DLT838-2003《Guide of maintenance of power plant equipments English version》
DLT838-2003《Guide of maintenance of power plant equipments English version》
ICS 27.100
F23
Record No.:11439—2003
DL
中华人民共和国电力行业标准
DL/T 838—2003
instead of SD230—1987
发电企业设备检修导则
CONTENTS
FORWARD...........................................................................................................................................
INTRODUCTION................................................................................................................................
1 SCOPE ............................................................................................................................................1
2 NORMATIVE REFERENCE ...............................................................................................................1
3 TERMS AND DEFINITION .................................................................................................................1
4 BASIC PRINCIPLE............................................................................................................................3
5 BASIC REQUIREMENTS OF THE INSPECTION MANAGEMENT ...........................................................3
6 MAINTENANCE INTERVAL AND INACTIVE TIME ..............................................................................4
7 INSPECTION ITEM AND THE INSPECTION PLAN ...............................................................................6
8 THE INSPECTION MATERIAL,SPARE PARTS AND THE MANAGEMENT OF THE INSPECTION COST .....10
9 EXTERNAL ENGINEERING MANAGEMENT..................................................................................... 11
10 THE ENTIRE PROCESS OF THE POWER GENERATING ENTERPRISE’S INSPECTION. ........................12
Appendix A(Informative annex) A class inspection items reference table ................................17
Appendix B(Informative annex) Three years ( Year—— Year) Inspection the engineering
scrolling programming table ......................................................................................................49
Appendix C(Informative annex) The annual inspection programming schedule ......................50
Appendix D(Informative annex) The power generation enterprise annual inspection
programming schedule...............................................................................................................51
Appendix E(Informative annex) The inspection package file’s main contents..........................52
Appendix F(Informative annex) The generator set A/B class inspection whole set’s
management procedure figure....................................................................................................52
Appendix G(Informative annex) A/B class inspection cold,hot status evaluate and the main
device’s inspection summary report...........................................................................................54
Appendix H(Informative annex) A/B class inspection technology files’ referrence table.........68
DL/T 838—2003
Forward
This standard compare to the “Procedure of maintenance for power plant”(SD230—1987) have the
belowed main changes:
This standard is forward by the State Electric Power Corporation generating and power transmission
operation department;
This standard’s draft unit:State Electric Power Corporation generating and power transmission operation
department,Shangdong electrical group corporation, State Electric Power Corporation ,Dongbei
Corporation;
II
DL/T 838—2003
Introduction
This standard is according to the State Economic and Trade Commission power company “the notify about
the DL and the reschedule plan in 1999” (electric power [2000] 22 No.) to arrange revise.
The former edition “Power plant inspection instruction” (SD230—1987) is a mandatory provision
which is draw up,approve and implement by the state competent departments.It’s have the great
meaning for the device inspection, economical operation, guarantee the power equipment and
electric network’s safe and steady.Along with the development of the national power industry, large
capacity,high parameter machine sets are put into operation.Due to the differents reliability,security
and economical of the diverse machine sets,the former edition is not applicable to the inspection
items and the interval etc.instructions.At the same time, the new electricity system “factory and the
network is separate, bidding on the net” ,the power generation as an independence main body to
compete in the market,the device inspection is belong to the enterprise’s internal operation
management scope,so it’s not applicable to use the mandatory provisions.But,the power equipments
inspection have the common characters,its inspection plan have the great influence on the network’s
safety and its steady running.So you also need to have an industry standard to specification it,so this
time we revise the former mandatory standard to recommended standard and rename it as “Gudie of
maintenance of power plant equipments”.
III
DL/T 838—2003
This standard specification the power generation enterprise’s device inspection interval, inactive
time,plan and its relevant content management.
This standard is applicable for the unit capacity is 100MW and the aboved steam power plant or the
unit capacity is 40MW and the aboved hydraulic power equipment’s inspection work.And the other
capacity grade’s steam or hydraulic power equipments’ inspection work can reference to this
standard to carry out.
2 Normative Reference
Through the quoted by this standard , the following documents’ items are become to the items of
this parts.Any quoted documents if it is dated,the following modify notification (not including the
errata contents) or modify edition are not apply to this part.But,the agreement which is according to
this part can use this parts’latest edition. If it’s not dated,it’s latest edition can apply to this part.
GB/T19001 Qaulity management system requirements.
1
DL/T 838—2003
2
DL/T 838—2003
3.10 Disaccord
Disaccord means the quality can not acceptable or the items can’t judge due to its performance,files
or the deficiency of the procedure.
4 Basic principle
4.1 Power generation enterprise must according to the government regulation’s technology
supervision regulation,the design file which is provided by the manufacturer,the similar generating
set’s inspection experience and the results of the equipments status assessment etc.to managing your
devise inspection.
4.2 Equipment inspection must carry out “safety first” policy,put an end to any kind of break rules
and make sure the person and equipment’s safety.
4.3 The quality inspection management must according to the GB/T19001’s quality management
standard and carry out the whole course manage and push to the operation standardization.
4.4 The device inspection must carry out the budget management and the cost control.
4.5 The generator set inspection must base on the regular inspection and then enlarge the inspection
ratio step by step to integration the regular inspection,status inspection,improvement inspection and
failure inspection’s optimize inspection mode at last.
5.1 The power generation enterprise must finish all of the inspection workings to reach the aim of
the quality and standard during the specified period to make sure the generating set’s security, steady,
economical running and the construction and structure’s integrity and steady.
5.2 Power equipment inspection must use the PDCA (P—Plan, D—Do,C—Check, A—Action)’s
circulate method to make each planning and the specific measures from prepare the inspection to
construction,acceptance and assessment after the inspection work..
5.3 Power generation enterprise must according to the GB/T19001 quality management standard’s
requirement to set up the quality management system and organizations to issue the quality
management handbook and perfection the program file to push the procedure management.
5.4 The power generation enterprise must establish the enviromenttal and labour protection
measures during the course of the inspection in order to dispose any kind of waste,improving the
working enviroment and labour conditions,civilized construction and clean production.
3
DL/T 838—2003
5.5 The device inspection person must familiar with the system and the structure,performance and
priciple of the device,inspection technology,procedure,debug method, quality standards and working
regulation of power safety.The person must master the locksmith,electrician skill and other skills
which is closely related to this specialty,know and draw the simple parts and electrci principle
drawing.
5.6 The inspection working must use the advanced procedure and the new technology.You must use
the new material,new tooling to improve the working efficiency and shorten the inspection time.
5.7 Power generation enterprise should establish device status monitor and diagnosis structure
organization to inspection the critical device which reliability and security influence is big.
5.8 Power generation enterprise should use the advanced computer inspection management system
to implement the modernization of management.
4
DL/T 838—2003
Table 1 Generating set’s A class maintenance interval and inspection class compound mode
A class maintenance
Generating set types Inspection grade compound mode
interval year
Importing steam turbo Arrange one time generating set’s B class
6~8
generating set inspection between the two A class inspections
Domestic steam turbo time. Exclusion the A and B class
4~6
generating set inspection,arrange one time C class inspection
Sandy water power station each year.You can add one time D class inspection
4~6
hydroelectric generating set according to the specific conditions.For
example:A class maintenance interval is 6
years,then the inspection grade compound mode is
A—C(D)—C(D)—B—C(D)—C(D)
Non-sandy water power
— A.(This is mean you can arrange A class
station hydroelectric 8~10
inspection one time in the first year and arrange C
generating set
class inspection one time in the second years and
then you can add D class inspection one time
according to the conditions,then go on
According to the
running condition
Main transformer and testing result to Arrange C class inspection one time each year
decide,generally is
ten years
6.2 Accessory equipment and auxiliary equipment’s maintenance
The main device’s accessory equipment and auxiliary equipment must according to the device status
monitor,assessment results and the manufacturer’s requirements to follow the 6.1’s rules and decide
the detection grade and maintenance interval.
6.3 Generator set’s inspection inactive time.
6.3.1 The generator set inspection standard item’s inactive time is reference by the table 2 or table 3.
5
DL/T 838—2003
Note:Inspection inactive time are already including the load test’s require time.
6.3.2 Header system boiler and heat-supply steam generator set’s inspection inactive time should
according to the boiler nameplate’s cooling steam generator set’s capability.You can check it in the
table 2 and added 1d~3d at discretion.
6.3.3 For the sandy rain and severe corrosion water turbine generator set,its inspection inactive time
can use the table 3’s inactive time to multiply the correction factor which is not more than
1.3;Tubular turbine generator sets’ A class inspection inactive time should correspond added 20d
than the same dimension movable propeller generator’s A class inspection inactive time.
6.3.4 The generator set’s inspection inactive time can more the table 2 or table 3’s rule if the device
should change the main parts or have the other special requirements.
6.3.5 For the seasonal running water wheel generator set’s inspective inactive time,you can not
restricted by the table 2 and table 3.But you should in the boundary of which not effect the generate
electricity and power switching.
6.4 Gas turbine’s inspective interval,inspective grade and inactive time
Gas turbine’s inspective interval,inspective grade and inactive time which is according to the
manufacturer’s rules to implement.
