka Pintu/Jendela 3.5 x 8 cm warna coklat M Rp 200,000.00
14 Profil kaca alluminium M Rp 25,000.00
15 Jaring Kawat Baja Dilas Kg Rp 14,000.00
16 Kawat Bronjong Kg Rp 25,000.00
17 Besi Siku L.40.40.3 Btg Rp 1,217,400,000.00
18 Bondek m2 Rp 140,000.00
18 Baja Ringan C.75 m Rp 20,000.00 Panjang 6m/btg
18 Hollow Galvalum 4x4cm m Rp 12,000.00 Panjang 6m/btg
18 Spandrell Alluminium m2 Rp 175,000.00
19 Besi Wire Mesh M.8 Uk 210X540 m2 Rp 66,137.57
6. Bahan Langit-langit

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Calsiboard 120 x 240 x 3,5 mm Lembar Rp 80,000.00


2 Calcibord 120 x 240 x 6 mm Lembar Rp 95,000.00
3 Gypsum board 9 mm Lembar Rp 80,000.00
4 Lem Kg Rp 25,000.00
5 Lem Kayu Kg Rp 25,000.00
6 Lem Vinyl Kg Rp 22,500.00
7 Teakwood tebal 4 mm Lembar Rp 70,000.00
8 Playwood Tebal 9mm Lembar Rp 120,000.00
9 Playwood Tebal 18mm Lembar Rp 216,000.00
10 Tripleks 6 mm Lembar Rp 75,000.00
10 Tripleks 9 mm Lembar Rp 125,000.00
11 Plafob Spanderell m2 Rp 175,000.00

7. Bahan Pipa

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Pipa PVC Dia. 1" M' Rp 10,000.00


2 Pipa PVC Dia. 1/2" Tipe AW M' Rp 5,625.00
3 Pipa PVC Dia. 3/4" Tipe AW M' Rp 7,187.50
4 Pipa PVC Dia. 1" Tipe AW M' Rp 9,375.00
5 Pipa PVC Dia. 1 ½" Tipe AW M' Rp 16,250.00
6 Pipa PVC Dia. 2" Tipe AW M' Rp 17,000.00
7 Pipa PVC Dia. 2 ½" Tipe AW M' Rp 29,687.50
8 Pipa PVC Dia. 3" Tipe AW M' Rp 43,750.00
9 Pipa PVC Dia. 4" Tipe AW M' Rp 87,500.00
10 Pipa PVC Dia. 4" M' Rp 105,000.00
11 Pipa PVC Dia. 6" M' Rp 220,000.00
12 Pipa GIP Dia. 1/2" M' Rp 23,333.33 SNI MED. A
13 Pipa GIP Dia. 1" M' Rp 45,000.00 SNI MED. A
14 Pipa GIP Dia. 1 1/2" M' Rp 65,000.00 SNI MED. A
15 Besi Beton Ø 8 SP Rp - SNI
16 Besi Beton Ø 10 M' Rp - SNI
17 Besi Siku 40.40.4 M' Rp -
8. Bahan Kaca

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Kaca Polos 3 mm M2 Rp 80,000.00


2 Kaca Polos 5 mm M2 Rp 120,000.00
3 Kaca Polos 10 mm M2 Rp 300,000.00
3 Kaca Raiben 3 mm M2 Rp 100,000.00
4 Kaca Raiben 5 mm M2 Rp 175,000.00
5 Kaca Raiben 10 mm M2 Rp 350,000.00
6 Kaca Temper 12 mm M2 Rp 1,200,000.00
9. Bahan Fhinising

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Amplas Lembar Rp 3,000.00


2 Cat Kayu Mutu Tinggi Kg Rp 70,000.00
3 Cat Kayu Mutu Menengah Kg Rp 30,000.00
4 Cat Tembok Mutu Tinggi Kg Rp 55,000.00
5 Cat Tembok Mutu Menengah Kg Rp 25,000.00
6 Cat Dasar Kayu Kg Rp 12,000.00
7 Cat Besi Kg Rp 79,000.00
8 Cat genteng Kg Rp 20,000.00
9 Kuas Bh. Rp 15,000.00
10 Meni Kayu Kg Rp 13,300.00
11 Meni Besi Kg Rp 16,200.00
12 Minyak Cat Liter Rp 10,000.00
13 Minyak Tanah (Karosene) Ltr Rp 8,000.00
14 Plamir Kayu Kg Rp 50,000.00
15 Plamir Tembok Kg Rp 8,500.00
16 Tepung Gypsum Kg Rp 10,000.00
17 Politur Liter Rp 62,500.00
18 Cat Waterproof Liter Rp 50,000.00
19 Roll cat Buah Rp 20,000.00
20 Kape Buah Rp 2,500.00
21 HPL m2 Rp 47,030.37
22 HPL Taco m2 Rp 100,779.36
22 Lem Kuning Kg Rp 60,000.00
23 Lem Putih bks Rp 17,000.00
24 Paku Tembak Dos Rp 32,500.00
25 Wood Filler Kg Rp 35,000.00
10. Bahan Sanitair

