old p&id TUV Done & Remarks
old p&id TUV Done & Remarks
Thinning Sugg
Eqp ID Eqp Name Insp Date VENDER Min Max
Insp Eff
Page 1
Report
Page 2
Report
Page 3
Report
Page 4
Report
Corr
Coated Service Start Evaluation
Process Unit Chemical Allowance
(y/n) Date Date
(mm)
INLET RECIEVERS & FREE WATER KOD Water Y 1.59 1/1/2007 7/1/2013
Page 5
Report
Page 6
Report
Quality of Last
Insulated Insulation Lining Lining Date Installed Corrosion
Future Evaluation Date Last Insulated Date Initial Coated
(y/n) Condition Material Type (Un-Insulated) Type
Coating Date
10/5/2019 N None Good 1/1/2007 Generalized
Page 7
Report
Page 8
Report
Thinn
ing
Sugg
Corr Rate-Expert Corr Rate-Measured Thinning Sugg Thinning Sugg
Degradation MECH Insp Insp Max Des PrMax DesTeOp Pres (kPa (g))
(mm/Yr) (mm/Yr) InspDate Insp Eff
Plan
C02 Corrosion/ MIC 0.484 7/1/2013 Highly UT105 Criter
N 1172 260 900
ia Met
Page 9
Report
Page 10
Report
Page 11
Report
Page 12
Report
Area
FLOW SPLITTER
Page 13
Report
Page 14