6
DL/T 838—2003
Mixed type or propeller turbine type Propeller turbine type Impulse type
Wheel Dia.mm
A class d B class d C class d A class d B class d C class d
A class d B class d C class d
3300~4100(under) 45~55 35~40 7~9 60~70 35~40 7~9 30(35) ~35 (35)
Note 1: The value which in the ( ) is means vertical axis impulse unit’s inactive time.
Note 2: The generator set which material of the runner blade is the stainless,its inactive time must according to the lower limit to implement.
Note 3:The inspection inactive time is already including the loaded test’s required time.
Note 4:The generator set which use the D class inspection,its inactive time is the half of the C class inspective time.
7
DL/T 838—2003
7.1.1.6 The special items are the inspection items which is exclusion the standard items,
anti-accident measures, energy improvements and technically improve measures etc.items.The
significant special items is means the complex technical, long period, high cost or the items which
have the important effect of the system construction structure.The generating enterprise can
according to the requirements to arrange it into the each class inspection.
7.1.2 The auxiliary device of the main equipment and the auxiliary device must according to the
device status and manufacturer’s requirement to proper determine the inspection items.
7.1.3 The production building and the non-production device’s inspection
7.1.3.1 The generating enterprise must regular inspection the production building (workshop,coal
storage,ash dam,irrigation works construction etc.) and the important non-production device
(road,slope protection) and according to the practical situation to arrange the necessary inspection
items.
7.1.3.2 The water power generation enterprise’s construction and flood discharge device’s inspection
working must finish inspection before the flood coming.The sluice door and hoist machine must
carry out the checking test before the using.
7.2 Inspection project planning and the planning making
7.2.1The generating enterprise must making the inspection project scrolling programming for three
years and the latter half of the year’s inspection programming plan and delivery it to the authority on
the 15th Aug. each year.
7.2.2 Draw up the inspection scrolling programming plan for three years.
7.2.2.1 The three years inspection scrolling programming plan is the generating enterprise for the
latter three years’ A/B class inspection to pre-arrange the significant special items.
7.2.2.2 The contents of the three years inspection scrolling programming plan are including the
name of the engineering project,the former A/B class inspection time,the significant special items,
important technology measurement summary, prearrange the inspection time,prearrange the
inactive days,requirements spare parts and material (the three years inspection programming
scrolling specification table’s format is see the appendix B)
7.2.3 The arrangement of the annual inspection programming plan.
7.2.3.1 Each generating enterprise must according to factory’s main device, auxiliary device’ s
health and the inspection interval and the planning of the three years inspection scrolling
programming plan to draw up the annual inspection programming plan.
8
DL/T 838—2003
7.2.3.2 The annual inspection programming plan’s contents are mainly including the name of the
factory, inspection class,standard items,special items,main technology measurement,inspection
schedule arrangement,working hours and cost etc. (the annual inspection programming planning
table’s format is see the appendix C)
7.2.3.3 The main device inspection programming plan is according to the single main device to
arrange the unit project.
7.2.3.4 The auxiliary device is according to the system classify as the independence items to arrange
into the annual inspection project.
7.2.3.5 Production building’s heavy maintenance planning must according to the construction name
to list the unit project.
7.2.3.6 The non-production device ‘s heavy maintenance planning must according to its device’s
name to list the unit project.
7.2.3.7 The special item must arrange to the annual project planning step by step.
7.3 Draw up the annual inspection completion period and declaration
7.3.1 The generating enterprise must according to the annual inspection’s important requirements
which is forwarded by the authority and draw up the next year inspection period planning.The
annual inspection period planning is including the inspection grade,the time which is interval to the
former inspection time,inspection period,the arrangement of the inspection schedule and its
instruction etc.(the annual inspection period working table’s format is see the appendix D)
7.3.2 Before the 15th Oct.the generating enterprise must send the next year inspection period
planning to the electric network business operations each year.
7.3.3 After the electric network business operation receive the annual inspection period
planning,they should consider the forecast of the electric network,hydrology forecast information
and the energy policy,according to the impartial,opening and the justness policy to transfer the
electricity transformation for the next year and balance the generating equipment inspection
planning.Before the 15th Nov.,they must approve the next year all-optical network’s inspection
planning.For the generating set which must inspection in the next year’s first quarter,you must
pre-arrange it.
7.4 The annual inspection period planning’s adjustment and implement
9
DL/T 838—2003
7.4.1 Generally,the annual inspection period planning which is issued by the electric network
enterprise,the A,B class inspection’s on-stream time can not adjust otherwise,in the special
situation,you must report to the electric network enterprise to approve and determine in the quarter
and monthly inspection planning.Any parts who cause the change of the quarter and monthly
inspection planning must according to the relevant regulations to bear the responsibility.
7.4.2 In the annual inspection period planning which is issued by the electric network enterprise,the
C,D class inspection and the inspection which can effect the electric network output,running mode
and the important users’ auxiliary inspection,its on-stream time can be determine in the monthly
inspection planning.
7.4.3 The electric network enterprise must according to the annual inspection period planning to
released the next quarter’s generating set inspection planning before the 10th of the each quarter’s
last month.And released the next month’s generating set inspection planning before the 20th of the
this month.
7.4.4 On the premise of not effect the electric network’s speed and the accident spare parts,if have
the electric network enterprise’s approve,the power generation enterprise can use the holiday and
the network valley load to implement the D class inspection.
7.4.5 After the inspection working,if have the reason to added the inactive time,the power
generation enterprise must apply the application to the electric network enterprise before the half
of the generating set’s planning inactive time.And the enterprise must receive the approve before
the implement.
8 The inspection material,spare parts and the management of the inspection cost
8.1 The management of the inspection material and the spare parts.
8.1.1 The power generating enterprise must draw up the inspection material and spare parts’
management system.Its contents are including the draw up,ordering,delivery,acceptance,
storage,disposal of the non-conformance,record and information etc.requirements.
8.1.2 The inspection material planning should draw up by the speciality engineer (or speciality
inspecting person) and appendix the technology requirements and the quality guarantee
requirements.The special inspection items’bulk material,special material,mechanical and electrical
products and the spare parts must draw up the special planning,technology regulation and carry out
the open tender.Especially,you must strengthen the accident spare part and the parts’ storage and
management.
10
DL/T 838—2003
8.1.3 After the important special items which are released by the three years inspection scrolling
programming have approve and determine the technology project,you must bid for the spare part
and the special material,order and go on the inner and outer techonology cooperation etc.working.
8.1.4 The standard items’ required material and the spare part must according to the quota to
implement.The special items’ required material and the spare part must draw up by the each
speciality engineer and after the approve to submit to the relevant department to purchase.
8.2 Inspection cost management
8.2.1 The power generating enterprise must draw up the relevant inspection cost’s management
system and implement the budget management and cost control.
8.2.2 The inspection cost must according to the fiscal system,purpose and the inspection grade to
separate use and account.
8.2.3 The important special items which is approved in the three years inspection scrolling programe
can allow to draw the require capital in advance.
8.2.4 On the premise of implement the annual inspection task ,the power generating enterprise is
allowed to reversible use the main device,auxiliary device,production construction’s inspection
cost.But for the non-production device’s inspection and the maintenance,the cost can’t reversible
with the production device and production construction’s inspection cost.
9.1 The power generation enterprise must draw up the external contract award engineering
management system.The generating set control system and the relay protection system’s inspection
are not suitable to external contract award.
9.2 The contractor must have the relevant competency,achievement and the perfect quality guarantee
system and through the tender method to determine.
9.3 For the external contract award must use the contract management.The contract must definite
the items,security,quality,schedule,payment terms and liability etc. and reserved the suitable quality
deposit.
9.4 External contract award engineering quality managements.
9.4.1 The power generating enterprise must beginning from the project approval and determine the
external contract award’s technology principal and the quality accepter and quality management
the whole process of the items.
11
DL/T 838—2003
9.4.2 The power generating enterprise must draw up the inspection package file (the main contents
is see the appendix E) .And according to the quality requirements and operation procedure to set
the H point and W point and technical disclosure with the contractor. The contractor must strictly
according to the inspection package files to working.
9.4.3 Enhance the external contract award engineering’s post-occupancy evaluation working and
evaluate the contractor’s working performance.
9.5 The external contract award’s safety management.
9.5.1 The external contract award engineering must have the safety technology agreement and
definite both parts’ responsibility and together to monitor and acceptance.
9.5.2 Before the contractor’s construction team go into the production field,the power generation
enterprise must train the safety knowledge for them.After their pass the qualification test and then
can go into the production field.
9.5.3 The craneman,welder,scaffolder etc.special work personnel and metering device’s survey of
the contractor must have the relevant competence certification.The machine tool and instrument
must according to the relevant safety and technology regulate and have the qualified inspection
certification.
9.6 The contractor must strictly according to the power generation enterprise’s relevant rules
and regulations.
12
DL/T 838—2003
13
DL/T 838—2003
10.3.2.2 According to the device’s inspection condition and the measuring technology data and
compare to the device current situation,historical data,running status to complete assessment the
device.And based on the assessment result to adjustment the inspection items,schedule and cost in
time.
10.3.3 Maintenance and reinstallation
10.3.3.1 The device’s maintenance and reinstallation must strictly according to the technics
requirements,quality standard and the technology measurement to process.
