PROJ.OP1.00 Project Operations - Project Creation 750
PROJ.OP1.00 Project Operations - Project Creation 750
00
Project Creation
Table of Contents
1. - PROJ.OP1.00 Project Operations - Project Creation 750 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1. - About this guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2. - Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3. - Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4. - PROJ.OP1.15.00 Scenario and exercises . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5. - PROJ.OP1.20.00 Structure of Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.5.1. - Project Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.5.2. - Cost Category Budgets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.5.3. - Budget Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.6. - PROJ.OP1.30.00 Project Basic Processing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.6.1. - Basic Processing Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.7. - PROJ.OP1.40.00 Project Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.8. - PROJ.OP1.50.00 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.9. - PROJ.OP1.60.00 Create a Quotation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.9.1. - PROJ.OP1.60.10 Enter Project Header Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.10. - PROJ.OP1.70.00 Create a Cost Breakdown Structure (CBS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1.10.1. - CBS example data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1.10.2. - PROJ.OP1.70.10 CBS Creation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1.10.2.1. - Create a CBS header record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1.10.2.2. - Recalculate the CBS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
1.10.2.3. - PROJ.OP1.70.15 CBS screen modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
1.10.3. - PROJ.OP1.70.20 Adjust the CBS line totals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
1.10.4. - PROJ.OP1.70.30 CBS Colour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
1.10.5. - PROJ.OP1.70.40 Making changes to the CBS lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
1.10.5.1. - Correct the CBS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
1.10.5.2. - Increase the sequence number of a CBS element . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
1.10.5.3. - Resequence the CBS sequence numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
1.10.6. - PROJ.OP1.70.50 Update Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
1.10.7. - PROJ.OP1.70.60 Other CBS functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
1.10.7.1. - PROJ.OP1.70.61 Detail materials using Budget Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
1.10.7.2. - PROJ.OP1.70.62 Adjust CBS total contract value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
1.10.7.3. - PROJ.OP1.70.63 Consolidating parent and child projects with CBS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
1.10.7.4. - PROJ.OP1.70.64 Import CBS from Microsoft Excel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
1.11. - PROJ.OP1.80.00 Print a quote . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
1.12. - PROJ.OP1.90.00 Set Status of a Quotation to In Progress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
1.12.1. - PROJ.OP1.90.10 Set Status of a Quotation to Lost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
1.13. - PROJ.OP1.100.00 Maintaining Budgets without a Cost Breakdown Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
1.13.1. - PROJ.OP1.100.10 Enter Budget Details without CBS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
1.13.1.1. - Enter Budget Category Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
1.13.2. - PROJ.OP1.100.20 Change Budget Amounts without CBS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
1.14. - PROJ.OP1.110.00 Create a Proforma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
1.14.1. - Maintain a Proforma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
PROJ.OP1.00 Project Operations - Project Creation 750
Creating a new project/quotation, including entering and maintaining the project budget
Cost Breakdown Structure
Creating a proforma to automate the process of project creation.
Overview
Upon completion of this guide, you will become familiar with:
Prerequisites
In this guide, it is assumed that:
The various scenarios and examples throughout this guide have been established to demonstrate realistic processing requirements
and to reflect the data set up in the Pronto Xi training data set.
For all of the steps and tasks shown throughout this guide, where the user is required to enter data, these are all based on the fictitious
Fred Kirks Enterprises requirements, which is expanded throughout the various sections of the guide. You will need to set up your data
based on your business needs.
Project Header
Cost Category Budgets
Budget Detail
These components record information about the project which can vary depending on the project type. Below is a summary of the three
components.
Project Header
Project ID - You may accept the next number generated or enter an ID manually
Project description - A short description of the project
Status - Determines when transactions can be posted the project
Branch code - Forms part of user security
Project manager - Can be reported against
Client - Linked to the Accounts Receivable module
Site details - Can be the delivery address on purchase orders
Type - 16 different types
Project type/nature/market/work - User definable tables
Tender Details, Guarantee Details, Retention's and Liquidated Damages information
Budget Detail
Information about:
Purchases
Work Orders
Stock Issues, etc.
Record labour against the details together with project notes.
The amount of information you draw from these components can vary greatly. For example, you do not have to use Budget Detail if
you do not want to have all the required materials, labour, purchasing, etc, stored in the project. You need to decide before you
start the project what each field and component means to you and its use for extracting information or grouping of projects. Your
Pronto XiSoftware consultant will be able to assist you in this planning.
Enter the basic project details on the project header. The initial status of the project will be Quotation.
Select the appropriate cost categories that are to apply to this project. Cost categories are a breakdown of the cost activities
associated with the project. All postings made to the project must specify the cost category to which they relate.
Enter the budgets for each category, or the stock/special items required for that category.
Print a copy of the quotation and submit to the client.
To begin processing, set the project status to In Progress and start entering the transactions relating to the various cost categories.
3.Process Transactions
Transactions can be posted to the project by specifying the correct project ID and the relevant category.
