SUMMARY OF COST

Name of work: Building First Floor

Disrict Jamshoro.

1 Cost of civil work = 3259331

2 Cost of carriage = #REF!

3 Add Premium on (1)

20% x 3259331 = 651866

4 Difference of cement

#REF! x 205.00 = #REF!

5 Difference of steel

4.79 x 32000.00 = 153331

6 Difference of Wood @ 3600.00 Per Cft ( Only Shutters)

150 x 0.145 x 3600.00 = 78300

7 Cost of water Supply & Saintary.( S.I ) = 124471

8 Add Premium on ( 7 )

20% x 124471 = 24894

= #REF!
9 Contigency

= 15000

10 Electric = 325000

#REF!

Say #REF! (MILLION)


Name of work: Building First Floor
Disrict Jamshoro.

ITEM QTY CEMENT H. SAND Cft SHINGLE STONE STEEL Tiles SAND

1 CC 1:4:8 #REF! #REF! #REF! #REF!

2 CC 1:2:4 259 46 114 228

3 CC 1:3:6 1104 143 508 1015

4 RCC 1:2:4 1533 270 675 1349

5 Fabrication 96 4.79

6 CC Block 2917 473 2047 2595

7 Cement Plaster( 1:6) 1/2" 13509 72 540

8 Cement Plaster( 1:4) 3/8" 13509 77 405

9 Tiles 8751 189 455 36754

10 CC 1:2:4 Topping 2" 5776 173 427 849

11 Sand 22070 22070

TOTAL #REF! #REF! 6036 #REF! 4.79 36754 22070

RATE 61.83 3262.80 3425.60 3490.72 3588.40 3588.40 649.86

TOTAL #REF! #REF! 206783.45 #REF! 17194.18 131888.77 143426.86

TOTAL #REF!
Cartage Material

Name of work: Building First Floor


Disrict Jamshoro.

1 Cement Luky Miles 70


Ist & 2nd 7.53
3rd & Sbsequent Mile 68 0.6 40.80
Kaccha 18 0.75 13.50
= 61.83

2 Hill Sand Nai Baran Miles 60


Ist & 6th 771.96
7th & Sbsequent Mile 54 32.56 1758.24
Kaccha 18 40.7 732.60
= 3262.80

3 Crush/ Shingle B. Crusher Miles 65


Ist & 6th 771.96
7th & Sbsequent Mile 59 32.56 1921.04
Kaccha 18 40.7 732.60
= 3425.60
4 Stone Metal Jhampir Miles 67
Ist & 6th 771.96
7th & Sbsequent Mile 61 32.56 1986.16
Kaccha 18 40.7 732.60
= 3490.72

5 Steel % Cwt Hyderabad Miles 70


Ist & 6th 771.96
7th & Sbsequent Mile 64 32.56 2083.84
Kaccha 18 40.7 732.60
= 3588.40

6 Tiles Hyderabad Miles 70


Ist & 6th 771.96
7th & Sbsequent Mile 64 32.56 2083.84
Kaccha 18 40.7 732.60
3588.40

7 Sand Land Source Miles 6


Ist & 4th 649.86
7th & Sbsequent Mile 0 32.56 0.00
= 649.86
WATER SUPPLY & SANITARY
Name of work: Building First Floor
Disrict Jamshoro.

Description Qunatity Rate Unit Amount

01.Providing & fixing squating type whito Glazed Earthenware W.C Pan with front flush inlot &
complete with including the cost of flushing cisteran with internal fitting and flush pipe with
band and making requisite number of holes in walls, plinth and floor for pipe connections and
making good in cement concrete. 1:2:4 (B)(i) W.C of not less than 19" ckear opening between
flushing rims and three gallons flushing tank with 4" dia C.I trap & C.I thumble (S.I.No.1)(B)/I/.C.I

5 Nos RS 2274.80 Each RS = 11374

02. Providing and fixing 24" x 18" lavatory basin in white glazed earthenware complete with
and including cost of W.I or C.I cantelever (6") built into walls, painted white into 2 coats after
primary coat of red lead paint, a pair of half inch dia chrome plated pillar apes, 1.5" rubber plugs
t and chrome plated brass chain, 1.25" brass waist approved pattern, 1.5" inch dia malloable iron
or C.P brass traps malloble iron or brass unions and making requisite number of holes
in walls, plainth and floor for pipe connection and making good in cement and concrete 1:2:4
(Foreingn or equivalent)(S.I.No.10/C-1).