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Bak Cuci Stainless Steel Buah Rp 475,000.00


2 Bak Cuci Piring Teraso Buah Rp 250,000.00
3 Bak Fiberglass 0,30 M3 Buah Rp 750,000.00
4 Bak Fiberglass 1,00 M3 Buah Rp 1,750,000.00
5 Bak Mandi Plastik 0,50 M3 Buah Rp 385,000.00
6 Bak Mandi Porselin Buah Rp 300,000.00
7 Bak Mandi Teraso 50 x 50 x 50 Buah Rp 275,000.00
8 Kloset Duduk Ex. Toto Buah Rp 4,000,000.00
9 Kloset Duduk Biasa Buah Rp 1,500,000.00
9 Kloset Jongkok Porselin Buah Rp 300,000.00
10 Kloset Jongkok Teraso Buah Rp 150,000.00
11 Reservoir air rangka baja 1 M3 Buah Rp 4,500,000.00
12 Saringan Air Besi Buah Rp 50,000.00
13 Saringan Air Besi Stenliss Buah Rp 180,000.00
14 Saringan Air Plastik Buah Rp 12,500.00
15 Septicktank 1 M3 Buah Rp 3,500,000.00
16 Septicktank 2 M3 Buah Rp 5,000,000.00
17 Sumur pompa tangan terpasang Buah Rp 1,100,000.00
18 Urinoir Porselin Buah Rp 900,000.00
19 Wastafel Buah Rp 500,000.00
20 Kran Air Dia. 1/2" Buah Rp 20,000.00
21 Kran Air Dia. 3/4" Buah Rp 25,000.00
22 Floor Drain Buah Rp 40,000.00
23 Seal tape Buah Rp 10,000.00

11. Bahan Baja

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Besi Profil Kg Rp 13,500.00


2 Besi Baja IWF Kg Rp 13,500.00
3 Smartruss C.75.75 batang Rp 130,000.00 22,413.79
4 Smartruss C.75.65 batang Rp 68,000.00 11,724.14
5 Baja Plat Kg Rp 12,500.00
6 Pipa Baja Kg Rp 11,500.00
7 Kawat Las Kg Rp 18,000.00
12. Bahan Paku

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Besi Beugel/Baut (utk kuda-kuda) Buah Rp 22,500.00


2 Paku Kg Rp 20,000.00
3 Paku 1 cm - 2,5 cm Kg Rp 20,000.00
4 Paku 5 cm - 10 cm Kg Rp 20,000.00
5 Paku 5 cm - 7 cm Kg Rp 20,000.00
6 Paku 5 cm - 12 cm Kg Rp 20,000.00
7 Paku 10 cm Kg Rp 20,000.00
8 Paku 12 cm Kg Rp 20,000.00
9 Paku sekrup Kg Rp 25,000.00
10 Paku kait Buah Rp 1,500.00
11 Paku Seng Kg Rp 17,500.00
12 Paku Sumbat Buah Rp 1,150.00
13 Besi Angkur Buah Rp 8,500.00
14 Paku Tripleks Kg Rp 30,000.00
15 Skrup Buah Rp 250.00
16 Skrup Calsiboard Buah Rp 200.00
17 Skrup fixer Buah Rp 13,500.00

13. Bahan Penggantung

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Kunci Tanam 1 Slag Buah Rp 173,000.00


2 Kunci Tanam Double Slag Buah Rp 307,000.00
3 Kunci Tanam Kamar Mandi Buah Rp 25,000.00
4 Hak Angin Kecil Buah Rp 10,500.00
5 Hak Angin Besar Buah Rp 15,500.00
6 Grendel Kecil Buah Rp 13,500.00
7 Grendel Besar Buah Rp 17,500.00
8 Engsel Pintu 7" Buah Rp 30,000.00
9 Engsel Jendela Buah Rp 26,000.00
10 Grab Bar Buah Rp 543,000.00
11 Hand drail Buah Rp 235,000.00
12 Door Close ex. Gerber Set Rp 175,000.00
13 Hanging Floor Set Rp 125,000.00
13 Pintu Kaca Temper Deckson l=18cm Set Rp 9,500,000.00
14 hendle Pintu L=1000 mm stainlistel Set Rp 125,000.00
15 Full Handle L=30 ex. Bellezza Psg Rp 157,000.00

13. Bahan Listrik

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Lampu Reflektor 2 X 18 WATT Buah Rp 350,000.00


