BCF Torkham Construction of Border Crossing Facilities, Torkham Riaz-ud-din Engineering (Pvt) Ltd.

Close Examination Area 1.5TSF (Export Yard)


Bar Bending Schedule of Coping Beam
Sub Contractor: M/s RECO BBS No. 01 Date: 15-01-2022
Cut Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description Length Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Coping Beam

Horizontal X-Axis

Top & Bottom Main Bars


1 Φ12 - 6 2 36452 437.424 144 36164 144 Add 2 nos of laps @ 60dia
(Grid A & E - 1 to 6)

Rings along x-axis Φ10 150 229 2 746 341.668 149 149 149 149 150 34244

Vertical Y-Axis

Top & Bottom Main Bars


2 Φ12 - 6 2 23932 287.184 144 23644 144 Add 1 nos of laps @ 60dia
(Grid A & E - 1 to 6)

3 Rings along x-axis Φ10 150 149 2 746 222.308 149 149 149 149 150 22204

Note: Check BBS from concerned site inspector before starting the activity.
Total Length (m) 564.0 724.6 0.0 0.0 0.0

Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853


Sign Site inspector:_______________________
Total Weight (kg) 347 643 0 0 0

Grand Total (kg) 991 Comments:________________________________________________________


__________________________________________________________________
Grand Total (Tons) 0.991 ______________________________________________

M/s RECO _______________ Page1 of 9 CMC/NLC _______________


BCF Torkham Construction of Border Crossing Facilities, Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Close Examination Area 1.5TSF (Export Yard)
Bar Bending Schedule of Plinth Beam
Sub Contractor: M/s RECO BBS No. 01 Date: 27-01-2022
Cut Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description Length Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Plinth Beam

Horizontal X-Axis

Top & Bottom Main Bars


1 Φ16 - 6 3 37360 672.480 358 36644 358 Add 2 nos of laps @ 60dia
(Grid A & E - 1 to 9)
Top & Bottom Main Bars
2 Φ16 - 6 3 7090 127.620 358 6374 358
(Grid A-B & D - 6 to 7) Short Beams

3 Ext Bars at Support L/3 Φ16 - 1 3 2670 8.010 358 2312

4 Rings along x-axis Φ10 100 308 2 1546 952.336 524 174 524 174 150 30673

Vertical Y-Axis

Top & Bottom Main Bars


5 Φ16 - 6 1 24670 148.020 393 23884 393 Add 2 nos of laps @ 60dia
(Grid 6- A to E)

6 At mid (Grid 6, A-B) Φ16 - 1 1 3447 3.447 3447

7 At mid (Grid 6, B-D) Φ16 - 1 1 3850 3.850 3850

8 At mid (Grid 6, C-E) Φ16 - 1 1 3308 3308

Top & Bottom Main Bars


9 Φ16 - 6 1 24670 148.020 393 23884 393 Add 1 nos of laps @ 60dia
(Grid 1- A to E)
Top & Bottom Main Bars
10 Φ16 - 6 1 16270 97.620 393 15484 393 Add 1 nos of laps @ 60dia
(Grid 7- A to D)

11 At mid (Grid 7, A-B) L/3 Φ16 - 1 1 2955 2.955 393 2562

12 At mid (Grid 7, B-D) L/3 Φ16 - 1 1 3900 3.900 3900

13 At mid (Grid 7, C-E) L/3 Φ16 - 1 1 1855 1.855 1462 393

14 Rings along y-axis Φ10 100 525 1 1546 811.650 524 174 524 174 150 52447

Note: Check BBS from concerned site inspector before starting the activity.
Total Length (m) 1,764.0 0.0 1,217.8 0.0 0.0

Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853


Sign Site inspector:_______________________
Total Weight (kg) 1,087 0 1,922 0 0

Grand Total (kg) 3,008 Comments:________________________________________________________


__________________________________________________________________
Grand Total (Tons) 3.008 ______________________________________________

M/s RECO _______________ Page2 of 9 CMC/NLC _______________


BCF - Torkham Riaz-ud-din Engineering
Construction of Border Crossing Facilities, Torkham
Close Examination Area (Export Yard)
Bar Bending Schedule of Lean to Slab
Sub Contractor: M/s RECO Date: 17-01-2022
Length of Total Length (mm) Bar Dimensions
Bar Spacing No. of No. of
Ser Description each bar Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Lean to Slab