5 Nos RS 2229.15 Each RS = 11146

03.Add extra labour for providing and fixing earthenware pedestral white or colored glazed
(foreingn or equivalent). (S.I.No.11/c-1).

5 Nos RS 1131.55 Each RS = 5658

04. Providing and fixing Stainless & Steel sink local made complete with C.I or W.I
cantelever (Brackets 6" built into walls, 1.5" rubber plugs and chrome plated brass
chain, 1.5" C.P Brass waste with 1.5" dia PVC waste pipe and making requisite
number of holes in walls, Plainth and floor for pipe connection and making good
in cement concrete 1:2:4 (b) Stainless Steel sink size 36" x 18" (Standard Pattern )
(S.I.No.19(b)/C-1).

5 Nos RS 1561.45 Each RS = 7807

05.Providing and fixing 6" x 2" or 6" x 3" C.I floor trap of the approved self cleaning design with C.I
screwed down gratting with or without vent arm complete with and
including making requisite no of holes in walls, plinth and floor for pipe connections and and making
good in cement concrete 1:2:4 (S.I.No.20/C-1)

5 Nos RS 244.35 Each RS = 1222

06. Providing and fixing in position nylon connections complete with 1/2" dia brass stop cock with
pair of brass nuts and lining joints to nyloon connections S.I.No.23/C-1

5 Nos RS 77.85 Each RS = 389


07.Providing and fixing bathroom accessories set (7 pieces) including tower rod, brush holder,
soap tray and shelf of approved design including cost of screws, nuts etc complete (Master
brand) S.I No.25/C-6

5 Nos RS 2578.20 Each RS = 12891

08.Providing and fixing 4" dia C.I Plain Bend of the required degree including extra painting to
match the color of the building. (S.I.No. 10/C-3)

5 Nos RS 168.40 Each RS = 842

09.Providing G.I Pipes, specials and clamps etc including fixing, cutting and fitting complete with
and including cost of breaking through walls and roof, making good etc. painting 2 coats after
cleaning the pipes etc with white zink paint with pigment to match the colour of the building and
testing with water to pressure head of 200 ft and handling
(i)1/2" dia. (S.I.No.1(i)/C-4)

200 Rft RS 25.20 P.Rft RS = 5040

10.Providing G.I Pipes, specials and clamps etc including fixing, cutting and fitting complete with
and including cost of breaking through walls and roof, making good etc. painting 2 coats after
cleaning the pipes etc with white zink paint with pigment to match the colour of the building and
testing with water to pressure head of 200 ft and handling
(ii)3/4" dia. (S.I.No.1(ii)/C-4)

300 Rft RS 34.40 P.Rft RS = 10320

11. Add extra labour for concealed G.I Pipe and fitting including making recess in the wall
for pipes and making good in cement concrete etc complete.
(i)1/2" dia. (S.I.No.1(i)/C-4)

100 Rft RS 3.60 P.Rft RS = 360

12.Supplying and fixing Long bib Cock of superior quality with C.P head 1/2 dia (S.I.No.159(a)/C-6).

5 Nos RS 211.00 Each RS = 1055

13. Supplying and fixing concealed stop cock of superior quality with C.P head 1/2" dia.
S.I.No.13/(a)/C-6).

5 Nos RS 228.15 Each RS = 1141

14. Supplying and fixing concealed wash basin mixture of superior quality with C.P head 1/2" dia.
S.I.No.16/(a)/C-6).

5 Nos RS 704.00 Each RS = 3520

15. Supplying and fixing jet shower with rod of superior quality with C.P head 1/2" dia.
S.I.No.17/(a)/C-6).
5 Nos RS 295.90 Each RS = 1480

16. Provinding and fixing Handle Valves (China) (ii) 3/4" dia. (S.I.No.7 (ii)/C-6)

5 Nos RS 102.95 Each RS = 515

17 Supplying and fixing Fiber Glass Tank of approved quality and design wall thickness
as specified including cost of nuts. Bolts and fixing in plateform of C.C 1:3:6 and
making connection for inlet, outlet and overflow pipes etc complete (b) 400 gallons
and wall thickness 4.0 mm S.I No. 3(b)/C-8.