2 Down Light 7" Buah Rp 75,000.00
3 Lampu Ex Philips 18 watt Buah Rp 75,000.00
4 Kabel NYM 3X2.5mm m' Rp 14,500.00
1 Lampu RM 4x18 Watt Bh Rp 400,000.00
2 elbow Bh Rp 1,500.00
3 Mangkok Listrik Bh Rp 1,000.00
4 Pipa Listrik Btg Rp 24,500.00
5 Pipa Conduit m' Rp 4,150.00
6 Socket Pipa Buah Rp 3,000.00
7 Tee Doos Buah Rp 8,000.00
8 Klem Pipa Buah Rp 4,000.00
9 Fhiser Buah Rp 320.00
10 Las Doop Buah Rp 6,000.00
11 Isolasi Ban Buah Rp 2,500.00
12 Stop kontak ex. Phanasonic Buah Rp 20,000.00
13 Saklar phase daubel ex. Phanasonic Buah Rp 25,000.00
14 Saklar phase tunggal ex. Phanasonic Buah Rp 23,000.00
15 Pompa Air 268 bit Buah Rp 1,825,000.00
16 Lampu Taman Buah Rp 267,500.00
14. Bahan Tambahan

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

1 Axytilin Botol Rp 350,000.00


2 Bahan bakar bensin liter Rp 9,500.00
3 Bahan bakar solar liter Rp 10,500.00
4 Bentonite zak Rp 260,000.00
5 Flux Oil liter Rp 2,750.00
6 Kayu Bakar m3 Rp 145,000.00
7 Minyak Pelumas liter Rp 17,500.00
8 Minyak Begisting liter Rp 10,000.00
9 Olie merk Mesran liter Rp 32,000.00
10 Olie merk Penzoil liter Rp 35,000.00
11 Olie merk Top One liter Rp 37,500.00
12 Olie SAE 100 liter Rp 24,000.00
13 Olie SAE 30 liter Rp 15,000.00
14 Olie SAE 40 liter Rp 16,500.00
15 Olie SAE 90 liter Rp 22,500.00
16 Oli liter Rp 24,000.00
17 Mesin Las Jam Rp 35,000.00
18 Oxigen Botol Rp 175,000.00
19 Solar Liter Rp 10,500.00
20 Sambungan Rumah 1" set Rp 1,750,000.00
21 Sambungan Rumah 1/2" set Rp 900,000.00
22 Sambungan Rumah 2/4" set Rp 1,250,000.00
23 Wall Paper M2 Rp 125,000.00
24 Floor hardener Kg Rp 15,000.00
25 Ramset Buah Rp 12,500.00
26 Sealant Tube Rp 15,000.00
27 Mesin Gergaji Jam Rp 15,000.00
28 Mata Gergaji Buah Rp 55,000.00
29 Mesin Bor Besi Jam Rp 17,000.00
30 Mata Bor Buah Rp 11,000.00
31 Listrik Kwh Rp 500.00
32 Penggantung + Ramset Titik Rp 22,000.00
33 Residu liter Rp 25,000.00
34 Coumpound Kg Rp 1,500.00
RENCANA ANGGARAN BIAYA

PEKERJAAN PEMBANGUNAN KANTOR POLSEK TIKKE RAYA


LOKASI : KEC. PASANGKAYU

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA (Rp)
(Rp)
A PEKERJAAN PERSIAPAN
1 Pekerjaan Mobilisasi dan Demobilisasi Ls 1.00 1,200,000.00 1,200,000.00
4 Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00
Jumlah A 1,700,000.00
B PEKERJAAN TANAH DAN PONDASI
2 Pondasi Garis
- Penggalian 1 m3 Tanah Biasa Sedalam 1 M m3 40.86 81,675.00 3,337,240.50
- Pengurugan kembali galian tanah m3 12.78 58,850.00 752,103.00
- Pengurugan dengan pasir urug m3 #NAME? 164,670.00 #NAME?
- Lantai kerja beton mutu f’c = 7,4 Mpa m3 5.11 1,134,361.64 5,793,752.09
Pemasangan batu kosong (anstamping)
- m3 23.48 382,849.50 8,989,306.26
- Pemasangan pondasi batu belah campuran 1SP : 4PP m3 44.59 913,467.50 40,729,232.16
Pengurugan 1 m3 sirtu padat
3 m3 118.68 201,025.00 23,857,647.00
4 Rabat beton mutu f’c = 16,9 Mpa m3 - 1,308,153.26 -
Jumlah B #NAME?
C PEKERJAAN STRUKTUR BETON
1 Kolom (K1) Ukuran 25cm x 25cm
- Pemasangan bekisting untuk kolom m2 61.25 342,955.25 21,006,009.06
- Pembesian dengan besi polos atau besi ulir Kg 628.34 19,549.75 12,283,827.36
- Beton mutu f’c = 21,7 Mpa m3 10.72 1,361,014.02 14,588,369.07
2 Sloof (S1)
- Pemasangan bekisting untuk sloof m2 45.75 190,278.00 8,705,218.50
- Pembesian dengan besi polos atau besi ulir Kg 1,173.32 19,549.75 22,938,167.41
- Beton mutu f’c = 21,7 Mpa m3 13.14 1,361,014.02 17,883,724.27
3 Balok (B1)
- Pemasangan bekisting untuk Balok m2 30.50 349,349.00 10,655,144.50
- Pembesian dengan besi polos atau besi ulir Kg 822.33 19,549.75 16,076,322.46
- Beton mutu f’c = 21,7 Mpa m3 4.58 1,361,014.02 6,226,639.16
4 kolom praktis beton bertulang (11 x 11) cm m 64.00 108,268.05 6,929,155.20