Typical transactions are purchase orders, supplier invoices, stock issues, employee timesheets, etc.
The frequency and methods of invoicing depends on the selected project type, for example, Time and Materials, Contract,
Warranty, Asset Creation.
Depending on the project type, in some cases the costs will only be recorded and the client will not be invoiced. In other cases there
will be regular progress claims made against the client.
If required, profit can be recognised and taken up during the life of a project using the progressive profit takeup function.
Once all costs have been recorded and the client invoiced, the 'close out' function is used to finalise the project, take up the
remainder of the profit and complete the final General Ledger postings.
Type Description
C – Contract Used when there is a fixed price for the work and budget changes require formal notification; that is, variations
Budgets are optional
If this is no budget, then a contract value must be entered.
Once the project is at a status of In Progress, the original budget cannot be changed.
Contract values can be changed by entering a variation
Progress invoices can be raised against an invoice schedule or the total contract value.
T - Time and Also known as "Do and Charge" where the amount invoiced is based on work performed to date.
Materials Budgets are not required
Major function flags settings determine the level of information printed on the invoice. This can be overridden
when the invoice is created.
Invoice charge out values are calculated by:
Stock user pricing matrix
Purchase orders cost plus cost category mark up rate
Labour charge out rate as defined in the timesheet flags
If no price set, project will use cost plus mark up percent rate.
If no markup set, project will use cost plus On Cost percent rate
A - Asset Used for the creation of assets. Profit take up and invoicing is not available.
Creation Asset is created after the project is completed
All costs posted to nominated G/L account – usually an asset acquisition account – regardless of the cost
category used
Fixed asset created from the job defaults acquisition and book value from the project costs.
F - Fast Direct This project type can be used to create a project and sales order at the same time. The Fast Direct Invoice
Invoice Project uses the 'P/Group to Project Categories – VJ' code table to create cost categories based on the item
group.
After the project is set to 'In Progress' the sales order is raised and the project can be invoiced in a single
processing step.
G - General Used to ensure costs go to the correct expense area. Profit take up and invoicing is not available.
Ledger Cost For internal project use
Posts costs directly to the General Ledge
Cost categories are matched to the last characters of the specified General Ledger account code. For example:
Project G/L code: 12345678
Category: WXYZ
Will post to: 1234WXYZ
J – Plant Created via the Plant Maintenance module – refer to the Plant Maintenance guide for more information
Maintenance
W – Warranty Costs are posted to a supplier recovery account in the General Ledger
Usually a sub-project created against the parent
Items are returned under warranty.
Customer account code is not required on the header screen
Average costs recalculated for warehouse on close out
PROJ.OP1.50.00 Scenario
In this guide we will take you through the creation of a project quotation. Your company Fred Kirks Construction has been asked to quote
for the construction of the reception and staff cafe in the East Building. The customer is ACME Building Group.
Scenario
In this section we will create a quotation project:
Each project begins as a quotation or estimate. Most of the details about the project can be entered at this stage. In particular, all cost
categories can be assigned and the budgets can be created for these cost categories. When entering the new quotation / estimate, the
following can be done:
Setup
This status allows cost entry and posting but disallows invoice entry. Profit takeup is also allowed.
In Progress
Sets the project to In Progress and checks whether to create required purchase orders, work orders, material requisitions, tasks and
project sheets. For M (Manufactured) type projects, the Raise Manufacturing Work Orders check box will be automatically set to Y.
In order to use the Standard Print option, there must be a jobcardprt program in the $CUS directory.
Lost Project
When a quotation is lost, the lost reason code is stored in the job-notes table with a type of L (Lost) and a sequence of 0 (Zero)
In this section we will firstly create a quotation, which will then be set to In Progress when the quotation is accepted.
Entering a new project using the Create Project/Quotation (PROJ M145) function, involves the following steps:
Steps
1 Select Project > Create Project/Quotation > Create Project/Quotation (PROJ M145).
The first screen of information to be completed is shown above. Once the project ID has been allocated this cannot be changed.
Pronto Xi will recognise this as the quotation ID and when the project status is changed to In Progress the same ID is used.
Project Depending on the setting of the Pad Project Code major function flag, there are three possible ways to
allocate a project ID:
Leave the field blank and a unique ID number will automatically be allocated.
Enter a 1 or 2 character prefix and a unique ID number for that prefix will automatically be appended to
the prefix.
Manually enter a project ID.
For this training leave the field blank to accept the next project number.
Project This is a brief description of the project. This is also used as the project description when printing project
Description reports.
Type in a description for your project. For this training our project will be called East Building.
Proforma Depending on the setting of the Proforma Used major function flag, the status of this field can either be Not
Used, Mandatory or only used sometimes. If a Proforma is required, press F2 (Lookup Help) for a list of
proformas and select accordingly (proformas are discussed later in this document).
Parent Is the link to the parent project, if the project hierarchy structure is to be used. If not, this field will default to
the ID of the current project.
Leave blank.