1 Bottom Bars X-axis A'-B' Φ10 175 46 1 6652 305.992 120 6412 120

2 Bottom Bars Y-axis A' - B' Φ10 175 38 1 8001 304.038 120 7881

3 Bottom Bars X-axis B'-D Φ10 175 46 1 6652 305.992 120 6412 120

4 Bottom Bars Y-axis B' - D Φ10 175 38 1 8121 308.598 120 7881 120

5 Curtailed Bars X - Axis L/3 Edges Φ10 200 74 2 2257 334.085 120 2137

6 Curtailed Bars X - Axis At Mid Φ10 100 22 1 4683

7 Curtailed Bars Y - Axis Edges Φ10 200 12 2 14682 352.368 120 14562

Note: Check BBS from concerned site inspector before


Total length (m) 1,911.073 0.000 0.000 0.000 0.000
starting the activity.
Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853
Sign Site Inspector:_________________________
Total Weight (kg) 1177.22 0.00 0.00 0.00 0.00

Grand Total (kg) 1177 Comments:____________________________________________


_____________________________________________________
Grand Total (Tons) 1.177 _______________________________________________

M/s RECO_________________ Page3 of 9 CMC/NLC________________


BCF Torkham Construction of Border Crossing Facilities, Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Close Examination Area (Export Yard)
Bar Bending Schedule of Roof Beams & Lean To Slab
Sub Contractor: M/s RECO BBS No. 01 Date: 15-01-2022
Cut Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description Length Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Roof Beams

Horizontal X-Axis

Top & Bottom Main Bars


1 Φ16 - 3 3 7160 64.440 393 6374 393
(Grid A-B & D - 6 to 7) Short Beams
Top & Bottom Main Bars
Φ20 - 3 3 7160 64.440 393 6374 393
(Grid A-B & D - 6 to 7) Short Beams

Top Ext Bar At Support Φ20 - 4 3 2705 32.460 393 2312

Bottom Straight Bar Φ20 - 1 3 5250 15.750 5250

Rings at Support 1200mm Φ10 100 25 3 1546 115.950 524 174 524 174 150 5250

Rings at Mid 200mm Φ10 200 15 3 1546 69.570 524 174 524 174 150

Vertical Y-Axis

Top Main Bars


3 Φ16 - 3 2 17230 103.380 393 16444 393 Add 2 nos of laps @ 60dia
(Grid 6 & 7- B' to D)
Bottom Main Bars
4 Φ20 - 3 2 15580 93.480 393 14794 393
(Grid 6 & 7- B' to D)

5 Top Ext Bar At Support L/3 Φ20 - 4 2 2955 23.640 393 2562

6 At Mid L/3 Φ20 - 2 2 5000 20.000 5000

7 Top Ext Bar At Support L/3 Φ20 - 4 2 2955 23.640 2562 393 Add 1 nos of laps @ 60dia

8 Rings at Supports 1200mm Φ10 100 49 2 1546 151.508 524 174 524 174 150 Add 1 nos of laps @ 60dia

9 Rings at mid 200mm Φ10 200 44 2 1546 136.048 524 174 524 174 150

Note: Check BBS from concerned site inspector before starting the activity.
Total Length (m) 473.1 0.0 167.8 273.4 0.0

Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853


Sign Site inspector:_______________________
Total Weight (kg) 291 0 265 674 0

Grand Total (kg) 1,230 Comments:_________________________________________________________


__________________________________________________________________
Grand Total (Tons) 1.230 _____________________________________________

M/s RECO _______________ Page4 of 9 CMC/NLC _______________


BCF - Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Construction of Border Crossing Facilities, Torkham
Closed Examination Area (Export Yard)
Bar Bending Schedule of Column Rings Only
Sub Contractor: M/s RECO BBS No.1 Date: 11-01-2022
Length of Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description each bar Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Column C-1

i Ring 1 Φ12 100 1 1 2496 2.496 749 424 749 424 150

ii Ring 2 Φ12 100 1 1 1522 1.522 262 424 262 424 150

ii Ring 3 Φ12 100 1 1 1522 1.522 262 424 262 424 150

iv Ring 4 Φ12 100 1 1 1096 1.096 324 149 324 149 150

Column C-2

i Ring 1 Φ12 100 1 1 2246 2.246 724 324 724 324 150

ii Ring 2 Φ12 100 1 1 1297 1.297 250 324 250 324 150

iii Ring 3 Φ12 100 1 1 1297 1.297 250 324 250 324 150

iv Ring 4 Φ12 100 1 1 880 0.880 216 149 216 149 150

v Ring 5 Φ12 100 1 1 880 0.880 216 149 216 149 150

Column C-3

i Ring 1 Φ12 100 1 1 2046 2.046 624 324 624 324 150

ii Ring 2 Φ12 100 1 1 1330 1.330 266 324 266 324 150

iii Ring 3 Φ12 100 1 1 1330 1.330 266 324 266 324 150

iv Ring 4 Φ12 100 1 1 880 0.880 216 149 216 149 150

v Ring 5 Φ12 100 1 1 880 0.880 216 149 216 149 150

Column C-4

i Ring 1 Φ12 100 1 1 1346 1.346 324 274 324 274 150

ii Ring 2 Φ12 100 1 1 914 0.914 108 274 108 274 150

iii Ring 4 - S-Shape Φ12 100 1 1 474 0.474 75 324 75

M/s RECO_________________ Page5 of 9 CMC/NLC________________


BCF - Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Construction of Border Crossing Facilities, Torkham
Closed Examination Area (Export Yard)
Bar Bending Schedule of Column Rings Only
Sub Contractor: M/s RECO BBS No.1 Date: 11-01-2022
Length of Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description each bar Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Column C-5

