Polygon 6 RA - waterproof
Polygon 6 RA - waterproof
Polygon 6 RA - waterproof
i) Method Statement
Marking and setting out for Ensure all position and level are checked by
2 N.a.
waterproofing contractor Site Engineer, Spic and COW
Patching with grouting to uneven Ensure no extra mixing grouting cement and
4 Contamination of water
surface. don't dispose extra grouting to the floor waste.
7 Water pounding test N.A Ensure COW must be witness for testing.
RISK ASSESSMENT FORM
Company Polygon Construction & Interior Pte Ltd Jackie Lai
Conducted By
Assisstant Project Manager
Process/Location Suntec City Reail Tower #01-179
(Name/Designation/Date) 17-Aug-2009
Ricky Yap Last Review Date -
Approved By
Senior Project Manager
Next Review Date -
(Name/Designation/Date) 17-Aug-2009
Submission and Approval Rail Ensure shop drawing & location are to
1 N.A. N.A. NA NA NA NA NA NA
and Consultants be approved and confirmed
Likelihood
Remote (R) Occasional (O) Frequent (F)
Severity
Major (Ma) M H H H : High Risk
Moderate (Mo) L M H M : Medium Risk
Minor (Mi) L L M L : Low Risk
er
3d.
Action
Officer
Project
Manager
Project
engineer
Site
supervisor
Site
supervisor
Site
supervisor,
waterproof
specialist
er
3d.
Action
Officer
Site
supervisor
Site
supervisor
igh Risk
Medium Risk
ow Risk