Type This field allows the user to select from a list of predefined project types. Each of these project types exhibit
different behavioural properties; for example, how the transactions are posted to the General Ledger. Project
types are described in the PROJ.OP1.40.00 Project Types section of this guide.
Type N.
Manager This field will automatically default to the user ID name. It can be overridden if the new value is in the JO –
Project Manager table. The project manger must have sufficient security as defined in the JO table to move
the project passed quote status.
Customer The customer the project work is for, linked to the Accounts Receivable module. When the customer code is
entered the invoice address for that customer will default as the project address. This can be accepted or a
different site address entered. This can then be used as the delivery address on purchase orders and sales
orders.
Type or select ACMEBG - Acme Building Group.
Item Code The item code is informational except for M (manufactured) and R (rework) type projects where it is
compulsory.
Leave blank.
Rep This will default to the rep code of the customer account but can be overridden at the time of entry.
Project This is a user definable field and is table driven (JP code table). Used for splitting certain postings to the
Type General Ledger and also for reporting purposes.
Select a type from the JP table.
Nature A user-definable field used for reporting purposes (JW code table).
Select a type from the JW table.
Market A user-definable field used for reporting purposes (JV code table).
Select a type from the JV table.
Work A user-definable field used for reporting purposes (JA code table).
Select a type from the JA table.
Tax These fields require a Y/N response. The tax exempt field is used to eliminate tax being posted to a project.
Exempt / The tax field allows an entry of 1,2,3,4 as the tax rate to use for non stock items. This field is not applicable in
Duty Australian and New Zealand GST environments.
Exempt
Customer Is the customer reference (for example, order number) and can be used when creating sales orders against
Reference the project.
Approve Is the date the quotation is approved. This is a date field and is not mandatory. Used for reporting purposes.
Date Leave blank.
Budget This is the date the budget was entered against the project. It is not mandatory.
Date Accept the default date.
Start Date The date the project is scheduled to commence work. Used for reporting and can also be used when
scheduling tasks against the project.
Accept the default date.
Ex-Factory Both are user definable date fields and can be used for reporting purposes.
/ On Site Leave blank.
Finish Date This date can be entered when the project is created but Pronto Xi will override this date when the project is
completed. Used for reporting on completion dates.
Leave blank.
On Cost % The percentage for on costs can be entered at the header screen or can be overridden in the budget entry
screen. This field is only applicable if using Time and Material type invoicing.
Leave blank.
4 We will create the budgets later, using the Cost Breakdown Structure.
Press Esc to leave the budgets screen.
6 This menu allows further quotation details to be entered, if required. The available options are:
Add Tender Allows the entry of tender information about the current project. Such as the originator, contact name and
Details phone number, contract numbers etc
Task This will link to the scheduling of the project and allows the entry of any personnel and/or equipment
/Resources required for the project.
Invoice Allows the entry of an invoicing schedule if progress invoicing will be used for this project.
Schedule
Project Setup Sets the project to a status of 'Set Up'. This will allow the entry of costs while still being able to adjust any
/Maintenance budget details depending on project type.
Sub Project Will automatically create a sub project that is linked back to the parent - the original information from the
Creation main project is copied to the sub project. All cost categories can be automatically generated when creating
the sub project.
Add Notes Allows the entry of project notes. A number of different types of notes are available including notes which
will print on invoices.
In Progress Sets the project status to In Progress at which time the original budget is 'locked'. If the project is a
contract type project changes to the budget will no longer be allowed. Instead a variation must be
processed.
Make In Changes the status to In Progress and allows the entry of a progress invoice using one of the invoicing
Progress and methods.
Invoice
Print Prints the estimate for this project using the details entered for this project or for a range of projects.
Quotation
Copy Project Copies the original project to a new project without creating a link.
Continue Completes the current entry of the quotation leaving this project at a status of Quotation. Further
Quote Entry quotations can then be entered.
Finish Quote Finish the entry of the current project leaving it at a status of Quotation.
Entry
Select Finish Quote Entry to leave the project at a status of Quotation.
7 When viewed through Project Maintenance, your project will look like the following.
The CBS has been designed so that the hierarchy can be defined up to 10 levels. Costs always roll up
from the lowest level to the highest level of the CBS.
If you want the CBS to have a grand total, you must enter the elements in a hierarchical format.
1.1.2.1 Kitchen Cabinets MJNR EACH 2 $6850.25 1 $13700.50 12.5% $1712.56 $15413.06
1.2.1.1 Power Cabling MELE PCE 1800 $4.25 1 $7650.00 30% $2295.00 $9945.00
1.2.1.2 Test and Tag LOHS HRS 40 $3500.00 1 $3480.00 25% $870.00 $4350.00
This chapter describes the most commonly used method, which is to create a CBS when creating a new project using the Create Project
/Quotation (PROJ M145) function. It also includes information on how you can make changes to the CBS once it has been created, and
advice on importing data into the CBS from an external source.