i Ring 1 Φ12 100 1 1 1796 1.796 474 349 474 349 150

ii Ring 2 Φ12 100 1 1 1322 1.322 237 349 237 349 150

iii Ring 3 Φ12 100 1 1 1331 1.331 116 474 116 474 150

Column C-6

i Ring 1 Φ12 100 1 1 1846 1.846 524 324 524 324 150

ii Ring 2 Φ12 100 1 1 1322 1.322 262 324 262 324 150

iii Ring 3 Φ12 100 1 1 1414 1.414 108 524 108 524 150

Note: Check No of Rings of each Column tie by RECO from


Total length (m) 0.000 31.467 0.000 0.000 0.000
concerned site inspector.
Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853
Sign Site inspector:_______________________
Total Weight (kg) 0.00 27.94 0.00 0.00 0.00

Grand Total (kg) 28 Comments:__________________________________________


___________________________________________________
Grand Total (Tons) 0.028 _________________________________________________

M/s RECO_________________ Page6 of 9 CMC/NLC________________


BCF - Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Construction of Border Crossing Facilities, Torkham
Close Examination Area (Export Yard)
Bar Bending Schedule of Wind Column Rings Only
Sub Contractor: M/s RECO BBS No.1 Date: 03-09-2022
Length of Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description each bar Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Column C-1

i Ring Φ12 100 39 4 1096 170.976 324 149 324 149 150 3775

Column C-2

iii Ring 1 Φ12 100 39 8 880 274.560 216 149 216 149 150 3775

iv Ring 2 Φ12 100 39 8 880 274.560 216 149 216 149 150 3775

Column C-3 4000

vi Ring 1 Φ12 100 39 3 880 102.960 216 149 216 149 150 3775

vii Ring 2 Φ12 100 39 3 880 102.960 216 149 216 149 150 3775
Note: Check No of Rings of each Column tie by RECO from
Total length (m) 0.000 926.016 0.000 0.000 0.000
concerned site inspector.
Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853

Total Weight (kg) 0.00 822.30 0.00 0.00 0.00


Sign Site inspector:_______________________
Grand Total (kg) 822

Grand Total (Tons) 0.822

M/s RECO_________________ Page7 of 9 CMC/NLC________________


BCF - Torkham Riaz-ud-din Engineering (Pvt) Ltd.
Construction of Border Crossing Facilities, Torkham
Close Examination Area (Export Yard)
Bar Bending Schedule of Wind Column
Sub Contractor: M/s RECO BBS No.1 Date: 03-09-2022
Length of Total Length (m) Bar Dimensions (mm)
Bar Spacing No. of No. of
Ser Description each bar Bar Shape Remarks
Size (mm) Bars Units Φ10 Φ12 Φ16 Φ20 Φ25 a b c d e
(mm)

Column C-1, C-2 & C-3

i Vertical Bars Φ16 - 8 15 4112 493.440 3962 150


Note: Check No of Rings of each Column tie by RECO from
Total length (m) 0.000 0.000 493.440 0.000 0.000
concerned site inspector.
Unit Weight (kg/m) 0.616 0.888 1.578 2.466 3.853

Total Weight (kg) 0.00 0.00 778.65 0.00 0.00


Sign Site inspector:_______________________
Grand Total (kg) 779

Grand Total (Tons) 0.779

M/s RECO_________________ Page8 of 9 CMC/NLC________________


Export Yard - Close Examination Area

Length of Bar # (m) Weight


Building name
# 10 # 12 # 16 # 20 # 25 Total (kg)

Upto Plinth 1,764 - 1,218 - - 2,982 3,008

RCC Columns -

RCC Walls - 0

Floor Slab 2,384 - 168 273 - 2,825 2,408

Wind Columns 926 493 1,419 1601

Coping Beam 564 725 - - - 1,289 991

Roof Slab - 0

TOTAL (BAR #) LENGTH (m) = 4,712 1,651 1,879 273 - 8,515 8,008

TOTAL Length (m) = 8,515

Unit Weight of bar 0.616 0.888 1.578 2.466 3.853

Total Weight of bar (kg) 2,903 1,466 2,965 674 - 8,008

TOTAL WEIGHT (kg) = 8,008