1 Nos RS 14485.50 Each RS = 14486

18.Providing R.C.C Pipe with collars class"B" and digging the tranches to required and fixing thickness
in position including cutting, fitting and jointing with maxphalt composition and cement mortar 1:1and
testing with water pressure to a head of 4 ft above the top of the highest pipe and refilling with
excavated stuff ©6" dia. (S.I.No.2©/C-10)

350 P.Rft RS 72.40 P.Rft RS = 25340

19.Providing Asbestoes Pipes with collar (Dedex or equivalent) including digging the trench to
required depth and fixing in position and jointing with rubber rings including testing with water to a
pressure head of 200 ft (b) 4" dia. (S.I.No.3(b)/C-10)

70 Nos RS 62.75 P.Rft RS = 4393

20.Providing and fixing water pumping set 1 H.P 2800 RPM Single phase 220 volts, 1.25"x1" 40 ft
head including base plato and also making C.C 1:3:6 plateform of required size and fixing with nuts
and bolts etc complete in all respects (S.I.No. 11/Sub Head XI Water pumps of Electric S.O.R)

1 Nos RS 5494.50 Each RS = 5495

Total = 124471
unt
ESTIMATION

Name of work: Building First Floor


Disrict Jamshoro.

Description Qunatity Rate Unit Amount

1 Cement concrete plain including placing , compacting finishing and curing complete
( including screening and washing of stone aggrete without shuttering ( F ) Ratio 1:2: 4

Room 1 x 1 x 18.00 x 11.00 x 0.17 = 34


Room 1 x 1 x 18.00 x 16.00 x 0.17 = 49
Bath 1 x 1 x 6.25 x 10.00 x 0.17 = 11
Room 1 x 1 x 11.00 x 10.00 x 0.17 = 19
Room 1 x 1 x 12.00 x 10.00 x 0.17 = 20
Bath 1 x 1 x 6.00 x 4.75 x 0.17 = 5
Kitchen 1 x 1 x 12.00 x 10.00 x 0.17 = 20
Verandah 1 x 1 x 26.00 x 10.00 x 0.17 = 44
Verandah 1 x 1 x 14.75 x 8.00 x 0.17 = 20
Car Poarch Top 1 x 1 x 16.50 x 13.33 x 0.17 = 37
= 259

259 x @ 14429.25 %Cft = 37406

2 Rcc work including all labour and material except the cost of steel reinforcment and its labour for bending
and binding which will be paid seperatively. This rate also includes all kinds of f (including screening and washing of shingle.(a) R.C.C
curing rendering and finishing the exposed surface
work in roof slab,beams, columns,rafts,lintels and other structural members laid in situ or pre cast laid in
position . Complete in all respects.( I ) Ratio 1:2:4 90 lbs.( S.I.No.6 (a) /I /C-4)

Super Floor Column


Gc1 1 x 12 x 1.50 x 0.75 x 10.00 = 135
Gc2 1 x 4 x 0.75 x 0.75 x 10.00 = 23

Lintels
L.walls 1 x 1 x 19.50 x 0.75 x 1.00 = 15
L.walls 1 x 1 x 16.25 x 0.75 x 1.00 = 12
L.walls 1 x 2 x 45.00 x 0.75 x 1.00 = 68
L.walls 1 x 1 x 6.00 x 0.75 x 1.00 = 5
S.walls 1 x 1 x 17.25 x 0.75 x 1.00 = 13
S.walls 1 x 1 x 8.00 x 0.75 x 1.00 = 6
S.walls 1 x 1 x 6.00 x 0.75 x 1.00 = 5
S.walls 1 x 2 x 11.00 x 0.75 x 1.00 = 17
S.walls 1 x 2 x 16.00 x 0.75 x 1.00 = 24
Roof Beam
L.walls 1 x 1 x 19.50 x 0.75 x 2.00 = 29
L.walls 1 x 1 x 16.25 x 0.75 x 2.00 = 24
L.walls 1 x 2 x 45.00 x 0.75 x 2.00 = 135
L.walls 1 x 1 x 6.00 x 0.75 x 2.00 = 9
S.walls 1 x 1 x 17.25 x 0.75 x 2.00 = 26
S.walls 1 x 1 x 8.00 x 0.75 x 2.00 = 12
S.walls 1 x 1 x 6.00 x 0.75 x 2.00 = 9
S.walls 1 x 2 x 11.00 x 0.75 x 2.00 = 33
S.walls 1 x 2 x 16.00 x 0.75 x 2.00 = 48
Slab
1 x 1 x 33.25 x 41.50 x 0.50 = 690
1 x 1 x 17.00 x 23.25 x 0.50 = 198
= 1533