10.3.3.2 The device must through the maintenance in order to make sure its according to the process
requirement and the quality standard.Already remove the deficiency and pass the acceptance then
you can reinstallation the device.You must not damage the device,misplace the parts and not leave
the sundries in the device when you are doing the reinstallation.
10.3.3.3 The reinstallation parts must take the antirust and anticorrosion measure.
10.3.3.4 The device’s former nameplate,encloser,label, the handrail and flat roof which due to its
effect the inspection so is dismantled temporary.This must be install as soon as the device is
reinstallation.
10.3.4 The device disassembly,inspection,maintenance and reinstallation course’ s requirements.
During the device disassembly,inspection,maintenance and reinstallation course,it’s must have the
detail technology inspection and techonology record.The capital letters are legibility,the data is
true,the measurement analyse is accurate and all the records are complete,right,simple and clear.
10.3.5 The quality control and monitor
10.3.5.1 The inspection quality management must carry out the quality control inspection to
integration the three class acceptance.If necessary,use the supervisor to monitor.
10.3.5.2 The quality inspection personnel must according to the inspection package files’s regulation
to check and visa the H and W points which is straightly effect the inspection quality.
10.3.5.3 If you find out the non-conformance items during the inspection,you must fill out the
non-conformance notify and according to the relevant process to handle.
10.3.5.4 All items’ inspection working and quality acceptance must use the sign responsibility
system and quality traceability.
10.3.6 Security management
10.3.6.1 During the device inspection course,you must carry out the security regulation,enhance the
security management,definite the safety responsibility and ascertain the safety measurement to
make sure the personnel and device’s security.
14
DL/T 838—2003
10.3.6.2 Carry out the work ticket system strictly and submit the contract safety agreement.
10.3.6.3 Enhance the safety inspection and convene the safety analyse meeting regularly.
10.4 Test running and report to rework.
10.4.1 The part test running must after the each parts testing is qualify,the inspection items’ have
complete and the quality is qualify,technology record and the relevant info is complete,the relevant
devices change notice and the written inspection disclosure report have submit to the running
department and disclosure the technology to them,clean the inspection spot and come back the
safety device and take charge of the running personnel.
10.4.2 Cold (static) status acceptance must after complete all the parts running test and when its
condition is all right and take charge of the power generating enterprise’s production responsible
person.We mainly testing the inspection item’s completion condition,the quality status, the parts
testing,parts test running and check the inspection technology info and the on-site inspection.
10.4.3 Entirety test running
10.4.3.1 The condition of the entirety test running is the cold (static) status acceptance is qualify,all
the qualify inspection can commissioning,complete the fire check,device nameplate and logo is
right ,the device change notice and the running attentions are all submit to the running
department,the test running outline have pass the approve and the running person finish to prepare
the running.
10.4.3.2 The entirety test running process must in charge of the power generating enterprise’s
production responsible person.The contents is including any kinds of the cold (static),hot (dynamic)
status testing and the on-load testing.
10.4.3.3 During the test running,the inspection person and the running person must mutual inspect
the device’s technology status and the running condition.
10.4.3.4 The continue on-load running time must not more than 24 hours after the
inspection.Thereinto,the full load testing time must have 6 hours to 8 hours.
10.4.4 After the whole test running ,complete the inspection and make sure its in the normal
condition and then the report generating set to the electric network to rework.
10.5 Inspection assessment and summary
10.5.1 After the generating set rework,the power generating enterprise must doing the technology
economic assessment about the security,quality,items,hours,material,the spare parts,technology
monitor,cost and the generating sets’ test running status etc.The main device’s cold (static) and hot
(dynamic) status assessment see the appendix G.
15
DL/T 838—2003
10.5.2 Doing the effective testing after the 20 days of the generating set’s rework and submit the
testing report and work out the efficiency assessment.
10.5.3 After 30 days of the generating set’s rework,you must submit the inspection summary
report.The inspection summary report format is see the appendix G.
10.5.4 Editing the inspection package files and the ratio of the spare parts to improve and perfect the
computer management data base.
10.5.5 The device inspection technology record,testing report,quality testing report,device change
notify,inspection package files,quality monitor acceptance,inspection management program or the
inspection files etc.technology info must according to the regulation to archive.The contractor must
responsible for the document finishing if the device’s inspection record and the relevant files info
are in charge of the contractor and then hand over to the power generating enterprise.A/B class
inspection technology files items are see in the appendix H.
16
DL/T 838—2003
Appendix A
(Informative annex)
1、Boiler barrel (1)Inspection the inlet eye access,check and clean the (1)Replacing ,improve or
inner’s corrupt and deposit of the boiler barrel; maintenance the steam-water
(2) Inspection the inner weld joint and the steam-water separation instrument;
(4)Inspection, clean the water gauge communicating (3)Boiler barrel repair weld,patching
pipe, pressure gauge connector, chemical feed pipe, machine and perforate.
2、Water screen (1) Clean the tube’s outer wall cinder and dust,check (1) Replacing the header box;
tube and header the tube weld joint and fins; (2)Replacing the water screen tube
box (2)Check the tube’s outer wall wear, expand, distortion, more than the 5%;
damage,fume erode and high temperature corrosion, (3)The water screen tube’s acid
tubes;
expansion clearance.
tightening force.
inner sediment;
17
DL/T 838—2003
3、Superheater, (1)Clean the dust of the tube’s outer wall; (1)Replacing the tubes are more than
reheater and the (2)Check the tube wear, expand, bending , 5% or dispose a large number of the
(4)Check and adjustment the header box supports and tube clamps are more than 25%;
(5)Open the hand hole or cutting the seal head,check more than 10%;
4、Fuel (1)Clean the dust of the tube’s outer wall; (1)Disposal a large number of the
economizer and (2)Check the tube’s wear,distortion,corrosion deficiency coiled pipe weld crater or
header box etc.condition,replacing the unqualified tube and elbow; chage the tubes are more than 5%;
(3)Check the supports and hangers,tube clamp and the (2)The fuel economizer’s acid
(4)Check and adjust the header box’s supports and (3)Replacing the whole sets of the
(5)Open the hand hole,check the corrosion deposit and (4)Replacing the header box;
18
DL/T 838—2003
(2)Non-contact desuperheater’s loose core inspection header box or the inner sleeve;
hangers;
6、Combustion (1)Clean the coking which are around the burner and (1)Replacing the burners are more
(2)Check the burner and replacing the (2)Replacing the air volume regulate
nozzle,inspection and repair welding the bellows; dampers are more than 60%;
(3)Check and replacing the burner’s adjusting (3)Replacing the air piping for one
(4)Check and replacing the air volume regulation more than 20%;
damper;
field testing;
tuyere;
19
DL/T 838—2003
7、The steam and (1)Check and adjust the piping expand indicator; (1)Replacing the main steam
water piping (2)Check the high temperature and high pressure main tube,reheat steam tube,main feed
system steam fitter,heat the steam fitter, main feed water pipe water pipe and its tee and elbow.And
weld crater and measuring the elbow’s wall thickness; replacing the large number of the
(4)Inspection the high voltage steam fitter’s electromotion main throttle valve or
(5)Inspection and adjust the supports and hangers; door and the safety valve;
(6)Inspection the flow measurement device; (3)Cutting and replacing the high
(7)Inspection and deposit the high temperature and temperature and high voltage
valve;
transmission device;
20
DL/T 838—2003
8、The air (1)Clean the dust and clogging of the air preheater; (1)Cheak and adjust the rotary
preheater (2)Inspection and replacing some pipes and the heating preheater’s shell iron plate or the
heater’s each part sealing arrangement, transmission (3)Replacing the tube shape
device,center bearing and the heating element preheaters are more than 10%;
etc.Check the rotor, fanning strip and then measuring (4)Replacing the rotary preheater
the rotor flutter degree; heating elements are more than 20%;
(4)Inspection and maintenance the inlet and outlet (5)Turn over or replacing the rotory
(5)Inspection and maintenance the cooling water (6)Replacing the rotory preheater’s
9、Feed coal and (1)Inspection the coal feeder,pulverized fuel feeder and (1)Replacing the whole coal feeder’s
system (2)Maintenance or replacing the lower coal pipe, the (2)Replacing the coal powder pipes
coal piping necking down,elbow and the expansion are more than 20%;
(3)Clean and check the pulverized coal bunker.Check bunker,must maintenance the
(4)Inspection the explosion door, air door, conveyer’s chain (Steel wire rope)
21
DL/T 838—2003
10、Pulverizer (1)Remove the pulverizer and pulverized coal system’s air leak,powder leak and (1)The basis of the inspection
and the maintenance shield,inspection,maintenance air door,baffle, lubricating system and and maintenance;
coal system (2)Inspection the fine powder separator,coarse powder and wood separator etc. bearing sphere, urgyen
(3)Inspection the pulverized coal bunker,air powder pipe,silt device and fire rinpoche or replacing the
extinguishing installation.Inspection and replacing the explosion door etc. wear-out rolling bearing;
1)Maintenance gear and pinion,the coupling and its transmission,anti-dust device; gear wheel or the gear wheel
2)Inspection the barrel and weld joint.Inspection steel tile,lining board,bolt etc.By turn over, replacing the whole
3)Inspection lubrication system,cooling system, inlet and outlet chute coil pipe and reduction box gear wheel.