The CBS has been designed so that the hierarchy can be defined up to 10 levels. Costs always roll up from the lowest level to the highest
level (level 1) of the CBS and level 1 will always be the total of all the costs below that level. Therefore, if you want the CBS to have a grand
total, you must enter the hierarchy elements with a sequence number starting with 1.
Steps
The Cost Breakdown Structure screen is displayed. This screen allows you to create a hierarchical tree structure with costs allocated to each
project milestone.
4 Click Entry.
You do not need to enter a Cost Category for this entry because it is the top level and the overall description of the cost structure. All
costs will roll up to this level.
The cursor will now be returned to the Sequence field on the next line.
You do not need to enter a Cost Category for this entry because it is the second level and description of the cost structure. Costs at
this level will roll up to here.
The cursor will now be returned to the Sequence field on the next line.
You do not need to enter a Cost Category for this entry because it is the second level and description of the cost structure. Costs at
this level will roll up to here.
The cursor will now be returned to the Sequence field on the next line.
12 Enter the Sequence 1.1.1.1 and the description Counter and Signage.
Sequence Description Cost UOM Qty Hours Unit Cost Cost Total Markup
Category Per Cost
Sequence Description Cost UOM Qty Hours Unit Cost Cost Total Markup
Category Per Cost
1 East Building
1.1 Joinery
1.1.1 Joinery
- Reception
1.1.2 Joinery -
Staff Cafe
16 No values are stored against the Total Cost and Contract Value cells at this time.
To populate these values the CBS must be recalculated.
Steps
The following modes are available on the Cost Breakdown Structure screen:
Mode Description
Correct Correct the values in the selected row. This mode is not available if your project is a contract type and the status is In
Progress.
Recalculate Update the subtotals of all levels of the CBS after changes have been made.
This is required in order to keep the values up-to-date as the subtotals are not dynamically updated.
UpdateBudget Update the cost category budget amounts in the Cost Category Budgets screen
with the totals of all the cost categories in the Cost Breakdown Structure screen, and remove any cost categories
that do not have transactions.
Once the budgets have been updated from the CBS, you can no longer update the budget in the Cost Category
Budgets screen.
Profit (type A) and Income (type I) cost categories are not removed from the Cost Category Budgets
screen by the CBS.
If all lines are removed for a cost category in the CBS and the project is not at a status of In Progress, the cost
category is removed from the Cost Category Budgets screen. If the project is at a status of In Progress, the cost
category details are removed unless there is a transactions against it.
This mode is not available when the Cost Breakdown Structure screen is opened from the Maintain
/Create Tenders (TEND M001)function, as there is no budget to update.
Markup Apply a markup percentage or markup amount to the selected cost categories.
This will update the CBS levels with the markup applied.
On the Markup screen, the following fields are displayed:
Total Contract Value - Enter the contract value and calculate the markup
(common) for all cost categories in the CBS.
Total Budgeted Cost - Shows the total budgeted cost in the CBS. This value is
used as the weighting when distributing the new total markup value or new total contract value.
Total Markup Amount - Enter the markup amount and calculate the markup for
all cost categories in the CBS. Negative markup values can be entered in this field.
Cost Category - Enter the cost category. You can leave this field blank to select all cost categories in the CBS.
Percentage Markup - Enter the percentage markup to apply.
If the Markup mode is used in the Cost Breakdown Structure screen and the Update Budget mode has been
selected, the Markup mode in the Cost Category Budgets screen is not available. You can only enter
markup in one of these screens, not both. However, the clibcbs-public-check-if-markup-allowed public
procedure can be used to override this, if required. Contact your local Pronto Support Centre for
assistance or to obtain the Software Development Kit (SDK) for customising Pronto Xi.
Sequencing Resequencing
Resequence all of the elements of the CBS into the required sequence order.
On the Resequence Start Sequence screen, enter the new starting sequence number for the CBS. For example, you
might have set up the CBS and with some gaps in the sequence order. This function will resequence all lines,
closing any of the gaps in the sequencing.
It does not matter which row is selected. All rows will be resequenced using this function.
This can be used in conjunction with the Resequence mode to organise the CBS hierarchy into the required
sequence order.
For more information, see Increase the sequence number of a CBS element.
Allocation Change the cost allocation flag for the selected row in the CBS between Pending, Open or
Closed. This drives whether costs areautomatically posted to this line of the CBS.
For more information, see Allocating costs to the CBS.
Variation
Cleanup This mode is only available when the Cost Breakdown Structure screen is accessed from the Variation
Details for Project screen.
UpdateCosts Change the cost of the selected CBS element without affecting the contract value. This mode is available when
a cost category isassigned to a sequence.
You can change the quantity, hours, unit cost and cost per values. The total cost, percentage markup and markup
values are updated accordingly. This would be required in situations where the cost increases but you cannot
increase the contract value.
For example, if you increased the cost by $10.00 and the original Cost + Markup is $150.00, the total cost goes from
$150.00 to $160.00, the Markup is - $10.00 and the Cost + Markup stays as $150.00 therefore not affecting the
contract value.
