PROGRESS 12-07-24
PROGRESS 12-07-24
PROGRESS 12-07-24
A Details of Highway
Length/
S.No. Description Unit
Number
a) Excavator nos. 13
b) Dumper nos. 42
c) Roller nos. 9
d) Grader nos. 8
4 Work Progress
B Details of Structure
1 ROB nos. 2 0
2 Major Bridge nos. 6 0
3 Minor Bridge nos. 10 0
4 SVUP nos. 7 1
5 Fly over nos. 2 0
6 Sub Way nos. 1 0
7 LVUP nos. 15 1
8 Interchange nos. 3 0
9 Culverts nos. 102 18
10 AUP nos. 23 0
11 TOLL PLAZA nos. 3 0