4)Inspection the bearing,oil pump station,any kinds bolt etc; pulverizer turbine, the bevel
6)Inspection the hollow shaft and the end cover etc. (5)Replacing the high speed
1)Check the body, replacing the worn-out grinding ring,abbrasive wheel,abrasive type pulverizer’s shell or the
bowl,scaleboard, Wear gadolinium, wear gadolinium sleeve etc., inspection whole set plate;
2)Inspection the stone coal drain valve,air ring and the main shaft seal device; fine powder separator or the
3)Adjust the on-load instrument and the alignment center; meal powder separator;
4)Inspection and clean the lubrication system and the cooling system,Check the
hydraulic system.
5)Inspection and maintenance the sealed electromotor.Check the inlet and outlet
baffle and wind box.Adjust the wind box scaleboard and replacing the scraper blade.
parts.
2)Inspection the bearing and cooling device,main shaft seal and the cooling device;
22
DL/T 838—2003
11、Any kinds (1)Inspection and maintenance the wear-out shell,plate,blade,impeller and the bearing protective (1)Replacing the whole
draft fan, (2)Check the inlet and outlet baffle,blade and the transmission device; the impeller and shell;
blower, (3)Check the rotor,bearing,bearing box and the cooling device; (2)The sliding bearing is
Pulverized (4)Inspection and maintenance the lubrication system and check the fan and the motor oil station double teeming the
primary air (5)Inspection and maintenance the hydrodynamic coupling or the converter plant;
12、Fuel (1)Inspection the grease gun, the fuel oil atomization nozzle and the oil pipe connection device; Cleaning the oil tank
(4)Inspection the fuel regulation door and the inlet and outlet throttle;
(6)Inspection and maintenance the fuel quick-break valve,oil drain door, electromagnetic valve
etc.;
(8)Check the oil piping system’s jumper wire and the earthing device;
13、The dust (1)Clean the inner parts’ dust and eliminate the air leak; (1)Maintenance the flue
body 1)Inspection the nozzle,water supply system and the moisture film test; body;
2)Maintenance the ceramic tile,water screen,air lock and and the pipe; (2)Replacing the large
1)Inspection and maintenance the anode plate,cathode rays and frame etc.; (3)Readjust the static
2)Inspection and maintenance the cathode,anode rap device and the anode-cathode distance etc.; dust remover’s anode
3)Inspection and maintenance the transmission device,heater device and the air lock etc.; -cathode distance;
4)Inspection the flow equalizing plate,spoiler etc.’s wear-out condition or replacing some; (4)Replacing the cathode
5)Inspection the ash hooper , hot mixing and the stirring device; rays are more than 20%;
6)Inspection the shell’s leak tightness and eliminate the air leak; (5)Replacing the anode
7)Inspection the high voltage generator,power distribution unit,control system,electrical cable and plates are more than
23
DL/T 838—2003
14、Steel (1)Inspection the observation door,inlet port door, explosion door,expansion joint and (1)Adjust the steel frame;
seal and the (2)Inspection and maintenance the furnace hopper, water wall preserve heat and the arch seal; insulating layers are more than 20%;
body heat (3)The part steel frame’s anti-corrosion; (3)The arch encloser and the steel
preservation (4)Dredge and maintenance the beam’s draught cooling device; frames’ anti-corrosion;
(5)Inspection the steel beam and the beam’s sinking and bending condition; (4)Rework the arch roof seal;
15、The (1)Inspection and maintenance the boiler pump and the electromotor; The electromotor’s winding
boiler (2)Inspection and maintenance the filter,filter screen, high voltage valve and the pipeline; updating
water’s (3)Check and clean the condenser and the cooling system;
circulating
pump
16、The (1)Inspection the electromotor and the switch; (1)Replacing a great deal of the
subsidiary (2)Check and adjust the relevant electric instrument, control the loop,protector,automatic electric cable and the control electric
accessory (3)Inspection the distribution device,electric cable, illuminating equipment and the (2)Replacing the high voltage
17、Others (1)The boiler’s hydraulic pressure testing and check the bearing pressure parts’ leakproofness; (1)The boiler’s overpressure testing;
(9)Inspection and maintenance the low and high pressure drain system and device.Check its
safety door;
(11)Check are according to the metal,chemical monitor and boiler pressure container monitor
regulation.
24
DL/T 838—2003
1、Cylinder (1)Inspection and maintenance the cylinder and nozzle,clean and check the cylinder (1)Replacing some nozzle blocks;
bolt,drain hole, pressure gauge hole and the thermometer well; (2)Maintenance the cylinder joint
(2)Clean and check the diaphragm sleeve,clapboard and the stationary surface;
blade.Measuring the clapboard deflection,if neccesary,disposal it. (3)Replacing all of the insulating layers
(4)Measuring the upper and lower cylinder’s joint surface clearance and the (4)Repair welding the cylinder’s crack;
(5)Measuring and adjust the diaphragm sleeve and clapboard’s groove center; clapboard;
(6)Inspection and replacing the explosion door’s diaphragm.Check the (6)Unclamp the bearing box.Check and
moisture-removal device and the water injection system; maintenance the slidingkey system or
(7) Replacing the high and medium inlet air pipe’s sealing.; adjust the cylinder level;
(8)Maintenance the cylinder’s insulating layer; (7)Replacing the high temperature alloy
2、Steam seal (1)Clean,check,adjust and little replacing the shaft seal and diaphragm steam seal; Replacing the steam seals are more than
(3)Measuring the shaft sleeve distortion. Measuring and adjust the shaft sleeve’s
groove center;
3、Rotor (1)Check the main shaft,impeller and the other shaft accessory. Measuring and (1)The blade frequency modulation;
adjust the through-flow parts clearance,bearing neck up-rising inclination and the (2)The coupling wheel’s reamed hole;
(2)Check the measuring shaft neck’s conicity, ellipticity and the rotor (4)The rotor’s dynamic balance;
bending.Measuring the impeller,coupler,thrust disc’s displacement degree and the (5)The macroaxis’s inner defect
(4)Clean and check the moving blade,lacing wire, retraction ring,rivet,hard metal (7)Rework or replacing the blade;
tip.If neccesary, anti-corrosion the exhaust stage blade; (8)Replacing the impeller;
(5)The blade’s frequency measuring,blade and the blade base defect detecting test;
(6)The impeller key groove and the coupling wheel bolt which need to stress
25
DL/T 838—2003
name
4、 (1)Clean and check the journal bearing,thrust bearing.If necessary,maintenance, Double teeming the bearing’s black glaze
Bearing measuring,regulate the bearing, oil guard’s clearance and the bearing tightening force; or replacing the bearing;
5Turning Check and measuring the gear,wheel,bearing and the guide slide bushing etc.parts’ Replacing the whole sets of the turning
6、The (1)Clean and check all of the regulating system’s parts.Check the protective device, the (1)Replacing the whole sets of the speed
speed testing device,measuring clearance and the dimension.If necessary,maintenance and governor’s security system;
g system (2)Inspection the speed governor,hazard protector and its spring.If necessary,testing its load rejection testing;
performance;
7 、 Oil (1)Clean and check the governor oil system,lubricating oil system and its device (1)Replacing the oil cooler’s core;
system parts.Measuring the relevant parts’ clearance and dimension.If necessary, replacing and (2)Replacing the lubricating oil or the
maintenance the parts and doing the water pressure testing of the oil cooler; anti-fuel oil;
(2)Clean and check the oil seal system and its device parts.If necessary, replacing the parts; (3)Clean all of the oil pipes;
(3)Clean and check the anti-fuel system and its device parts,servo valve’s performance (4)Replacing the sealing pad and the inner
(4)Inspection and maintenance the sealing pad,measuring and adjust the clearance; (5)Replacing the servo valve etc.;
8 、 The (1)Check and maintenance the main valve,bypass valve,extraction valve,extraction check (1)Replacing the DN200 and the aboved
steam valve,governing valve and the safety valve; high pressure valve;
and (2)Inspection and maintenance the high and low bypass system piping and valve; (2)Replacing the main steam pipe,water
water (3)Inspection and maintenance the air valve,water strainer and temperature decreased feed pipe and its tee and the elbow;
system (4)Measuring of the main steam pipe creep expansion high,medium and low pressure piping;
(5)Inspection and regulate the piping supports and hangers,expansion the indicator; (4)Adjust and replacing the main steam
(6)Maintenance and regulate the valve’s driving device; piping’s supports and hangers which is
(7)Maintenance the high and low pressure drain flash tank and drain water valve; running aboved the 2 thousand hours;
26
DL/T 838—2003
9、Condenser (1)Clean the condenser.According to the requirement to sampling (1)Replacing the condensers are
the condenser to analyse and check.If necessary, replacing some more than 20%
cleaning device;
10、The air (1)Inspection the main,subsidiary air extractor and condenser and (1)Replacing the vacuum pump
the vacuum (2)Cleaning the inspection the vacuum pump,water-jet pump and (2)Replacing the air extractor
11、Reheating (1)Inspection and maintenance the extractor and reheating system; (1)Replacing the heat
system (2)Inspection and maintenance the reheating system device’s transmission pipes are more than
accessory; 10%;
(3)Heater bowl,measuring the thickness of the drain (2)Improve the heater drain
12、Water pump (1)Inspection and maintenance the condenser water pump,drain (1)Replacing the water pump
water pump,feed water pump,water booster pump and the other impeller shaft and bearing;
water pump.If necessary, replacing the impeller and guide blade; (2)Replacing the blade of the
(2)Inspection and maintenance or replacing the water pump inlet steam water feed pump turbine;
and outlet gate valve, check valve,inlet screen and the oil (3)The balance testing of the
27
DL/T 838—2003
13、deaerator (1)Inspection and maintenance the deaerator and its (1)The deaerator’s super presure testing;
accessory,doing the water pressure testing and verify the (2)Improve the deaerator nozzle;
(2)Inspection and maintenance the deaerator’s water (4) Replacing the deaerator stuffing;
distribution device;
14、Circulating (1)Inspection and maintenance the circulating water pump (1) Replacing the impeller and bearing;
water system and the outlet butterfly valve; (2)The circulating water piping’s large area
(4)Inspection and replacing some water tower stuffing,water stuffing,water distribution device and the
(5)Cleaning the cooling tower pool; (5)The water tower barrel and the upright
anti-corrosion;
15、The (1)Inspection the electromotor and the switch; (1) Replacing a large number of the electric cable