Notes Enter notes at each level of the CBS hierarchy. An asterisk is displayed in the
Notes column when a note has been entered for that CBSlevel.
Make sure to contact the subcontractor once flooring is complete.
When the Cost Breakdown Structure screen is opened from an enquiry screen (for example, View
/Enquire by Project (PROJ E008)), only the Notes and Audit modes are available.
BudgetDetail Update the budget details for the selected row. When exiting this screen, you are
prompted to update the total cost assigned to that line ofthe CBS.
If you do not update the CBS cost, there might be a discrepancy between
the CBS costs an the sum of the budget details.
For more information, see Detail materials using Budget Details (bottom up estimation).
Claim Schedule
Copy the CBS to the claim schedule.
On the Copy to Claim Schedule screen, enter the required level to copy. All elements of the CBS hierarchy up to,
and including, the entered level are copied to the claim schedule.
For more information, see Copying a CBS to a claim schedule.
Audit
View the audit log of changes that have been made to the current record.
The Audit Log screen shows the table in which the change occurred, project, key value, action (update, insert or
delete), audit date and time, field name, field title, old value, new value, login ID of the user who made the
change, program, parameters and the composite key.
The Find mode is available on this screen. Use the Drillback mode to open the screen that
contains the changed data for the selected row.
When the Cost Breakdown Structure screen is opened from an enquiry screen (for example, View/Enquire by
Project (PROJ E008)), only the Notes and Audit modes are available.
Scenario
Your CEO has informed you to budget for a profit of at least 30% for labour components and 40% for all materials. You also have the
right to budget each cost category differently, as required.
Steps
2 Highlight sequence 1.1.1.1 (Counter and Signage) with a Cost Category of MJNR.
3 Click Markup.
The Markup screen is displayed.
The Total Contract Value, Total Budgeted Cost, and Total Markup Amount fields display the values relating to the sum of
all CBS lines on your project. They are not based on the Cost Category field displayed at the bottom of the screen.
5 Click OK.
This will adjust all CBS lines for this category to 40%.
6 Repeat above steps for category MELE (40%) and LJNR and LOHS (30%).
7 Recalculate the CBS to update the Total Cost and Contract Value fields.
For ease of viewing the row colours on the CBS can be changed. The instructions below will show you how.
Steps
4 Select Entry.
Enter 1 and Tab to the Background Colour column.
6 Using the mouse to move the sliders or the round marker, select a background colour for level 1.
7 Click OK.
There are three methods for making changes to the CBS on the Cost Breakdown Structure screen, and there are subtle differences in each
method.
This section explains how the following modes work on the Cost Breakdown Structure screen and how you can use them to make
corrections to your CBS:
Sequence
Description
Cost Category
Cost Allocation UOM
Quantity
Hours
Unit Cost
Cost Per
Percentage Markup
Markup Value
If you are working on a type C (Contract) project, the actions of the correct mode will be disabled once the project reaches a
status of In Progress.
Scenario
In the screens below we will:
Steps
2 Highlight the sequence that contains the tables and click Correct.
3 Tab to the Qty field and type 6. Tab to the end of the line, ensuring 40% remains in the Markup field.
4 Repeat for the Hours field for the Labour (Joinery) line. Type 60 into the Hours field, tabbing to the end of the line, ensuring that
30% remains in the Markup field.
5 Click Recalculate to update the Total Cost and Contract Value Fields.
Scenario
You present the quote to the Acme Building Group, but are informed that they would also would like you to include a quote for some
windows. You will be required to insert this new section before the section for Other Services.
In our training scenario, we need to add another section 1.2 called windows.
First resequence the current line 1.2 to 1.3
Then add a line for the windows at 1.2.
Steps
4 This will increase the sequence number in the selected row to 1.3. All sequence numbers at that level or below in the CBS
hierarchy are updated accordingly.
Now there is a gap in the sequence numbers that allows you to enter a new element into the CBS hierarchy for sequence number
1.2.
Sequence Description Cost UOM Qty Hours Unit Cost Total Markup Markup
Category Cost Per Cost Value
1.2 Windows
1.2.1 Aluminuim
Resequence Example 1
If you have a sequence 1 and you wish to put sequences above it, you would use Resequence.
Select Sequencing/Resequence.
The CBS sequence now begins with 5 and it is possible to add sequences 1,2,3 and 4 above it.
Resequence Example 2
If you have been adding and deleting lines and the sequences are out of order, the Resequence mode can be used to recreate order.
Here a line has been deleted.
Resequence level 1
When a Cost Breakdown Structure exists for a project, it takes precedence over the budgets defined on the Cost Category Budgets screen. If
you have updated the budget screen, all subsequent changes must be done on the Cost Breakdown Structure screen. Update budget can
be processed any time the CBS is changed.
The CBS overwrites the existing budget and removes any cost categories, except type I (Income) and A (Profit) cost categories that
do not have transactions.