1533 x @ 337.00 P.Cft = 516726

5 fabrication of Miled Steel Reinforcement for Cement Concrete including cutting, bending,
laying in position, making joints and fastly including cost of binding wire (also includes \
removal of rust from bars
Qty same as item no(08)
1 x 1 x 1533 x 7.00 / 112.00 = 96

96 x @ 5001.70 P.Cwt = 479323

6 Supplying and filling sand under floors and plugging in walls.(S.I.NO.29/C-5)

Hall 1 x 1 x 112.00 x 32.00 x 5.00 = 17920


Bath 1 x 5 x 5.00 x 6.00 x 5.00 = 750
Bath corridor 1 x 1 x 26.67 x 5.50 x 5.00 = 733
Passage 1 x 1 x 26.67 x 8.00 x 5.00 = 1067
Stair case 1 x 1 x 26.67 x 12.00 x 5.00 = 1600
= 22070

22070 x @ 203.50 %Cft = 44913

7 Providing and laying 1:3:6 cement concrete solid block masonary wall Above 6" in thickness
set in 1:6 cement sand mortar in ground floor super structure including raking
out joints and curring etc complete.

Long walls Hall 1 x 2 x 114.17 x 0.67 x 10.00 = 1530


Short walls Hall 1 x 2 x 31.17 x 0.67 x 10.00 = 418
L/ w G. Lav/ Passage/ staircase 1 x 4 x 28.83 x 0.67 x 10.00 = 773
S/Wall G. Lav / Passage/ Stair case 1 x 1 x 31.17 x 0.67 x 10.00 = 209
Long walls Bath 1 x 1 x 28.83 x 0.50 x 10.00 = 144
Short walls Bath 1 x 4 x 4.00 x 0.50 x 10.00 = 80
IST STEP 1 x 1 x 14.00 x 6.00 x 0.67 = 56
2nd STEP 1 x 1 x 14.00 x 5.00 x 0.67 = 47
3rd STEP 1 x 1 x 14.00 x 4.00 x 0.67 = 38
4th STEP 1 x 1 x 14.00 x 3.00 x 0.67 = 28
5th STEP 1 x 1 x 14.00 x 2.00 x 0.67 = 19
6th step 1 x 1 x 14.00 x 1.00 x 0.67 = 9
= 3350
DEDUCTION
Door 1 x 1 x 5.00 x 0.67 x 7.00 = 23
Door 1 x 2 x 3.50 x 0.67 x 7.00 = 33
Bath Door 1 x 5 x 2.50 x 0.50 x 7.00 = 44
Window 1 x 16 x 5.00 x 0.67 x 6.00 = 322
Bath Ventilator 1 x 5 x 3.00 x 0.50 x 1.50 = 11
= 433

3350 - 433 = = 2917


Net Quantity

2917 x @ 6189.04 %Cft = 180552

8 First class deodar wood rought, joinry in doors and windows etc fixed in position including chowkats,
hold fasts, hinges, iron tower bolts, chowks, cleates, handles and cords with hookd etc. Deodar panelled
or panelled and glazed or fully glazed, (b) 1.75" thick (S.I.NO.7(b)/C-10).

Main Door 1 x 1 x 1 x 6.00 x 7.00 = 42


Door 1 x 2 x 1 x 6.00 x 7.00 = 84
Bath Door 1 x 5 x 1 x 2.50 x 7.00 = 15
Ventilator 1 x 5 x 1 x 3.00 x 1.50 = 10
= 150

150 x 309.52 P.Sft = 46428

9 Supplying and fixing in postion Aluminum channels framing hinged doors or Alcop made
with 5 mm thick tinted glass glazing Beligum and alpha japan locks I c handels stoppers

Window 1 x 1 x 16 x 5.00 x 6.00 = 480

480 x @ 652.35 %PSft = 313128

###Provinding and fixing iron/ steel grill using solid square bars of size 1/2" x 1/2" placed at 4" center to
center and frame of flat iron 3/4" x 1/4" including circle shape at 1-0 a part equivalent fitted with screws
or pins including painting 3 coats with first coat of red oxide paint etc (S.I.NO.30/C-17).