accessory (2)Check the relevant electric instrument,control loop, and the control cable;
electric device protective device,automatic device and the signal device; (2)Replacing the high voltage electromotor
28
DL/T 838—2003
1、Stator (1)Check the end cover,guard plate,wind deflector,gasket; (1)Replacing the stator wire or
(2)Inspection and clean the stator winding’s outgoing line maintenance the wire insulator;
end part is insulator and checking the fastening condition.If (3) Replacing the slot wedges or the end
necessary,paint the winding end parts; parts wood casings are more than 25%;
(4)Check and clean the iron core,slot wedge and the ventilate (4)Maintenance the part iron core or
(5)The liquid cooled stator winding must through the winding’s hydroelectricity connectors are
(6)Measuring the corrugated board’s clearance; (6)Replacing the liquid cooled stator
(7)Check the thermometric element; winding’s coupling pipes are more than
25%;
terminal’s vibration;
2、Rotor (1)Measuring the air clearance; (1)Draw the guard ring,disposal the
(2)Draw out the rotor,inspection and sweeping the rotor winding turn- to-turn short circuit or the
thimble,fan,journal and the counter-balancing mass; (2)Replacing the fan blade,slip ring and
wire.If necessary,wear and turning the slip ring; (3) Replacing the rotor winding insulator;
(4)The liquid cooled rotor winding must through the back (4) Replacing the rotor guard ring,thimble
flushing and water pressure,flow testing,hydrogen inner etc. importance structural unit;
cooled rotor to carry on the ventilate and air tight testing; (5) Replacing the rotor inlet pipe;
pipe;
29
DL/T 838—2003
3、Cooling (1)The air-cooled generator.Clean the air chamber,inspection the (1)The condenser copper pipe’s
system tightness condition.If necessary,paint the air chamber; Inspection and inner wall acid cleaning;
clean the air condenser and the air strainer; (2) Replacing the condenser;
carry on the liquid cooled generator’s pressure testing and eliminate the
leakage;
tightness testing;
4、Excitation (1)Inspection and maintenance the AC excitation stator,rotor winding (1)Replacing the exciter
system and iron core.If necessary,polishing and turning the slid ring; stator,rotor winding or slip ring;
(3)Inspection the brushless excitation stator,rotor winding and iron transformer’s suspended core;
core.Check the rectifying element and the relevant control regulation (3)Replacing the power rectifier
(4)Inspection and testing the static excitation system’s power rectified (4)Replacing a large number of
5、Others (1)Inspection the oil pipe flange and the exciter bearing seat’s Replacing the power distribution
30
DL/T 838—2003
Table A.4 The heat-engine plant’s control system A class inspection reference items
Part name The standard items The special items
engineering (2)Inspection the heat engineering inspection component (Such as the thermometric
device’s sleeve);
appearance test (3)Inspection the heat engineering disc (desk) bottom electric cable’s block up condition
2、Heat (1)Inspection and check each kinds of the transmitter; (1)Replacing a large number of
engineering (2)Checking each kinds instruments,thermometric component and its compensating the meters or the important
(3)Inspection and check the part component and the whole sets calibrating device (2)Replacing a large number of
3、Heat (1)Inspection and check the heat engineering automatic system and its device,parts to Replacing the importance
engineering carry on the static simulation test.Checking the actuator; measuring device and the
automatic system (2)The dynamic adjustment and the disturbing test; actuated equipment
4、Heat (1)Adjustment the first and second components,actuated equipment and its control loop; Replacing the importance
engineering and (2)Inspection and adjustment the protection fixed value,switch motion value,inspection measuring and the actuating
the interlock the testing solenoid valve,baffle,electromotor etc.device and the components; device;
system (3)Carry on the protective and the sequence system,interlock system logic function
testing;
5、Distributed (1)Clean,check or testing system hardware and the peripheral equipment. If necessary, (1)Replacing the importance
(DCS) (2)Checking the power device,carry on the switching the power supply testing; device;
(4)Inspection the system software back up and set up the back up record; configuration,setting
(5)Inspection and testing the data acquisition and the communications network; value,control loop,software
(6)Inspection the control modular unit and the man-machine interface device; revision’s update;
(10)Inspection and check the input/output (I/O) card channels and the configuration
software;
31
DL/T 838—2003
6、 (1)Inspection and checking the transducer,the primary element; (1)Replacing the importance
Coordinated (2)Inspection the actuating valve and carry on the performance testing; measuring, actuator device;
control (3)Check the status indicator and carry on the function testing; (2)Replacing the software
(5)Carry on the fixed value (load) disturbing testing; value, control loop,the
(6)Inspection the oxygen measuring device,demarcate the oxidation drilling probe.If necessary, software revision update;
replacing it;
7、The hearth (1)Inspection the input voltage grounding system; (1)Replacing the importance
safety (2)Inspection and checking the solenoid valve,baffle,transducer and the thermocouple; measuring, actuator device;
monitor (3)Checking and adjusting the pressure switch and the sampling pipe,temperature switch, (2)Replacing the software
system flowing switch,blaze monitor system device and carry on the oil leakage testing; configuration,the setting
(5)Inspection the burner management control loop and checking the burner sequence control’s condition; software revision update;
(7)Carry on the boiler sweeping,grease gun and the burning torch operation test,the master fuel
8、Data (1)Checking the scene componet,the external signal first componet and the input signal; (1)Replacing the importance
acquisition (2)Carry on the hardware testing and the status testing; measuring, actuator device;
system (DAS) (3)Inspection the measuring range and the units (2)Replacing the software
9、Turbine (1)Inspection and checking the first component and transformer etc.external device; (1)Replacing the importance
digital (2)Inspection and measuring the system hardware and the software; measuring, actuator device;
electronic (3)Inspection and measuring the I/O signal,parameter measuring range; (2)Replacing the software
control (5)Carry on the system cooled whole sets’ debug; value, control loop,the
system (DEH) (6)Carry on the system hot condition optimize; software revision update;
32
DL/T 838—2003
10、Feed pump turbine (1)Inspection and checking the first components and transformer (1)Replacing the importance measuring,
system (2)Inspection and maintenance the system hardware,software; (2)Replacing the software
(3)Inspection and maintenance the I/O signal,parameter measuring configuration,the setting value, control
11、Sequence control (1)Inspection and install the measuring component,relay; (1)Replacing the importance measuring,
system (SCS) (2)Inspection and testing the card,tuning set; actuator device;
(3)Inspection the I/O signal,logic function and the protective function; (2)Replacing the software
(4) Inspection the actuator operation condition; configuration,the setting value, control
(5)Carry on the local loop debug and the relevant protective testing; loop,the software revision update;
12、Steam turbine monitor (1)Inspection and checking the probe,proximitor and the transducer; (1)Replacing the importance measuring,
instrument system (TSI) (2)Inspection the second table and its components; actuator device;
(3)Inspection the indicating value,carry on the tuning,system whole set (2) Replacing the software
debug and the verification the function; configuration,the setting value, control
(4)Inspection the input power and the grounding system; loop,the software revision update;
13、Bypass automatic (1)Inspection and installation the transducer and the first components; (1)Replacing the importance measuring,
regulation system and the (2)Inspection the regulating valve’s operation condition and carry on actuator device;
pressure and temperature (3)The static simulation testing,system linkage testing and the configuration,the setting value, control
14、External control (1)Inspection and testing the first time component,switch and the
transport,waste water,ash (2)Inspection and maintenance the control card,cabinet and the
treatment) (3)Clean and inspection the power unit and carry on the electric cable
testing;
33
DL/T 838—2003
15、Steam turbine (1)Inspection the first components and make sure the sampling (1)Replacing the importance measuring,
(ETS) (2)Carry on the protective testing and make sure the fixed (2)Replacing the software
16、Furnace electric (1)Inspection and testing the switch contact and relay; (1)Replacing the importance measuring,
17、Electric cable (1)Inspection,clean and maintenance the electric cable’s flat and
truss;
device system
18、Others (1)Inspection and maintenance the blaze and the drum water
lever monitor;
34
DL/T 838—2003
Table A.5 Wet flue gas desulfurization device’s A class inspection referrence items
Part name The standard items The special items
1、Booster fan (1)Inspection the booster fan’s fastener,connector and the accessory; Replacing all of the booster
(2)Inspection and maintenance the booster fan’s rotary and static parts. If fan’s blade
(3)Clean and checking the lubrication and hydraulic oil system and device;
(4)Check the inlet and outlet baffle,impeller and the transmission device;
2、Gas-Gas-Heater (1)Inspection and clean the rotor’s booster device; Replacing the heat exchange
(GGH) (2)Inspection and clean the driving system and transmission parts; components are more than
(3)Inspection the gland steam seal system and adjust the seal clearance; 20%
(6)Inspection and maintenance the high voltage wash water system and the
(7)Inspection and maintenance the flue gas sealing system and the flue gas
(8)Inspection and maintenance the compressed air system and the inspection
3、Absorption tower (1)Inspection and maintenance the inner wall’s rubber lining; (1)Maintenance the anti-
(2)Inspection and maintenance the nozzle,paint the horizon bracket rubber corrosion rubber lining’s
(3)Inspection the defroster and the defroster bracket rubber lining; (2)Replacing the nozzles are
(6)Inspection and checking the oxidation booster fan and cleaning its inlet
filter screen;
(8)Inspection and clean the overflow,low liquid level sampling hole and
35
DL/T 838—2003
(4)Inspection and maintenance the suction cover and the wear plate;
(5)Inspection the shaft and the shaft sleeve.If necessary, replacing the bearing;
5、The vacuum (1)Inspection and clean the dehydration conveyor and its accessory.