If a CBS exists for a project, only type A (Profit) and I (Income) cost categories can be added or removed from the Cost Category
Budgets screen. These cost categories are not costs and cannot be generated from the CBS, therefore, they can
be maintained on this screen.
Scenario
You are now happy with your Cost Breakdown Structure and can copy it into the project's Cost Category Budgets screen.
Steps
3 Click OK.
4 Press Esc to leave the CBS screen and return to the Project header screen.
Click Budget.
Examples of these functions are included in the following screens but are not a part of the main scenario for this training.
Detailing materials estimation is when you first detail all the elements (budget details) required for each sequence of your CBS and then
update the totals on each sequence respectively based on those budget details. This would normally be done when you have an accurate
understanding of the details that will be used during the estimation process.
You might also first estimate the total budget, then enter each budget detail line and finally update the total value on the header based on
the sum of the lines.
You can create purchase order/material requisitions from these details which will automatically be linked to that section of the CBS.
Scenario
You will detail all joinery materials directly against the CBS sequence for timber.
Steps
7 Click Entry.
15 Click OK.
A warning message is displayed if you attempt to add more costs in this screen than the total for the cost category in the CBS. OK
on this message. When the detail has been entered it will be possible to update the CBS totals for that sequence line.
19 Esc back to the CBS and check totals for the sequence line and CBS.
You can modify the total contract value, however, the resulting Percentage Markup figure is applied to all CBS lines for the cost category.
Steps
3 Click Markup.
The Markup screen is displayed.
5 Click OK.
Scroll to the right and view the new contact value.
View the markup and other figures and note the changes.
It is possible to use a CBS to link relationships from grandparent, parent and child projects. In the CBS consolidated view,
the relationship will show the projects by sequence level. For example, if the parent project's CBS starts with sequence 1 and the
child's starts with sequence 2 then in the consolidated CBS the parent will be displayed first. If the child's CBS starts with sequence 2 and
the parent's starts with sequence 1, then the child will be first in the CBS.
If both the parent and child projects use exactly the same sequence number, the parent sequence and detail will be used. It will consolidate
based on sequence number, cost category, cost and percentage markup.
Multiple level child projects can be created. In this instance, all child projects are rolled up when the consolidated parent CBS option is
used.
If you do not want to consolidate, ensure that all projects are set up with different sequences, such as parent project 1.1.1.2 and a
child project 1.2.1.2.
the following two examples show the effect of having (1) parent and child CBS with consecutive sequence numbers and (2) the same
sequence numbers, (3) consecutive sequence numbers within the sequences .
The following is an example of where parent and child have consecutive CBS sequences.
2 This is the CBS of the parent project. The sequences start with 1.
4 This is the CBS of the parent project. The sequences start with 2.
5 To view the consolidated CBS with parent and child projects, select the parent project in the Project Maintenance screen and click
Cost Breakdown > Consolidated Parent CBS.
6 The Consolidated Parent Cost Breakdown Structure is displayed. If you scroll down you can see that the sequences numbered 1
are followed by the sequences numbered 2.
The following is an example of where parent and child have the same CBS sequences.
5 To view the consolidated CBS with parent and child projects, select the parent project in the Project Maintenance screen and click
Cost Breakdown > Consolidated Parent CBS.
6 The resultant CBS shows each sequence only once but the values assigned to each are the sum of the values assigned against the
two different projects.
The following is an example of where parent and child have the consecutive numbers within the sequences.
5 To view the consolidated CBS with parent and child projects, select the parent project in the Project Maintenance screen and click
Cost Breakdown > Consolidated Parent CBS.
6 As you can see, the parent and child sequences dovetail within the consolidated CBS.
If you have data from an external source, such as a Microsoft Excel spreadsheet, you can import this data to create the CBS. A spreadsheet
has been attached to this section (online training) to assist you. This spreadsheet can be downloaded to your PC.
The copy and paste import option from Microsoft Excel is a fast entry method and replicates the data that would normally
be entered manually in the Cost Breakdown Structure screen. However, there are some rules for each type of element in the CBS hierarchy
and not each row requires the same entries, for example, in a header row or a detail row.
To successfully import your external data, you need to sort the spreadsheet into two elements and paste them into the Cost Breakdown
Structure screen separately. These are:
Headers
Levels with Qty or Hrs
Type Sequence Description Cost UOM Qty Hours Unit Cost Cost % Markup Markup
Category Per Value
Header 1 Building
The Type Header (light blue) and Type Hours/Qty (green) sections should be copied separately.
Only the highlighted cells should be copied (as these match the cursor stops in Pronto Xi).
The columns Cost and Total Cost have been removed because the cursor does not stop in these fields.
Only the contract value is printed for the CBS, not the cost.
Steps
1 Select Project > Maintenance Menu > Quotation Maintenance (PROJ M048).
The Project Quotation Maintenance screen is displayed.
