i) Method Statement
Submission and Approval Rail, Ensure shop drawing & location are to be
1 N.A.
SMRT and Consultants approved and confirmed
Marking and setting out of Ensure all position and level are checked
2 temporary prop position as per N.a. by contractor Engineer,site supervisor and
PE instruction COW
Marking and setting out of Ensure all position and level are
Engineer ,
2 temporary prop position as per N.a. N.a. checked by contractor Engineer,site NA NA NA NA NA NA
COW
PE instruction supervisor and COW
Ensure scaffolder
who have
Installation of scaffoldind and Ensure All material are to be good Site
3 Falling objects Falling objects Mi R L certificate erect the NA NA
g.i pipe for temporary proping condition supervisor
temporary scaffold
prop
Ensure barricade
Ensure nobody is to be taking out
Maintain the standard of the temporary prop Site
4 Falling objects Falling objects any cross brace,g.i pipes and loosen Mi R L NA NA
scaffolding prop area with safety supervisor
the base jacks and 'U' jacks
barricade.
Likelihood
Remote (R) Occasional (O) Frequent (F)
Severity
Major (Ma) M H H H : High Risk
Moderate (Mo) L M H M : Medium Risk
RISK ASSESSMENT FORM - 2
Company Polygon Construction & Interior Pte Ltd Jackie Lai
Conducted By
Assisstant Project Manager
Process/Location Eunos Industrial Estate
(Name/Designation/Date)
Ricky Yap Last Review Date -
Approved By
Senior Project Manager
Next Review Date -
(Name/Designation/Date)