Windows 1 x 1 x 16 x 5.00 x 6.00 = 480

480 x @ 123.91 P.Sft = 59477

###Galvanized wire guaze fixed to chowkats.

Window 1 x 1 x 16 x 5.00 x 6.00 = 480

480 x @ 61.33 P.Sft = 29438


###Cement plaster 1:6 upto 20 height (b) 1/2" (S.I.No.13(b)/C-19)

Hall inside 1 x 1 x 2 x 112.00 x 12.50 = 2800


1 x 1 x 2 x 32.00 x 12.50 = 800
Bath inside 1 x 5 x 2 x 5.00 x 8.50 = 425
1 x 5 x 2 x 6.00 x 8.50 = 510
Bath corridor inside 1 x 1 x 2 x 26.67 x 12.50 = 667
1 x 1 x 2 x 5.50 x 12.50 = 138
Passage inside 1 x 1 x 2 x 26.67 x 12.50 = 667
1 x 1 x 2 x 8.00 x 12.50 = 200
Stair case inside 1 x 1 x 2 x 26.67 x 12.50 = 667
1 x 1 x 2 x 12.00 x 12.50 = 300
Step Side1 1 x 1 x 2 x 6.00 x 0.50 = 6
Step Side2 1 x 1 x 2 x 5.00 x 0.50 = 5
Step Side3 1 x 1 x 2 x 4.00 x 0.50 = 4
Step Side4 1 x 1 x 2 x 3.00 x 0.50 = 3
Step Side 5 1 x 1 x 2 x 2.00 x 0.50 = 2
Step Side 6 1 x 1 x 2 x 1.00 x 0.50 = 1

Main Building O/S

Long walls Hall 1 x 1 x 2 x 114.17 x 14.00 = 3197


Short walls Hall 1 x 1 x 2 x 31.17 x 14.00 = 873
L/ w G. Lav/ Passage/ staircase 1 x 1 x 4 x 28.83 x 14.00 = 1614
S/Wall G. Lav / Passage/ Stair case 1 x 1 x 1 x 31.17 x 14.00 = 436
Long walls Bath 1 x 1 x 1 x 28.83 x 14.00 = 404
Short walls Bath 1 x 1 x 4 x 4.00 x 14.00 = 224
= 13942
DEDUCTION
Door 1 x 1 x 5.00 x 0.67 x 7.00 = 23
Door 1 x 2 x 3.50 x 0.67 x 7.00 = 33
Bath Door 1 x 5 x 2.50 x 0.50 x 7.00 = 44
Window 1 x 16 x 5.00 x 0.67 x 6.00 = 322
Ventilator 1 x 5 x 3.00 x 0.50 x 1.50 = 11
= 433

13942 - 433 = = 13509


NET QUANTITY
13509 x @ 531.41 %Sft = 71787

###Cement plaster 1:4 upto 20 height (a) 3/8" thick (S.I.No.11(a)/C-9)


= 13509
Qty same as item NO(15)
13509 x @ 536.14 %Sft = 72426

###Cement concret plan including placing, compacting, finishing and curing complete (including screening
and washing of stone aggregate without shuttering). (H) Ratio1:3:6 (S.I.NO.5 (H) /C-4 ).

Hall 1 x 1 x 112.00 x 32.00 x 0.25 = 896


Bath 1 x 5 x 5.00 x 6.00 x 0.25 = 38
Bath corridor 1 x 1 x 26.67 x 5.50 x 0.25 = 37
Passage 1 x 1 x 26.67 x 8.00 x 0.25 = 53
Stair case 1 x 1 x 26.67 x 12.00 x 0.25 = 80
= 1104

1104 x @ 5001.70 %Sft 55195

###Providing and laying Hala tiles glazed 6" x 6" x 1/4'' on floor or wall facing requires pattern of
styles specification jointed in white cement and pigment over base of 1:2 gray cement mortar 3/4" thick
including washing and filling of joints with slurry of white cement and pigment in desired shape with finishing
cleaning and cost of wax polish etc complete including cutting tiles the proper profile (S.I.No.61/C-8)

Main Building O/S


Long walls Hall 1 x 1 x 2 x 114.17 x 5.00 = 1142
Short walls Hall 1 x 1 x 2 x 31.17 x 5.00 = 312
L/ w G. Lav/ Passage/ staircase 1 x 1 x 1 x 28.83 x 5.00 = 144
S/Wall G. Lav / Passage/ Stair case 1 x 1 x 1 x 31.17 x 5.00 = 156
1753
1753 x @ 17091.69 %Sft 299686

