Professional Documents
Culture Documents
5. SAPEX_User Manual_ Template Sample
5. SAPEX_User Manual_ Template Sample
5. SAPEX_User Manual_ Template Sample
PROJECT IDENTIFICATION
PROJECT IDENTIFICATION
Project Name Module
Standard Arabia Inspection Co. Ltd-
MM – Material Management
S/4-HANA 2024 Implementation
Customer Name Customer Number
Standard Arabia Inspection Co. Ltd
Delmon Project Manager STANDARD ARABIA INSPECTION CO. LTD Project Manager
Balaji Baskaran Bhoj Raja
DOCUMENT IDENTIFICATION
Author Document Location (repository/path/name)
Dinesh
Version Status Date (DD-MM-YYYY) Document Classification
1.0 Draft 17-04-2024 Internal
REVISION HISTORY
Version Date (DD-MM-YYYY) Description Reviewed by Date (DD-MM-YYYY)
1.0
DOCUMENT APPROVAL
Suresh Procurement
PREFACE
The objective of this User Manual is to describe the contents of the SAP ERP Best Practice
Solution with special emphasis on Standard Arabia Inspection Co. Ltd Business and
Management requirements finalized and thus document will be guide for all the business
user going further.
CONFIDENTIALITY
This document is the property of Delmon and Standard Arabia Inspection Co. Ltd, who own
the copyright thereof. The information in this document is given in confidence and without
the written consent of Delmon and Standard Arabia Inspection Co. Ltd, given by contract or
otherwise, this document must not be copied, reprinted republished, uploaded, posted,
distributed, or reproduced in any material form, either wholly or in part. Also, the contents
of this document or any methods or techniques available there from, must not be modified
or used to create derivative works for third party, public or private or commercial use,
without prior written permission.
3
STANDARD ARABIA_HCM_TM_SDD
4
STANDARD ARABIA_HCM_TM_SDD
TABLE OF CONTENTS
SAP MM – Procurement of Material................................................................................................... 3
Procurement of Material having following Steps:.............................................................................3
Purchase Requisition Process:.......................................................................................................... 3
Create Purchase Requisition: -...........................................................................................................4
5
STANDARD ARABIA_HCM_TM_SDD
3) Purchase Requisition
4) Purchase Order (Material)
5) Purchase Order (Service)
6) Goods Receipt
7) Goods Issue
8) Service Entry Sheet
6
STANDARD ARABIA_HCM_TM_SDD
SAP Menu Path Logistics => Materials Management => Purchasing => Purchasing Requisition
=> Create
SAP T-code ME51N
Step Action
Step Action
Step Action
(1) Purchase Requisition Doc. Type: Select PR Doctype
(2) Material, Qty, Del.Date, Plant, S location: Input the data.
7
STANDARD ARABIA_HCM_TM_SDD
Note: -
Step Action
(1) Click Check
No message issued during check
(2) Click Save