dehydration conveyor (2)Inspection and maintenance the conveyor adjustion air compressor,clean the inlet filter
screen;
(4) Inspection and maintenance the liquid ring vacuum pump,acid cleaning the liquid ring
vacuum pump;
(6)Inspection,maintenance, debug the pass-line deflection device and flush flow control device;
6、Flue gas system (1)Inspection and adjust the flue gas baffle regulation device;
7、Limestone flour’s (1)Inspection and clean the limestone inner wall,vulcanizing bath and the cloth bag dust
transportation, serosity (2)Inspection,clean and maintenance the limestone feeder and the feeding machine;
making system (3)Inspection and clean the secrosity tank and its secrosity orifice,reflow orifice and the
(4)Inspection and maintenance the vaporization blower,clean its inlet filter screen;
(5)Testing and adjust the limestone storage’s safety pressure relief valve;
8、The gypsum (1)Inspection and clean the circulating water collection box,clean the water sump,filter water
dehydration and the tank,calcium plaster fluid container,filtrate separator and the gypsum storage;
storage system (2)Inspection and maintenance the gypsum conveying filter,gypsum storage discharging device;
(4)Inspection and maintenance the gypsum divider and the gypsum swirler;
36
DL/T 838—2003
9、The accident (1)Inspection and clean the accident serosity tank’s inner wall rubber lining;
storage tank and the (2)Inspection and maintenace the accident serosity hydrolic pump,accident serosity drain pump,
serosity’s feeding and the accident serosity drain agitator,cypsum slurry to the accident tank’s orifice;
release system
(3)Inspection and maintenance the process water pump and the pressure maintaining valve;
11、Waste water (1)Inspection and clean the decanting / concentrating tank,counteract/flocculation tank,waste
treatment water storage tank,fresh water tank,lime silo,the lime digester and the lime serosity tank etc.
containers;
slurry circulating pump,fresh water pump,waste water pump,waste water circulating pump,
(8)Inspection and maintenance lime feeder and the lime feeding machine;
37
DL/T 838—2003
1、The hydraulic (1)Measuring the bearing clearance; (1)Improve the water guide
turbine’s bearing (2)Disassembly,clean,inspection water seal and the bearing; bearing configuration;
(3)Clean,inspection and maintenance the bearing bush; (2)Improve the water guide
(6)Clean the oil basin,inspection the leakage, disassembly inspection the pitot bush;
tube and the oil pump; (4) Replacing the oil cooler;
(8)Clean and inspection the bearing box,oil filter to carry on the oil
(9) Replacing the water seal device and the inflatable seals’ wearing part;
2、The water guide (1)Disassembly,clean and inspection the cover drainage; (1)Replacing the water
device (2)Lubricant the water guide device’s lubrication parts; guide’s upper,middle,lower
*(3)Measuring and adjust the water guide impeller and the vertical face bearing;
clearance (Not more than the total number’s 1/4) (2)Replacing the control
*(4)Disassembly,inspection and replacing the water guide sleeve’s bearing ring vertical face,end face’s
seal (Not more than the total number’s 1/4); anti- wearing plate;
(5)Maintenance the water guide parts’ cavitation wearing; (3)Replacing the top cover
(6)Measuring and adjust the servomotor’s compressing stroke; and the base ring’s
(7)Disassembly,inspection the servomotor and carry on the pressure-tight test anti-wearing ring;
or replacing the piston ring,disassembly,checking the locking device and (4)Improve the water guide
*(8)Repair and rubbing the water guide shaft neck; clearance hermetic seal.
*(9)Disassembly,clean and inspection the double bar link,measuring the Such as replacing the soft
movable pin shaft sleeve and replacing the wear-out part; sealing to the hard sealing;
*(10)Inspection and rubbing the control loop’s vertical face and the end face
wear plate;
38
DL/T 838—2003
3、Turning wheel (1)Measuring the labyrinth ring clearance (or the propeller type runner blade (1)Replacing the turning
and the main shaft and the runner chamber clearance); wheel blade;
*(2)Checking and maintenance the running wheel and the runner chamber’s (2)Dispose the shaft neck
cavitation,wearing,crack(during the checking working day,the turning eccentric wear and the
2
wheel’s diameter is less than the 3.3mm, repair 0.5m ,single layer. If more crack;
(3)Inspection the runner cone’s regular condition and maintenance the ring;
(5)After the runner hub recoil oil,inspection the blade’s operation condition (5)Repair the runner wheel
and measuring the sealing equipment’s oil leakage volume; at a large area and the
(6)Clean the runner chamber’s inner parts,inspection and replacing the runner chamber;
wear-out parts;
device;
pressure-tight test;
4、The flow hose, (1)Inspection the volute and the draft tube; (1)Enhance or improve the
volute and the draft (2)Repair the draft tube cavitation; flow hose pressure steel
tube (3)Checking the flow steel pipe,slip joint leakage and leaking stoppage; pipe;
(4)Disassembly,inspection and maintenance the air valve,volute drain valve, (2)Replacing the draft tube’s
the draft drain valve and the technology water supply valve; lining;
(5)Underwater inspection and clean the intake water screen; (3)Waste screen barrier and
(6)Clean and inspection the measuring meter; clean, maintenance and anti-
*(7) Replacing the flow steel hose expansion joint’s sealing stuffing; corrosion;
39
DL/T 838—2003
5、Hydraulic (1)Disassembly,clean,dispose and testing regulate the vacuum breaker valve; (1) Replacing the vacuum
turbine’s air (2) Disassembly,clean,dispose and testing regulate the suction vacuum valve; breaker valve and the suction
supply (3) Replacing the vacuum breaker valve,suction vacuum valve’s parts; vacuum valve;(2)Replacing
equipment (4)Inspection and maintenance the cross replenishing air bracket; the cross replenishing air
bracket;
6、Speed (1)Disassembly,checking and clean the speed governor’s each parts and pipe; (1) Replacing the main
regulating (2)Inspection and dispose the main distributing valve,auxiliary servomotor, lead valve,pendulum distributing valve;
system rotating sleeve and the plunger lever; (2)Replacing or improve the
(3)Regulate the water guide vane opening and the indicator of the impeller rotor angle; servomotor;
(4)Regulate and testing the buffer,actuating apparatus and the accident distributing valve etc.; (3)Replacing the electro-
(9)Measuring and adjust the servomotor stroke,the relation curve of the water guide divergence;
(11)Measuring and adjust the water guide,turning wheel blade’s switching time;
(12) Replacing the flywheel’s rota ting sleeve and needle plug etc. parts;
*(17) Replacing the auxiliary servomotor and the hydraulic valve etc. parts;
7、Oil pressure (1)Clean,inspection and handle the oil pressure tank,oil reservoir,drip tank and anti-corrosion; (1)Replacing the group
installation and (2)Clean and inspection the oil strainer and carry on the maintenance and replacing; valve;
the oil leakage (3)Disassembly checking,maintenance and testing the oil pump,safety valve,air relief valve, check (2)Replacing the turbine oil;
(4)Clean,checking the oil cooler and carry on the pressure-tight test. If necessary,replacing it;
*(9)Carry on the pressure-tight test of the pressure oil tank and checking the pressure container;
40
DL/T 838—2003
8、Butterfly valve,ball (1)Measuring and adjust the inspection switching time; (1)Replacing the inlet valve;
valve,cylindrical valve (2)Carry on the leakage testing of the hermetic seal and the leakproofness (2)Improve the quick-acting
gate (3)Disassembly to inspection the main bearing,bearing shoe grinding and the shaft (3)Carry on the anti-corrosion
(4)Replacing the ball valve O-ring seal,water seal ring or the bearing bush;
(10)Inspection and testing the electric control system and the whole set system
operation setting;
*(11)Replacing the butterfly valve’s water-seal shrouding and the shaft seal;
*(12)Carry on the movable water shut down test of the inlet valve and the
quick-acting gate;
*(13)Carry on the pressure tight test of the ball valve’s body,replacing the worm
9、Lubricating head (1)Disassembly and inspection the lubricating head; (1)Replacing the lubricating
(2)Inspection the lubricating head’s operation oil line; head’s operation oil pipe;
(3)Measuring the brasses clearance and scrape the brasses; (2)Replacing the brasses;
10、Others Inspection and testing the hydraulic turbine on-line monitor system
Note:In the table which is not have the * sign is the B class inspection items.