3 Click Menu.
The Quotation Conclusion Options screen is displayed.
9 Click OK.
An XML view of the CBS is generated.
If a quotation is accepted by the client, the status of the quotation can then be changed to In Progress so that transactions can be recorded
against it. Once the status is changed, the options to raise purchase orders, work orders and stock issues from the details is presented to
you.
Steps
1 Select Project > Maintenance Menu > Project Maintenance (PROJ M117).
3 Click Activities.
5 The following options are available, for example you may wish to now raise work orders or purchase orders, or issue stock at this
stage.
6 At this stage, leave the boxes unchecked as we will action orders individually.
Click OK.
If a quotation has been unsuccessful, it is possible to set the quote to Lost, enter the reason why the quotation was unsuccessful, and store
that information for reporting purposes.
Steps
1 Select Project > Maintenance Menu > Project Maintenance (PROJ M117).
Date Lost - Enter the date the quotation was lost (the value defaults to today's date)
Reason Code - Specify the reason the quotation was unsuccessful by selecting an entry from the 'JL' code table.
Awarded To - If the quotation was awarded to the opposition, details can be entered here.
Amount - The amount the quotation was awarded to the opposition company.
6 After completing the fields, click OK then press Esc to close the dialog box.
The status of the quotation is now changed to Lost, and no further details can be entered against it.
A 'lost' project cannot be recalled. However, the Project Copy function (PROJ.M012) can be used to create an identical
project with identical budgets and a new quotation or project number.
It is possible to create and maintain budgets without the use of the Cost Breakdown Structure. The two sections below detail how this is
performed.
During project creation, after completing the header details, the Cost Category Budgets screen is displayed.
The control of which budget fields can be entered may be different depending on the setting of the 'Budget Detail Format' major function
flag.
Steps
Cost Enter the cost category code to which the budget figure relates.
Category While you may enter an income category, budget figures are notational only and will not be used in calculating
a contract value. Contract value can be created in one of three ways;
Budget Enter the budget amount for this cost category. If this is left as zero, Pronto Xi assumes you are using the
Amount Category Details functionality – refer to the next section. The categories can be set up with no values, that is,
solely to store transaction amounts during the life of the project. Categories which hold profit takeup amounts
are an example of this.
Hrs The hours against the project are informational and can be used when forecasting quantity hours against the
Budget project. They can also be used for analysis of budgeted hours against actual hours from timesheets.
Qty Used to enter the quantity produced based on the hours entered. Useful if managing production control.
Produced
Mark-Up This is a percentage markup against the entered budget amount and is used when invoicing the project using a
% time and materials method as well as to calculate the contract value for a contract type project.
Mark-Up This is the dollar value markup against the entered budget amount. Note that both percentage and value are
populated by entering an amount in either field. The last field entered overrides any previous entries.
Total This is automatically populated when the budget amount and the markup amounts have been entered.
2 Continue creating records in this data grid until the budget figures for all cost categories have been entered.
If a zero budget amount has been entered, the budget details screen will automatically be opened.
Once a budget value has been entered against a cost category, select the details mode from the Cost Category Budget screen which
will allow the entry of the budget details.
The category details entered are automatically totalled to give the cost category budget figure. This would override the original entered
costs category budget (if entered). The budget details that can be entered include stock issues to the project, purchases from suppliers, and
work orders for manufacturing, if required. These particular issues will create an entry in the transactions once they have been updated.
Once a detailed budget has been entered against a cost category, you can no longer maintain the budget at the cost category level unless
the details are first removed.
Steps
1 Enter '0' in the Budget Amount field on the Cost Category Budgets screen.
Once the record has been completed, the following screen is displayed:
Seq. The sequence number can be used to define the position number on any purchase orders that are to be raised.
Issue Allows you to enter a code A to Z or 0 to 9 to stagger the issue of items. By using this code you can control the
flow of material for when they are needed. For example, if you have A in some and B in others, when Pronto Xi is
creating the various orders you will be allow to choose the sequence, and if you choose A then only lines with A
will have orders created.
Type This type code will determine what is issued, bought or made for the project. Options are:
(S)pecial - allows the entry of supplier details which can then create a purchase order (once the project is
set to a status of 'In Progress')
(N)ote – budget notes, does not add to budget value
(L)abour – links to employee master, can assign an employee to the project budget with the corresponding
costs and hours.
(R)esource - a project resource
(M)ake - links to manufacturing module to create a work order for the item to be made for the project
(A)sset – links to the fixed asset module. Assign an asset to work on the project and a rate. Rate defaults to
current written down value of the asset.
Blank = Stock item - stock to be issued to the project.
Whse The warehouse for the order creation (for example if a Sales Order or Material Req this is the warehouse from
which the item is taken)
Details Enter the details for the particular type of entry. For a stock item enter the item code here. For a special item
enter a short description. For a labour type, enter the employee code or name.
Qty Enter the quantity of the goods (or hours) required to be issued to the project or purchased from the supplier.