### Providing and laying tiles glazed 6" x 6" x 1/4'' on floor or wall facing requires pattern of
styles specification jointed in white cement and pigment over base of 1:2 gray cement mortar 3/4" thick
including washing and filling of joints with slurry of white cement and pigment in desired shape with finishing
cleaning and cost of wax polish etc complete including cutting tiles the proper profile (S.I.No.61/C-8)

Hall 1 x 1 x 1 x 112.00 x 32.00 = 3584


Dado 1 x 1 x 2 x 112.00 x 3.00 = 672
1 x 1 x 2 x 32.00 x 3.00 = 192
Passage 1 x 1 x 1 x 26.67 x 8.00 = 213
Dado 1 x 1 x 2 x 26.67 x 3.00 = 160
1 x 1 x 2 x 8.00 x 3.00 = 48
Stair Case 1 x 1 x 1 x 26.67 x 12.00 = 320
Dado 1 x 1 x 2 x 26.67 x 3.00 = 160
1 x 1 x 2 x 12.00 x 3.00 = 72
= 5421
5421 x @ 13663.33 %Sft 740749

### Providing and laying tiles glazed 6" x 6" x 1/4'' on floor or wall facing requires pattern of
styles specification jointed in white cement and pigment over base of 1:2 gray cement mortar 3/4" thick
including washing and filling of joints with slurry of white cement and pigment in desired shape with finishing
cleaning and cost of wax polish etc complete including cutting tiles the proper profile (S.I.No.61/C-8)

Bath 1 x 1 x 5 x 5.00 x 6.00 = 150


Dado 1 x 5 x 2 x 5.00 x 6.50 = 325
1 x 5 x 2 x 6.00 x 6.50 = 390
Bath Corridor 1 x 1 x 1 x 26.67 x 5.50 = 147
Dado 1 x 1 x 2 x 26.67 x 6.50 = 347
1 x 1 x 2 x 5.50 x 6.50 = 72
= 1430
1430 x @ 10416.34 %Sft 148943

### Laying white marble flooring fine dressed on the surface without winding set in lime mortar1:2
including rubbing 7 polishing of joints (A) 3/4" thick flooring
Steps Tread & Rise 1 x 1 x 6 x 14.00 x 1.50 = 126
Step Side1 1 x 1 x 2 x 6.00 x 0.50 = 6
Step Side2 1 x 1 x 2 x 5.00 x 0.50 = 5
Step Side3 1 x 1 x 2 x 4.00 x 0.50 = 4
Step Side4 1 x 1 x 2 x 3.00 x 0.50 = 3
Step Side 5 1 x 1 x 2 x 2.00 x 0.50 = 2
Step Side 6 1 x 1 x 2 x 1.00 x 0.50 = 1
= 147
147 x @ 148.06 %PSft 21765

###Providing and laying topping cement concrete 1:2:4 including surface finishing and dividing into panels
© 2" thick (S.I.No.16©/C-8
Over roof 1 x 1 x 1 x 119.36 x 38.67 = 4616
1 x 1 x 1 x 30.01 x 38.67 = 1160
= 5776
5776 x @ 1396.67 %Sft 80674

### Primary coat of chalk under distemper (S.I.No.23/C-9).


Hall Ceiling 1 x 1 x 1 x 112.00 x 32.00 = 3584
BathCeiling 1 x 1 x 5 x 5.00 x 6.00 = 150
Bath corridor ceiling 1 x 1 x 1 x 26.67 x 5.50 = 147
Passage ceiling 1 x 1 x 1 x 26.67 x 8.00 = 213
Stair case ceiling 1 x 1 x 1 x 26.67 x 12.00 = 320
Qty same as item no ( 15 ) = 13509
= 17923
17923 x @ 58.85 %Sft = 10548

### Distempering C-3 Coats (S.I.No. 24© / C-9)


= 17923
Qty same as item no( 21)
17923 x @ 263.51 %Sft = 47229

### Painting new surface © preparing surface and painting of doors and windows any type including
edges (I and II) 3 coats (S.I.No.5© /I and II / C-11).

150 x 2.00 300


Qty same as item no(10)
300.00 x @ 978.95 %Sft = 2937

Total 3259331
)