41
DL/T 838—2003
1、Stator (1)Inspection the stator base,the iron core and the radial jack.Inspection and replacing the breaking pin; (1)Replacing the bar;
(2)Inspection the stator end parts and its support structure,maintenance the gear tooth support; (2)The overlap iron
(4)Inspection and maintenance the wind shield plate,fire unit; (3)Improve the stator
(6)Carry on the backflushing,flux and the water pressure testing of the internal water cooling stator rod; (4)Replacing the
*(10)Handle the end parts joint,packing block and the binding wire;
*(11)Inspection and handle the split stator joint close and the stator’s ellipticity;
*(13)Inspection and dispose the stator slot wedge,checking and clean the cooling ducts;
2、The rotor (1)Measuring the generator’s air clearance; (1)Improve the rotor,
and the (2)Inspection the wheel hub,wheel arm’s weld joint,assembly bolt,wheel arm key, wheel ring lie key; replacing the
main shaft (3)Inspection the magnetic pole,magnetic pole key,magnetic joint,damping ring, rotor fan; magnetic pole;
(5)Inspection the damping ring and its baffle; replacing the slip
(6)Inspection,regulate the slip ring brush device and the lead wire; ring;
(7)Carry on the electric preventive testing and measuring the shaft voltage,shaft current;
(8)Backflush the inner cooled rotor,flush and the water pressure testing;
(9)Regulate the machine set axis (including the lubricating head operation oil pipe)
*(12)Measuring, adjust the rotor roundness and the magnetic pole elevation;
42
DL/T 838—2003
3、Bearing (1)Inspection the thrust bearing’s rotating parts,bearing seat and the oil tank; (1)Replacing the guide
(2)Measuring the elasticity oil tank’s compressing value; bearing bush, thrust pad;
(3)Inspection and scrape the bearing bush,carry on the water cooled bearing bush tunnel descaling (2)Replacing the oil
(4)Measuring,adjust the guide bearing pad’s clearance,inspection the guide bearing; (3)Improve the cooling
(7)Inspection the oil condenser and carry on the pressure testing,clean the oil pipe,water pipe and replacing the runner plate;
(8)Clean and inspection the jacking-up apparatus for high pressure oil;
*(10)Adjust the thrust bearing to horizontal and carry on the thrust pad’s stress adjustment;
4、Frame (1)Inspection and clean the frame; Reinforce and improve the
Excitation 1)Measuring and adjust the air clearance; 1)Turning and painting the
system 2)Clean and inspection the exciter’s each part and the lead wire; exciter commutator;
3)Inspection and adjust the electric brush device and scrape the mica slot; 2)Replacing the exciter’s
4)Clean and inspection the excitation loop’s each components and carry on the electric performance magnetic pole or the armature
testing; winding;
5)Inspection and handle the exciter’s slot wedge; 3)Replacing the high power
7)Carry on the exciter’s no-load and on-load performance testing; 4)Improve the communtator;
*8)Rewelding the exciter’s armature winding,rebinding the wire; (2)The static excitation
*9)Adjust the exciter’s main pole and commutating pole’s clearance; device:
2)Inspection and testing the exciter transformer,series transformer,parallel transformer,voltage 2)Replacing the power
43
DL/T 838—2003
5、Excitation 3)Inspection,testing the cell board,pulse board,power cabinet and the rectifying 3)Replacing the field
4)Inspection and checking each relays,relay contactor,inspection the secondary 4)Replacing the exciter
6)Loop simulation testing and carry on the static,no-load and on-load testing;
9)Inspection and maintenance field suppression device and the rotor over voltage
protection device;
6、Ventilate and (1)Inspection,cleaning,anti-corrosion and the water pressure testing of the cooler; (1)Replacing the cooler or
its cooling (2)Inspection the pipe valve and carry on the water pressure testing,repair the the copper pipe;
7、Brake (1)Measuring and adjust the brake flashboard and the damping ring clearance; (1)Replacing the brake or
(3)Disassembly,maintenance the brake and carry on the pressure-tight testing; at a large scale;
(4)Inspection the braking oil,breather line,valve and carry on the pressure testing; (2)Improve the braking
8、Permanent (1)Measuring the permanent magnetic generator’s air clearance; Replacing the permanent
magnetic (2)Inspection and cleaning the permanent magnetic generator,bearing lubrication magnetic generator;
performance;
44
DL/T 838—2003
and the second (2)Inspection,checking and maintenance each kinds instrument and transformer.
(2)Inspection and testing the generatrix and the high voltage insulator
performance;
2)Measuring the machine set each part’s vibration,swing and the temperature;
5)Carry on the phase modulation and the phase advancer running testing;
6)Carry on the efficiency and the water rate testing of the condition machine set;
*9)Carry on the water brake quick-acting gate or the inlet valve testing;
Note:In the table which is not have the * sign is the B class inspection items.
45
DL/T 838—2003
The computer (1)Clean and inspection the work station(server) and its module.If (1)Replacing the landing
(3)Clean and inspection the communication component.If necessary,replacing it; telecommunication cable;
(4)Clean and inspection the power supply and its wiring; (3)Replacing or update the
(5)Clean,inspection and checking the optical fiber and the network cable; network wire;
(6)Clean and inspection the global position system (GPS); (4)Update the data base;
(7)Inspection the network and carry on the main network’s switch testing; (5)Update or renew the
(8)Testing and adjusting the automatic generation control (AGC),automatic application software;
voltage control (AVC) and the automatic frequency control (AFC) function; (6)Updating the operation
(10)Carry on the picture update, improve and perfect; (7)Replacing the industrial
(12)Clean and inspection the industrial computer; (8)Replacing the data back-
(14)Inspection and testing the I/O connection point and the component’s operation (9)Improving the routing
(16)Inspection and testing the automatic measuring components and the actuator;
system inspection;
Note:In the table which is not have the * sign is the B class inspection items.
46
DL/T 838—2003
1、Shell and the (1)Inspection and cleaning the shell and its accessory,eliminate the oil penetration (1)Change the insulating
(2)Inspection and clean the explosion stack,pressure release valve,air relay etc., (2)Replacing or re-welding
(4)Inspection and clean the oil lever indicator device; oil paint;
(5)Carry on the insulating oil’s electric testing and the chemical testing and
2、The iron core (1)For the first time A class inspection of the non-sealing transformer,if you can’t (1)Re-welding the shell;
and the winding use the clean-out cover or open the big cover to checking the inner parts,you must (2)Maintenance or
carry on the suspended core inspection.If you need to use the suspended core or replacing the winding;
not,you must according to the operation,inspection and the tesing result to decide; (3)Dry winding;
(2)After the suspended core,you must inspection the iron core,iron shell’s (4)Maintenance the iron
grounding condition and the core bolt’s insulator,inspection and clean the winding core;
and the winding hold-down gear,pad,lead wire’s each part bolt and the connection (5)The sealing type
(3)Measuring the oil duct clearance and inspection the insulator material’s aging cover;
condition;
3、The cooling (1)Inspection the fan generator and its control loop; (1)Replacing the pump or
system (2)Inspection and maintenance the forced-oil circulating pump,oil flow relay and the generator;
4、Tap-changers Inspection and maintenance the on-load or the no-load tap-changers device Replacing the switch
device’s parts
47
DL/T 838—2003
5、Bushing (1)Inspection and clean all the busing; (1)Replacing the bushing;
(2)Inspection the oil-filled bushing’s insulation oiliness; (2)Disassembly and inspection the bushing;
6、Others (1)Replacing the sealing cushion; Inspection the nitrogen charge protective
discharge testing;
signal loop;
48
DL/T 838—2003
Appendix B
(Informative annex)
Three years ( Year—— Year) Inspection the engineering scrolling programming table
Project Name The former A The Main The Increase The Cost Remark
class importance foundation anticipated the disable demanded (ten
inspection special items and the annual days main thousand
Year Month technology implement equipments yuan)
measure and the spare
parts
1、The main device
2 、 The auxiliary
device
3 、 The production
building
4 、 The
non-production
facility
Note 1:For the most importance special items which is anticipated to carry on the first,second,third years’ A class inspection must fill out in this
table;
Note 2:Increase the disable days column.Only fill out the require increase disable days which is more than the standard items’ days;
Note 3: For the main equipment and the spare parts column,you need need to fill out the equipments and the spare parts which is the big
quantity,hard to order,the long process time and need to order the goods in advance;
49
DL/T 838—2003
Appendix C
(Informative annex)
( ) The annual inspection programming schedule
……
1.The
standard
items
2.The
special
items
……
3 、 The production
construction inspection
4 、 The non-production
device inspection
Total
Note:For the main device’s standard items,you must not fill out the detail inspection contents but fill out the working days and cost.For the main
device’s special items and the auxiliary device’s most importance special items,you must fill out the project,cause,working days,cost and the
main technology measure etc.,item by item.
