Date / Time of incident - - Time: ST ( UT) Ship's position: - N/S - E/W Section II - 【Weather and Sea Conditions】 Wind direction / Force: / Weather: Tidal stream: Tide: Ebb / Flood Visibility: Swell: Section III - 【Immediate Response of OOW】 1. Switch to hand steering □ 2. Report to Master Time: 3. Inform C/E and D/Eng. Time: 4. Change engine control position to ECR / machine side as deemed Time: necessary 5. Display & sound NUC lights / shapes / signal □ 6. Modify AIS status □ Section IV - 【Navigation & Maneuvering】 1. Calculate set and drift of the vessel □ 2. Check circumstances of surrounding and risk of collision Y/N 3. Check for any nav. dangers / shallow patches etc. in the vicinity Y/N 4. Maneuver away from coast, traffic and navigational hazards □ 5. Place extra lookout(s) □ 6. In order to avoid an immediate danger, consider bypassing the safety and □ protection devices of M/E Section V - 【Reporting to Applicable Parties】 1. Transmit appropriate DSC alert / message Time: 2. Report to company’s 24 hours emergency contact number Time: 3. Report to VTIS / MRCC / local coastguard (As applicable) Time: Section VI - 【Stand-by Anchor Station】 1. S/B anchors: Depth: 2. Payout appropriate lengths of anchor chain (If applicable) □ Section VII - 【Assessing Situation in E/R】 1. Grasp breakdown / damage □ 2. Check cause of failure □ 3. Check for availability of M/E / evaluate if repairs can be done by crew □ 4. Evaluate time of recovery: Day and Time: 5. Completion of repair: Day and Time: Section VIII - 【Shore Assistance】 1. Arrange shore repair contractor Y/N 2. Arrange spare parts required Y/N 3. Request towing boat Y/N 4. Salvage required? ->Make request for salvage in consultation with company Y/N Main Engine Failure Checklist Page 2 of 2
Section IX - 【Hazardous Cargo Monitoring – Applicable vessels】
1. Check for other abnormalities in cargo machinery □ 2. Monitor hazardous gases by gas detector □ 3. Monitor cargo tank pressure □ Section X - 【After M/E is restored】 1. Cancel navigational warning broadcast □ 2. Change AIS status and remove NUC signals □ 3. Inform all parties concerned □ Section XI -【Preparation of Records and Documents】 1. Save S-VDR / VDR data □ 2. Prepare appropriate report as per company advise □ 3. Entries in log book as applicable □