Lean-to Slab
1 Bottom Bars X-axis Φ10 200 38 1 5669 215.422 129 5412 129
i Bottom Bars Y-axis Φ10 200 28 1 7619 213.332 129 7362 129
ii Top Dist. Bars X-axis Φ10 200 38 1 1939 73.676 129 1810
iii Top Dist. Bars X-axis Φ10 150 50 1 1939 96.942 129 1810
iv Top Dist. Bars Y-axis Φ10 200 28 1 2589 72.487 129 2460
Roof Beams a c
b
X-Axis, 1B-1; 5250mm
1 Top & Bottom Main Bars Φ20 - 6 2 6114 73.368 390 5334 390
i Rings at Support 1200mm Φ10 100 25 2 1546 77.300 524 174 524 174 150
ii Rings at Mid 200mm Φ10 200 10 1 1546 15.460 524 174 524 174 150
iii Rings at Mid 200mm Φ10 200 12 1 1546 18.552 524 174 524 174 150
2 Top & Bottom Main Bars Φ20 - 6 2 8064 96.768 390 7284 390
i Top Extra Bars at Support L/3 Φ20 - 2 4 2818 22.544 390 2428
ii Bottom Ext Bar At Support L/3 Φ16 - 2 4 2818 22.544 390 2428
iii Rings at Supports 1200mm Φ10 100 25 2 1546 77.300 524 174 524 174 150
iv Rings at mid 200mm Φ10 200 22 2 1546 68.024 524 174 524 174 150
Note: Check BBS from concerned site inspector before starting the activity.
Total Length (m) 256.6 0.0 22.5 192.7 0.0
Column C-2
Column C-3
Column C-2
1 Ring 4 Φ12 100 52 1 1846 95.531 524 324 524 324 150
i Ring 5 Φ12 100 52 1 1187 61.444 195 324 195 324 150
ii Ring 6 Φ12 100 52 1 1454 75.245 128 524 128 524 150
Column C-3
2 Ring 1 Φ12 100 52 3 1846 286.592 524 324 524 324 150
i Ring 2 Φ12 100 52 3 1362 211.451 282 324 282 324 150
Column C-1
i Ring 3 Φ12 100 54 3 1096 177.552 324 149 324 149 150
Column C-4
i Ring 4 Φ12 100 54 8 1096 473.472 324 149 324 149 150
ii Ring 5 Φ12 100 54 8 804 347.328 178 149 178 149 150
Column C-5
i Ring 3 Φ12 100 54 1 1096 59.184 324 149 324 149 150
ii Ring 4 Φ12 100 54 1 696 37.584 124 149 124 149 150
Note: Check No of Rings of each Column tie by RECO from
Total length (m) 0.000 1,095.120 0.000 0.000 0.000
concerned site inspector.
Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853
Sign Site inspector:_______________________
Total Weight (kg) 0.00 972.47 0.00 0.00 0.00
Coping Beam
Horizontal X-Axis
Rings along x-axis Φ10 150 274 1 746 746 204.404 149 149 149 149 150 40924
Rings along x-axis Φ10 150 245 1 746 746 182.770 149 149 149 149 150 36608
Rings along y-axis Φ10 150 36 1 746 746 26.856 149 149 149 149 150 5324
Vertical Y-Axis
Rings along y-axis Φ10 150 74 1 746 746 55.204 149 149 149 149 150 10924
Rings along y-axis Φ10 150 74 1 746 746 55.204 149 149 149 149 150 10924
Rings along y-axis Φ10 150 49 1 746 746 36.554 149 149 149 149 150 7248
Total Length (m) 561 705 0 0 0 Note: Check BBS from concerned site inspector before starting the activity.
Upto Plinth - -
RCC Walls - 0
Floor Slab - -