50
DL/T 838—2003
Appendix D
(Informative annex)
The power generation enterprise ( ) annual inspection programming schedule
Reporting units: Reporting date:
The former inspection class and
The machine name and Capacity This time inspection class and the
the inspection’s completion Remark
the category MW planned completion time
time
Note:The machine set’s category must note whether is the domestic machine or the import machine;For the illustrate about the inspection
schedule arrangement column,you must fill out the causes about why the actual disable days are super or lower than the standard items’
disable days;
51
DL/T 838—2003
Appendix E
(Informative annex)
The inspection package file’s main contents
The name of the power generation The machine set’s inspection package files list Edition: Total Page
enterprise
No. Name Content Remark
1 Inspection working order (1)The inspection plan; Plus or minus some items are
(2)The working permit; according to the
(3)The device’s test running plan after the inspection; requirements
(4)Disclosure before the inspection (Device status,the former
working experience,the main deficiency before the
inspection,the special items’ safety technology measure);
2 Inspection prepare (1)The require drawing and the info for the device
inspection ;
(2)The main spare parts and the material list; (3)Prepare the
tooling (The special tool,the general tool,testing
instruments,measuring instruments etc.,);
3 Inspection the working (1)The working is allowed or not;
procedure and the process (2)The site preparation;
(3)Disassembly,inspection and rework procedure and the
process standards;
(4)Arrange the inspection record;
(5) Self-check;
(6) Finish the work;
4 The working procedure’s According to the actual
amend record condition
5 The quality visa The quality control point visa,Third class acceptance
6 The non-conformance
dispose list
7 The device’s running list The test running procedure and the measure
(Informative annex)
The generator set A/B class inspection whole set’s management procedure figure
52
DL/T 838—2003
The Draw up the network
performa power graph,inspection the files
nce genera
testing tion
and the enterp Draw up the special safety
rise technology measure The If Prepar The Apply Appro Begin Inspec
technolog
make month necess e the tec for the ve the the tion
y judge
Inspec The The next The the ly ary inspec hni machi machi inspec the
tion former year next plan.A Training before the inspec adjust tion cal ne set ne tion safety
the inspec annual year nd If inspection.Inspection the files tion the work dis inspec set’s meetin measu
proced tion plan inspec necess plan networ overall clo tion inspec g re and
ure plan tion ary,rep k sur tion worki
Balance the labour.Finish to figure e time ng
plan plan Make ort it
perpare the working
sure the
specify
inspectio
n items Inpection the spare part and the
goods arrival condition and
acceptance
Cold and The Repay Performa Hot and Put forward the inspection Finish Revise Examine Issue the
static whole set servic nce the summarize report to the the the and approve execute
evaluate test e testing dynamic competent department machi inspectio the manage of the
running and evaluate ne n manage program and manage
arrange set’s program the package procedur
the inspec and the files e and
Collect the machine set’s
inspectio inspection info to archive tion package files
n info files
53
DL/T 838—2003
Appendix G
(Informative annex)
A/B class inspection cold,hot status evaluate and the main device’s inspection summary
report
G.1 A/B class inspection cold and the hot status’ evaluate report
__________Year__________Month__________Day
Total________Days.
Total________Days.
2、Labor
3、Inspection cost
From the end of the former A/B class inspection to the beginning of the this time’s A/B class inspection,the
From the end of the former A/B class inspection to the beginning of the this time’s A/B class inspection,the C/D
From the end of the former A/B class inspection to the beginning of the this time’s A/B class inspection,the
coefficient is _________.Thereinto,the forced inactive time is __________hours, the equivalent forced inactive
coefficient is__________.
From the end of the former A/B class inspection to the beginning of the this time’s A/B class inspection,the
54
DL/T 838—2003
6、The main device’s hot status evaluate and the inspection programming estimate
55
DL/T 838—2003
__________Year__________Month__________Day
Manufacturer__________, Type__________
The rating evaporating capacity__________t/h, The superheat steam pressure_________Mpa, The superheat
steam temperature_________℃
total is _______days.
(2)Labor
(3)Inspection cost
(4)Running condition
From the end of the former inspection to the beginning of this time inspection,the running hours is _________,
Technology
Standard Special The adding The reduction
Content Total improvement Remark
items items projects projects
items
Planning
number
Actual
number
56
DL/T 838—2003
Non- Three
H point W point conformance Class
Content advice note accptance
Total Qualified Unqualified Total Qualified Unqualified Total
Planning
number
Actual
number
(7)The main running technology index before and after the inspection
10 Clinker combustible %
57
DL/T 838—2003
__________________________________________
58
DL/T 838—2003
__________Year__________Month__________Day
The inlet steam temperature__________℃, adjust the steam extraction pressure__________Kpa (Gauge
total is _______days.
(2)Labor
(3)Inspection cost
(4)Running condition
From the end of the former inspection to the beginning of this time inspection,the running hours is _________,
59
DL/T 838—2003
Technology
Standard Special The adding The reduction
Content Total improvement Remark
items items projects projects
items
Planning
number
Actual
number
Non- Three
H point W point conformance Class
Content advice note accptance
Total Qualified Unqualified Total Qualified Unqualified Total
Planning
number
Actual
number
(7)The main running technology index before and after the inspection
3
The upper guide pad ℃
The lower guide pad ℃
The water guide pad
℃
(Oil lubrication)
The stator winding’s Max.
℃
temperature.
The speed governing system
4 The residue unbalancedness %
The Max. dead area %
60
DL/T 838—2003
______________________________________________
61
DL/T 838—2003
__________Year__________Month__________Day
total is _______days.
(2)Labor
(3)Inspection cost
(4)Running condition
From the end of the former inspection to the beginning of this time inspection,the running hours is _________,
62
DL/T 838—2003
Technology
Standard Special The adding The reduction
Content Total improvement Remark
items items projects projects
items
Planning
number
Actual
number
Non- Three
H point W point conformance Class
Content advice note accptance
Total Qualified Unqualified Total Qualified Unqualified Total
Planning
number
Actual
number
______________________________________
______________________________________________
63
DL/T 838—2003
G.7 The power generator set control system’s A/B class inspection summary report
________Year________Month________Day
The manufacturer______
The steam turbine control______,The feed pump steam turbine’s control type______,The boiler’s control
total is _______days.
(2)Labor
(3)Inspection cost
(4)Running condition
From the end of the former inspection to the beginning of this time inspection,the running hours is _________,
64
DL/T 838—2003
Technology
Standard Special The adding The reduction
Content Total improvement Remark
items items projects projects
items
Planning
number
Actual
number
Non- Three
H point W point conformance Class
Content advice note accptance
Total Qualified Unqualified Total Qualified Unqualified Total
Planning
number
Actual
number
______________________________________________
65
DL/T 838—2003
G.8 The water-turbine generator set control system’s A/B class inspection summary report
The vibrate swing’s online monitor system______ Manufacturer______The operation date ______
The air gap’s online monitor system______ Manufacturer______The operation date ______
The main oiled chromatogram’s online monitor system______ Manufacturer______The operation date ______
The main change discharge’s online monitor system______ Manufacturer______The operation date ______
The main change cooling and the control system______ Manufacturer______The operation date ______
The main change automatic fire-extinguishing system______ Manufacturer______The operation date ______
1、Labor
66
DL/T 838—2003
67
DL/T 838—2003
Appendix H
(Informative annex)
A/B class inspection technology files’ referrence table
H1.1 The statement of the inspection planning and the annual inspection plan
H1.2 Inspection programming plan (Make sure the standard items and the special items)
H1.3 The machine set’s inspection whole set’s management working plan (Or the machine set’s inspection
quality manual)
H1.5 The inspection item schedule and the network figure (Compare the planning to the actual)
H1.13 Inspection the items’ performance appraisal rules (inspection management,quality, civilizer production
etc.,appraisal performance methods)
H1.15 The quality acceptance request note,receiving note and the advice note etc.
H1.17 The inspection procedure card (operation card ),the operation procedure.
H1.21 The out sourcing project’s safety,quality,technology agreement and the contract
H1.24 The work ticket’s transact regulation when the machine set is stop.
68
DL/T 838—2003
H1.25 Use the any kinds spot table to record the inspection
H1.26 The machine set’s safety economic technology index
H2.1 The inspection item schedule (Compare the planning to the actual)
H2.2 The significant special item’s technology measures and the construction summary
H2.3 Change the system and the device configuration’s design info and drawing
H2.5 The inspection technology record and the technology experience summary
H2.8 The power generator sets’ thermal efficiency testing report before and after the inspection
H2.9 Steam (water) turbine’s speed regulate system performance testing report before and after the inspection
H2.12 The inspection and testing report of the each kinds technology monitor
H2.13 The electric ,the thermal instrument and the automatic device’s regulation testing record
H2.17 Each specialty’s inspection report (Before the cold status acceptance)
69