Jumlah C 137,292,576.98
D PEKERJAAN ARSITEKTUR

1 Pekerjaan lantai
- Pemasangan lantai keramik 40x40 Polished m2 271.50 275,456.50 74,786,439.75
- Pemasangan lantai keramik ukuran 20 cm x 20 cm, Unpolish m2 27.75 169,499.00 4,703,597.25
2 Pekerjaan Dinding
- Dinding bata merah cm tebal 1/2 Batu Campuran 1SP : 4PP m2 452.52 160,050.00 72,425,826.00
- Plesteran 1SP : 3PP tebal 15 mm m2 905.04 72,838.26 65,921,538.83
- Acian semen m2 841.84 42,625.00 35,883,430.00
- Pemasangan keramik dinding 20 cm x 40 cm m2 63.20 291,681.50 18,434,270.80
- Backdrop m2 24.00 1,250,000.00 30,000,000.00
3 Pekerjaan Atap
- Rangka Atap baja ringan m2 364.50 194,975.00 71,068,387.50
- Pemasangan Atap Soka m2 364.50 87,967.00 32,063,971.50
- Pek. Lisplank Kalsiboard 2 x 20 Motif Urat m 94.00 90,530.00 8,509,820.00
- Pemasangan 1 m’ nok alumunium m 97.00 127,396.50 12,357,460.50
4 Pekerjaan Langit-langit
- Rangka Plafon Hollow modul 60 x 60 cm m2 118.95 161,562.50 19,217,859.38
- Langit-langit gypsum board 9 mm m2 10.00 51,449.75 514,497.50
- Langit-langit Kalsi board 3,5 mm m2 91.20 50,514.75 4,606,945.20
5 Pekerjaan Pintu dan Jendela
- Pemasangan Kusen Alluminium 4" m #NAME? 223,281.85 #NAME?
- pekerjaan Pintu 210x80 cm Set 30.00 1,750,000.00 52,500,000.00
- Pek. Pintu Kamar Mandi Set 10.00 1,623,722.25 16,237,222.50
- Bingkai Jendela Alluminium Set #NAME? 560,307.32 #NAME?
6 Pengecatan Dengan Cat Tembok m2 #NAME? 26,083.75 #NAME?
7 Drainase Terbuka m 70.00 156,906.16 10,983,430.92
8 Pekerjaan Kanopi Rangka Kanal C m2 120.00 240,000.00 28,800,000.00
Jumlah D #NAME?
HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA (Rp)
(Rp)
E PEKERJAAN MEKANIKAL & ELETRIKAL

1 Penyambungan listrik Unit 10 1,400,000.00 14,000,000.00


2 Pemasangan titik lampu Titik #NAME? 315,000.00 #NAME?
4 Downlight LED Titik #NAME? 165,000.00 #NAME?
6 Pek. Pas. Stop kontak Tunggal Titik #NAME? 44,935.00 #NAME?
6 Pek. Pas.Saklar Ganda Titik 10.00 48,400.00 484,000.00
7 Pek. Pas. Saklar Tunggal Titik 30.00 42,625.00 1,278,750.00

Jumlah E #NAME?
F PEKERJAAN PLUMBING

1 Pemasangan pipa PVC tipe AW diameter ¾ ” m #NAME? 24,420.00 #NAME?


2 Pemasangan pipa PVC tipe AW diameter 3” m #NAME? 73,367.25 #NAME?
3 Pek. Pas. Closet Jongkok Set 10.00 500,000.00 5,000,000.00
4 Septick Tank Buah 10.00 1,500,000.00 15,000,000.00
5 Pek Bak Air
- Pemasangan bekisting m2 #NAME? 190,278.00 #NAME?
- Pembesian dengan besi polos atau besi ulir Kg #NAME? 19,549.75 #NAME?
- Beton mutu f’c = 21,7 Mpa m3 #NAME? 1,361,014.02 #NAME?
6 Pengadaan dan pemasangan Mesin Air 130 Bit Bh 10.00 650,000.00 6,500,000.00

Jumlah F #NAME?