A. INTRODUCTION
1.PURPOSE
2.METHODOLOGY
B.DESIGN ANALYSIS
1. BEAM TO BEAM CONNECTION
Page 2 of 3
CORRIDOR PLATFORM
A. INTRODUCTION
1. PURPOSE:
The document deals with the Connection design for CORRIDOR Platform
2. METHODOLOGY:
Steel Support with concrete base by using connection details are attached.
B. CONNECTIONS
1. BEAM TO BEAM CONNECTION:
Axial Force – 25% of member capacity
Shear Force – 75% of member capacity
Moment – 25% of member capacity
Page 3 of 3
FIN PLATE CONNECTION DESIGN
Designed By: GS Job No: HYD-111
Checked: KN Contract: HYD-111
Conn.No R1 Rev: 0
Date: 11/18/2023 Code: IS 800-2007
LOADS
Supporting Member SHS 90 X 90 X 5
Incoming Beam ISMB200
Axial Force Fx = 0 kN
Vertical Shear Force V = 253.7325 kN
CALCULATION
Incoming Beam ISMB200
Grade of Incoming Beam E350
Fy 350 N/mm2
Fu 490 N/mm2
FIN PLATE
Thickness of Fin Plate tp= 16 mm
Fin Plate Grade E350
Bolt Diameter (d) = 24 mm
Bolt Grade (IS1367) 10.9
Fy 940 N/mm2
Fu 1040 N/mm2
Shear Capacity of Bolt (Cl.10.3.3, IS 800-2007)
169.41 kN
Vdsb=((Fu/sqrt(3)*(n*0.78*Anb))/gmb)
LOADS
Supporting Member WPB 800 X 300 X 171.51
Incoming Beam ISMB200
Axial Force Fx = 0 kN
Vertical Shear Force V = 253.7325 kN
CALCULATION
Incoming Beam ISMB200
Grade of Incoming Beam E350
Fy 350 N/mm2
Fu 490 N/mm2
FIN PLATE
Thickness of Fin Plate tp= 16 mm
Fin Plate Grade E350
Bolt Diameter (d) = 24 mm
Bolt Grade (IS1367) 10.9
Fy 940 N/mm2
Fu 1040 N/mm2
Shear Capacity of Bolt (Cl.10.3.3, IS 800-2007)
169.41 kN
Vdsb=((Fu/sqrt(3)*(n*0.78*Anb))/gmb)
Key Plan:
STATUS:
Shop Drawing
E E E E
CLIENT:
E
P
P
E
E
MASTER PLAN CONSULTANT:
kN kN kNm mm mm mm mm mm mm mm mm
HYD111
R2 ISMB200 800X300X171.51WPB 245 253.735 18.55 24 2 1 70 0 50 50 16 10 6
TITLE:
ROMP 08 CORRIDOR SUPPORT
1:1 HYD111-URC-05-XX-SD-S-XXXX 00