UOM This will default to the unit of measure that is stored against the item code. If 'S' is selected then manual entry is
required.
Rate Enter the unit rate of the goods. If an item code was entered, this will automatically default to the cost of the
item as defined by your inventory costing method. Can be overridden if required. Labour rates need to be
manually entered.
Per Enter the quantity the rate is relevant to. This will then create the extended value of the budget.
Action Delivery, Expected or Scheduled date. This date will automatically be entered as the delivery date on any
Date purchase orders raised from this project.
Receive If purchase order - are the items to be received directly to site or into the warehouse.
to Site
3 Continue creating records in this data grid until all the budget details for the relevant cost category have been entered. The
details are rolled up to a total figure for that cost category.
Entering details will only create the budget for the category the details are entered against.
The simplest method a varying a project value is to edit the current budget using the Correct mode on the Project Maintenance screen. This
method however has limitations on the type of project which can be changed. For example, a budget cannot be changed by the
maintenance screen if the project is a 'C' (Contract) type, but it can be changed if it is an 'N' (Normal) type. Also, using this method to
change the budget does not create an audit trail of the changes and traceability of when and why the budget was changed.
Steps
2 Click Budget.
Budget values shown on the header screen will automatically include changes that have been made to the budgets on the cost category
lines.
The purpose of a proforma is to create a preset set of values that automates the process of creating a project. A proforma allows the user to
create a new project and select a pre-set list of values that will automatically insert text into the relevant fields. For example, you can create
default values in the project header for different types of projects. By using proformas, you can take the guesswork out of creating a project
and eliminate user error.
1. Set answers
2. Ask questions at project creation
Set answers will default values to the selected fields. Examples of this include;
Project type
User defined field values
Cost categories
Questions allow the user to enter a yes / no answer. Based on the response, a further set of options can be displayed. For example, you can
ask whether the project is a contract project and if the response is yes, present a different set of default options than if the answer had been
no.
Steps
1 Select Project > Create Project/Quotation > Proforma Maintenance (PROJ M045).
The Proforma Maintenance screen is displayed. All existing proformas, with their code and description, are listed in a data grid.
3 Enter a code for the proforma, a brief description of the proforma, then press Esc to exit entry mode.
Seq The line sequence number is important when entering proforma lines because it can be used as a target
destination for branching logic when entering a question type line.
Estimate Free form text up to 30 characters and is relevant to the line type.
Text
Type Specifies the type of action to be performed at this step in the proforma:
B = BOM allows the user to look at the inventory for any manufactured items that have a BOM setup.
C = Create a particular cost category, for example labour, material, income, etc, on the project.
D = Item code can be selected from a table held in the proforma and then allows the user to enter a qty and
price. When the project is created this item is then added to the budget details.
F = Free form text . When used, user will be prompted for budget detail information to be entered in free
form.
G = Group repeat allows a particular group within the proforma to be repeated.
GI = Product Group Inclusion allows the selection of a particular product group.
GX = Product Group Exclusion allows to exclude a particular product group.
H = Hide any notes from the user that have been entered on the Proforma.
HC = Help on categories allows the user to set up a list of suggested cost categories which the user can
then choose to select.
HI = Help on items allows the creation of a sub list of stock items. When assigning budget details on the
project, users can then select stock items from this sub list.
I = % Markup will set a markup rate against the category selected within the proforma and the start and
end fields then become mandatory.
J = Links other projects to the proforma. This allows the user to budget based on the contract value of
another project.
JH = Project Header details for certain fields can be entered as defaults on the header when creating a new
project. A further screen format is displayed where F2 function key gives a list of the field that can be
selected.
L = Labour % is reported on only.
M = Materials % is reported on only.
N = Print notes entered on the proforma.
O = Optional items can be entered on the proforma and can be raised against a purchase order once
selected.
P = Amount contains % is similar to the I type where it relates to a particular sequence number.
Q = Questions can be entered that require a Y or N answer. With a YES then skip to a nominated line
number in the proforma.
S = Subtotal will subtotal the proforma up to a certain point for reporting.
T = Totals the proforma to a certain point for reporting.
V = Value can be entered in either quantities or $ and is used to build the budget details.
Z = Percentage overhead can be entered against a sequence number and is for reporting only.
Value Used for particular action type codes and allows the user to enter a value for a percentage markup.
Category Enter the category type on the project that the particular line entry relates to.
Cat Is relevant to BOM or Materials only or can be left blank. If left blank it will assume the default category type for
materials.
Show Prints the line entry if this field is set to 'P'. This field also can be set to only ask the question be entering 'A' and
will not print or 'B' it can be set to do both functions.
Start The start and end codes relate to the sequence numbers within the proforma details. This is used when certain
/End parts of the proforma need to be skipped over to a certain area of the details. This will be mandatory
Action depending on the category type entered.
Maintain a Proforma
To correct a record in the proforma, select the [Correct] mode.
Answers View the answers that have been set against the line type. This is specific to the particular line entry.